Network Infrastructure Contracts & Bids
Network infrastructure design, installation, and maintenance including routers, switches, firewalls, wireless access points, LAN/WAN, structured cabling, fiber optics, and SD-WAN, using equipment from vendors such as Cisco, Juniper, Aruba, and Palo Alto Networks for enterprise and campus connectivity.
60 open Network infrastructure opportunities right now — 0 federal, 60 state & local.
Paste your website — we'll show the open government contracts that fit your business.
Free · no signup · we read your homepage once. We don't store your email.
Create a free account and we’ll email you when new Network infrastructure opportunities are posted — scored against your business so you only see the ones that fit.
Network infrastructure contract activity
A current snapshot based on 50 of 60 open listings shown on this page. Counts update with the directory.
- E-Rate (FCC Form 470)22
- Municipal (RSS feeds)14
- Washington WaTech9
- Switzerland (simap)2
- Alberta (APC)1
- Other2
Deadline outlook
- Next 30 days
- 37
- Later
- 3
- Open / rolling
- 10
Most represented buyers
- USA (E-Rate / FCC Form 470)22
- Washington WaTech9
- Switzerland (simap)2
- Alberta (APC)1
- Other16
37 of the listings shown were posted in the last 30 days. E-Rate (FCC Form 470) contributes the largest share (22). USA (E-Rate / FCC Form 470) is the most represented buyer in this snapshot.
- State/localNET-17390 - USA (San Francisco, California) - LAN WAN Infrastructure, Solutions and Maintenance Services - Deadline October 30,2026San Francisco, CA · due Oct 30, 2026
(1) Vendor needs to provide LAN WAN infrastructure, solutions and maintenance services to the government authority located in San Francisco, CA. – Provide local area network and wide area networking solutions, including development consulting, professional services, network design, installation, configuration, ongoing support and maintenance services. – Provide a range of traditional networking services and equipment, and/or cloud–based networking solutions tailored to the needs of new and…
More - State/local043b4139-48c6-437f-93b0-7489499e3784USA (E-Rate / FCC Form 470) · due Oct 22, 2026
Requests bids to provide and install 10 managed 48 port network switches, 5 managed 48 port Power over Ethernet (PoE) switches, 55 WiFi 7 wireless access points. All network cabling has already been run. The bid must include connecting every switch to the network by fiber, installing the access points at the existing cable locations, configuring the equipment, and testing the completed system. New cable runs are not part of this request. Required equipment 10 Standard network switches with 48…
More - State/localNET-17318 - USA (San Bernardino, California) - Infrastructure Equipment, Cabling and Services - Deadline October 27,2026San Bernardino, CA · due Oct 27, 2026
(1) Vendor needs to provide infrastructure equipment, cabling and services to the government authority located in San Bernardino, CA. – Installation of cabling and pathways to support wired and wireless data network systems for classrooms, offices, gymnasiums, libraries, multipurpose rooms, outdoor spaces, high–density wireless environments, and other educational facilities throughout the District, including infrastructure supporting Wi–Fi 6E, Wi–Fi 7, multigigabit connectivity, and future…
More - State/local3ce45ce9-5fc5-4723-bace-202e9b197dadUSA (E-Rate / FCC Form 470) · due Oct 19, 2026
The district is seeking bids/proposals for the purchase only, installation only, and/or purchase and installation of the following: -Unifi 12U Wall Mount Rack or equivalent - 1 ea. -Unifi USW-Pro-Max-48-PoE (720w) Switch or equivalent - 1 ea. -Unifi Cat6 Network Jacks or equivalent - 80 ea. -Cat6 Wall Jack - 40 ea. -40 Network drops in locations designated by district leadership. Installation shall include all parts and labor necessary to make network drops functional.
More - State/local4f255b85-84e9-40c7-afc0-0d2dce875151USA (E-Rate / FCC Form 470) · due Oct 20, 2026
Equipment/Services Requested: 1. Wireless Access Points, as follows: a.Qty 34, Wireless Access Points, FortiAp-231K plus 5 year Forticare Essential Support, FAP-231K-A-ERT-BDL-314-60 or equivalent; b. Qty 2, Wireless Access Points, FortiAP-432G plus 5 year Foritcare Essential Support, FAP-43G-A-ERT-BDL-314-60 or equivalent; 2. Basic Maintenance of above-listed access points. 3. Switches, as follows: a. Qty 2, FortiSwitch-1024E plus 5 year Forticare Essential Support, FS-1024E-ERT-BDL-314-60 or…
More - State/localIFB 2097-02 Wireless Access Points at Four BHA SitesBoston Housing Authority (BHA), MA
Addendum No. 1 has been released. The Boston Housing Authority, the Awarding Authority, invites sealed bids from Contractors for installation of Wireless Access Points at Four BHA sites. The Project consists of: Reviewing the design documents prepared by BHA, the Contractor shall determine the optimal placement of all equipment and make any necessary field adjustments, as well as procure and install all required equipment across four state-funded developments. The scope of work includes the…
More - State/locale7242cd8-b15e-4f24-9d66-ff7cb8c80c73USA (E-Rate / FCC Form 470) · due Oct 20, 2026
Equipment/services requested: 1. Switches, as follows: a. Qty 4, Meraki MS150-48LP-4X, MS150-48LP-4X or equivalent; b. Qty 1, Meraki MS150-48LP-4G, MS150-48LP-4G or equivalent; 2. Basic maintenance of above-listed equipment. 3. Qty 5, Licenses (listed as internal connections), MS-150-48 License, LIC-MS150-48-5Y or equivalent; 4. Components, as follows: a. Qty 5, Power Cord, MA-PWR-CORD-US-FR or equivalent; b. Qty 5, Cable, MA-CBL-100G-50CM-O or equivalent; c. Qty 2, SFP, MA-SFP-10GB-LR or…
More - State/local26-1552 Fully Managed Network Services and Private 5G Test Environment for Wave Tech CentreAlberta (APC) · due Oct 15, 2026
The City is seeking proposals from experienced Proponents to design, supply, implement, and provide ongoing managed services for a fully managed network environment supporting the Wave Tech Centre. The solution will consolidate LAN switching and routing, Wi‑Fi, SD‑WAN, firewalling, and a private 5G test environment into a single, integrated managed service. The network is non‑critical (no mandated 24×7 on‑call support) but must meet defined business‑hours availability, performance, and…
More - State/local26-RFQ-028 Wireline Ethernet/Fixed WirelessWashington WaTech
State of Washington Wireline Ethernet or Fixed Wireless Services Washington Technology Solutions 1 26-RFQ-028 Request for Quotation SOLICITATION FOR ETHERNET WIRELINE or FIXED WIRELESS SERVICES WASHINGTON TECHNOLOGY SOLUTIONS PROCUREMENT NUMBER 26-RFQ-028 Released: June 3, 2026 Responses Due: June 24, 2026 1. It is mandatory that Responding Contractors have a signed Network Services Agreement and Wireline Ethernet Technical Addendum and/or Fixed Wireless Technical Addendum with Washington…
More - State/localc8aa6ee8-91c6-4bf0-8b59-c9a3cceb99a8USA (E-Rate / FCC Form 470) · due Nov 3, 2026
We are seeking a pair of firewalls in a redundant configuration that can support 25Gbps Internet bandwidth with all security functions enabled. Each firewall needs a minimum of (6) SFP+ interfaces and (4) GB interfaces. Security functions should include but are not limited to gateway anti-virus, intrusion prevention, and Internet content filtering. Physical interfaces must be capable of multiple virtual interfaces and firewalls must be capable of performing DHCP relay, support multiple ISP…
More - State/local27-RFQ-011 Wireline Ethernet/Fixed WirelessWashington WaTech
1500 J e ffe rson Stre e t SE | O lym p ia, WA 98504-1501 wate ch.wa.g o v State of Washington Wireline Ethernet or Fixed Wireless Services Washington Technology Solutions 1 27-RFQ-011 Request for Quotation SOLICITATION FOR ETHERNET WIRELINE or FIXED WIRELESS SERVICES WASHINGTON TECHNOLOGY SOLUTIONS PROCUREMENT NUMBER 27-RFQ-011 Released: September 9, 2026 Responses Due: September 30, 2026 1. It is mandatory that Responding Contractors have a signed Network Services Agreement and Wireline…
More - State/local5cee6fef-a7d7-457d-acbf-6e45ef377498USA (E-Rate / FCC Form 470) · due Oct 21, 2026
Requesting proposals for wireless access points' associated software and licenses, network switches' associated software and licenses and firewalls' associated software and license, Offeror requested to include all necessary cabling, licenses, connectors, components, installation, configuration, travel, per diem, shipping and any other applicable fees. The applicant is seeking bundled warranty and licenses including manufacturer maintenance support services (MSS) for equipment listed in the…
More - State/local3a0912a1-66ae-4f17-a8fc-149d87c9fa0dUSA (E-Rate / FCC Form 470) · due Oct 21, 2026
(5) 48 Port POE Manage Switch, CISCO 92L or equivalent with (2) single mode SFP modules each, with stacking cable. (1) Palo Alto 540 or equivalent (10) Ubiquity Pro Access Points or equivalent (2) 2200va UPS (1) 3000va UPS (20) 1 foot CAT 6 patch cords (50) 2 foot CAT 6 patch cords (50) 7 foot CAT 6 patch cords (20) 10 foot CAT 6 patch cords (6) 1M SC-SC SM fiber patch cables ------------------------------------------------------------------------------------------------------------------------…
More - State/local26-RFQ-027 Wireline Ethernet/Fixed WirelessWashington WaTech
State of Washington Wireline Ethernet or Fixed Wireless Services Washington Technology Solutions 1 26-RFQ-027 Request for Quotation SOLICITATION FOR ETHERNET WIRELINE or FIXED WIRELESS SERVICES WASHINGTON TECHNOLOGY SOLUTIONS PROCUREMENT NUMBER 26-RFQ-027 Released: May 20, 2026 Responses Due: June 10, 2026 1. It is mandatory that Responding Contractors have a signed Network Services Agreement and Wireline Ethernet Technical Addendum and/or Fixed Wireless Technical Addendum with Washington…
More - State/localb48078aa-f733-4fb1-a516-e903eba16c52USA (E-Rate / FCC Form 470) · due Oct 28, 2026
Requesting proposals for network switches' associated software and licenses and firewalls' associated software and license. Offeror requested to include all necessary cabling, licenses, connectors, components, installation, configuration, travel, per diem, shipping and any other applicable fees. The applicant is seeking bundled warranty and licenses including manufacturer maintenance support services (MSS) for equipment listed in the RFP and proposed solutions may include products and services…
More - State/local5aa023da-753c-4eae-b3fe-cfae65e4228dUSA (E-Rate / FCC Form 470) · due Oct 25, 2026
(5) 48 Port POE Manage Switch, CISCO 92L or equivalent with (2) single mode SFP modules each, with stacking cable.(1) Palo Alto 540 or equivalent (10) Ubiquity Pro Access Points or equivalent (2) 2200va UPS (1) 3000va UPS (20) 1 foot CAT 6 patch cords (50) 2 foot CAT 6 patch cords (50) 7 foot CAT 6 patch cords (20) 10 foot CAT 6 patch cords (6) IM SC-SC SM fiber patch cables * Vendor pricelists will not be considered. * National Security Supply Chain Restrictions Equipment or services produced…
More - State/local26-RFQ-030 Wireline Ethernet/Fixed WirelessWashington WaTech
State of Washington Wireline Ethernet or Fixed Wireless Services Washington Technology Solutions 1 26-RFQ-030 Request for Quotation SOLICITATION FOR ETHERNET WIRELINE or FIXED WIRELESS SERVICES WASHINGTON TECHNOLOGY SOLUTIONS PROCUREMENT NUMBER 26-RFQ-030 Released: June 17, 2026 Responses Due: July 8, 2026 1. It is mandatory that Responding Contractors have a signed Network Services Agreement and Wireline Ethernet Technical Addendum and/or Fixed Wireless Technical Addendum with Washington…
More - State/localNET-17346 - USA (Lubbock, Texas) - E-Rate Wireless Access Point Refresh Service - Deadline November 5,2026Lubbock, TX · due Nov 5, 2026
(1) Vendor needs to provide E–rate wireless access point refresh service to the government authority located in Lubbock, TX.• Minimum Wireless Requirements– IEEE 802.11be (Wi–Fi 7) capability and applicable prior wireless standards.– Tri–band operation utilizing 2.4 GHz, 5 GHz, and 6 GHz spectrum where applicable.– Access point shall support 4x4 antennas on tri–band (2.4 GHz, 5 GHz, and 6 GHz).– Wi–Fi 7 Multi–Link Operation (MLO).– Multigigabit Ethernet connectivity appropriate for the…
More - State/localNET-17180 - USA (Orlando, Florida) - Comprehensive Network and Wi-Fi System - Deadline October 20,2026Orlando, FL · due Oct 20, 2026
(1) Vendor needs to provide comprehensive network and Wi–Fi system to the government authority located in Orlando, FL.• The objective is to replace the core network, including all edge switching, and the wi–fi system in the stadium.• The project involves the design and installation of a robust network and wi–fi infrastructure for an approximately 66,000–seat outdoor football stadium, including switches, wi–fi access points, and related equipment, to ensure seamless connectivity for fans,…
More - State/local27-RFQ-010 Wireline Ethernet/Fixed WirelessWashington WaTech
1500 Jefferson Street SE | Olympia, WA 98504-1501 watech.wa.gov State of Washington Wireline Ethernet or Fixed Wireless Services Washington Technology Solutions 1 27-RFQ-010 Request for Quotation SOLICITATION FOR ETHERNET WIRELINE or FIXED WIRELESS SERVICES WASHINGTON TECHNOLOGY SOLUTIONS PROCUREMENT NUMBER 27-RFQ-010 Released: August 26, 2026 Responses Due: September 16, 2026 1. It is mandatory that Responding Contractors have a signed Network Services Agreement and Wireline Ethernet…
More - State/local27-RFQ-004 Wireline Ethernet/Fixed WirelessWashington WaTech
Request for Quotation SOLICITATION FOR ETHERNET WIRELINE or FIXED WIRELESS SERVICES WASHINGTON TECHNOLOGY SOLUTIONS PROCUREMENT NUMBER 27-RFQ-004 Released: July 15 2026 Responses Due: August 5, 2026 It is mandatory that Responding Contractors have a signed Network Services Agreement and Wireline Ethernet Technical Addendum and/or Fixed Wireless Technical Addendum with Washington Technology Solutions (“WaTech”) in order to participate in and/or provide a response to this solicitation. Responses…
More - State/localFachhochschulzentrum Graubünden (FHZGR), Chur / BKP 235.11 Aktivkomponenten NetzwerkSwitzerland (simap) · due Oct 20, 2026
Beschaffung von Cisco-Netzwerkkomponenten zur Erweiterung der bestehenden Campus-Infrastruktur. Aus Gründen der technischen Interoperabilität, des nahtlosen Layer-3-Routings sowie zur Sicherung bestehender Software-Lizenzen (Enterprise-Agreements) muss das gesamte Netzwerksystem vollumfänglich und nativ kompatibel zur bestehenden Cisco-Infrastruktur im direkt anliegenden Gebäude sein. Ein Systemwechsel oder der Einsatz von Fremdherstellern bei den Switches würde die Nutzung der bestehenden…
More - State/localUbiquiti Security Camera, Network Equipment, and Supporting Hardware InstallationCounty of San Mateo · due Nov 19, 2026
The San Mateo County Sheriff's Office (SMCSO) provides law enforcement, custody, and public safety services throughout San Mateo County, serving a diverse and dynamic population across urban, suburban, and coastal communities. The SMCSO Emergency Services Bureau is seeking proposals from well-qualified vendors to install a network security camera system in remote radio communications sites to improve site security and enable remote monitoring. The project includes mounting exterior IP security…
More - State/local27-RFQ-006 Wireline Ethernet/Fixed WirelessWashington WaTech
1500 Jefferson Street SE | Olympia, WA 98504-1501 watech.wa.gov State of Washington Wireline Ethernet or Fixed Wireless Services Washington Technology Solutions 1 27-RFQ-005 Request for Quotation SOLICITATION FOR ETHERNET WIRELINE or FIXED WIRELESS SERVICES WASHINGTON TECHNOLOGY SOLUTIONS PROCUREMENT NUMBER 27-RFQ-006 Released: July 29, 2026 Responses Due: August 19, 2026 1. It is mandatory that Responding Contractors have a signed Network Services Agreement and Wireline Ethernet Technical…
More - State/localNET-17282 - USA (Pompano Beach, Florida) - Dispatch Network Re-Design Service - Deadline November 3,2026Pompano Beach, FL · due Nov 3, 2026
(1) Vendor needs to provide dispatch network re–design service to the government authority located in Pompano Beach, FL. – Dispatch and positive train control (PTC) networks and recommend a consolidated, secure, and resilient network design. – The project will include the redesign, documentation, configuration, and testing of the enterprise network spanning six (6) data centers and forty–nine (49) wayside locations, a testing and staging laboratory, a detailed migration and cutover plan for…
More - State/local564a8e56-11b6-4608-8948-2fbb401db31dUSA (E-Rate / FCC Form 470) · due Nov 5, 2026
(14) Access points (Ubiquity or equivalent) (18) Single Cat6 data drops (Avg 150 each test and label) (3) Wireless Bridges (1) 24 port POE switch (Ubiquity or equivalent) (1) 2x2 Wall mount cabinet in new building (1) 24 port Cat6 patch panel in MDF See details here: https://erateprofessionals.box.com/s/vqg4dsyuozp2pe9s31ej60krl6n3ydh9 * Vendor pricelists will not be considered. * National Security Supply Chain Restrictions Equipment or services produced or provided by a company that the FCC…
More - State/local26-RFQ-026 Wireline Ethernet/Fixed WirelessWashington WaTech
Request for Quotation SOLICITATION FOR ETHERNET WIRELINE or FIXED WIRELESS SERVICES WASHINGTON TECHNOLOGY SOLUTIONS PROCUREMENT NUMBER 26-RFQ-026 Released: May 13, 2026 Responses Due: May 27, 2026 It is mandatory that Responding Contractors have a signed Network Services Agreement and Wireline Ethernet Technical Addendum and/or Fixed Wireless Technical Addendum with Washington Technology Solutions (“WaTech”) in order to participate in and/or provide a response to this solicitation. Responses…
More - State/localNET-17377 - South Africa - Internet and Wide Area Network (WAN) Connectivity Services - Deadline October 16,2026RFPMart: Networking Services & Supplies · due Oct 16, 2026
(1) Vendor needs to provide internet and Wide Area Network (WAN) connectivity services. – Agency seeks to appoint a competent service provider who will assist the Entity in the relocation of the current equipment, implementation, monitoring, maintenance and support of the entity’s wide area network (WAN) connectivity and internet services infrastructure.– New or Upgrade Dedicated Layer 2 Point–to–Point fibre link between the offices from 150mbps to 300mbps to handle ALL private/confidential…
More - State/localc09c68f5-d39c-4044-ad87-1cb6141a4455USA (E-Rate / FCC Form 470) · due Oct 20, 2026
District seeks switches, multiplexers, wireless access points, Gbics, fiber patch cables, Cat6 patch cables, uplink cable, UPS equipment and installation/configuration of all components as identified in RFP.
More - State/localNET-17355 - USA (Linden, New Jersey) - Network Engineering Services - Deadline November 6,2026Linden, NJ · due Nov 6, 2026
(1) Vendor needs to provide network engineering services to the government authority located in Linden, NJ. • Configure, maintain, monitor and assess the agency’s network infrastructure and data centre for its data, video, audio requirements.• Manage the security, performance and reliability of networks and systems in a local government environment.• Identify and resolve issues, and accommodate needs and facilitation of repairs to ensure minimal interruption of network services.• Plan,…
More - State/localNET-17132 - USA (Katy, Texas) - Wired, Wireless and Internet Services - Deadline October 27,2026Katy, TX · due Oct 27, 2026
(1) Vendor needs to provide wired, wireless and internet services to the government authority located in Katy, TX.– For Internet access, current services are with 2 active 100Gbps of 10Gbps burstable to 100G.– References to the Juniper MX304 are intended to establish a minimum standard of performance, scalability, resiliency, and functionality; functionally equivalent equipment will be considered in accordance with applicable E–rate requirements.– Provider internet edge routing and shall…
More - State/localNET-17401 - USA (Rocklin, California) - Cabling Infrastructure Service - Deadline December 9,2026Rocklin, CA · due Dec 9, 2026
(1) Vendor needs to provide cabling infrastructure service to the government authority located in Rocklin, CA. – Provides the district’s rough field estimate of existing conditions at the two (2) school sites covered.– CAT6A horizontal cabling from each agency to classroom and specified spaces. – CAT6A cabling for wireless access point connections in classrooms.– Requirements for Cabling Infrastructures– Manufacturer must warrant all parts and equipment.– Manufacturer must warrant all cabling…
More - State/localNET-17302 - USA (Olathe, Kansas) - Structured Data Cabling Services - Deadline October 26,2026Olathe, KS · due Oct 26, 2026
(1) Vendor needs to provide structured data cabling services to the government authority located in Olathe, KS.– Installation of Cat6A Ethernet cabling to designated classrooms, offices, and communal areas.– Installation of all physical cable management hardware including but not limited to “J–hooks” in accessible ceiling areas, cable trays, conduits, ladder–type cable racks within telecommunication rooms, and “D–rings” on backboards and equipment racks or cabinets or frames.– Installation…
More - State/localNET-17232 - USA (Port Angeles, Washington) - Airport Cybersecurity Operations Center and Disaster Recovery Network Infrastructure Services - Deadline October 16,2026Port Angeles, WA · due Oct 16, 2026
(1) Vendor needs to provide airport cybersecurity operations center and disaster recovery network infrastructure services to the government authority located in Port Angeles, WA.• Provide a temporary capability and improve continuity of critical information technology services.• Improve resilience against natural disasters, utility failures, and cybersecurity incidents.• Provide secure, redundant Internet connectivity and support recovery operations.• Deploy infrastructure that can support…
More - State/localFulton Public Schools currently has a hub and spoke WAN consisting of 10 Gb/s fiber connected with HP/Aruba equipment within the schools. Each school is a separate VLAN which is currently routed at the edge buildings. Voice traffic is carried between schools in a separate VLAN. The data center is located at the High School at 1 Hornet Drive. Please see Table A on the attached RFP for site address specification. The district is seeking a 4-year term, and service to be fully operational no later than July 1, 2027. Questions must be submitted in writing to the attention of Dan Hedgpath via email at dhedgpath@fulton58.org no later than 10/9/2026. Questions received after the deadline will not be responded to. Questions and responses will be posted on the EPC portal site through an addendum. Proposals should be emailed to Dan Hedgpath at dhedgpath@fulton58.org on or before 2p local time 10/23/2026.USA (E-Rate / FCC Form 470) · due Oct 26, 2026
Fulton Public Schools currently has a hub and spoke WAN consisting of 10 Gb/s fiber connected with HP/Aruba equipment within the schools. Each school is a separate VLAN which is currently routed at the edge buildings. Voice traffic is carried between schools in a separate VLAN. The data center is located at the High School at 1 Hornet Drive. Please see Table A on the attached RFP for site address specification. The district is seeking a 4-year term, and service to be fully operational no later…
More - State/localNET-17303 - USA (Ferguson, Missouri) - Citywide Managed Fiber Network, Internet, and On-Demand WAN Services - Deadline October 16,2026Ferguson, MO · due Oct 16, 2026
(1) Vendor needs to provide citywide managed fiber network, internet, and on–demand wan services to the government authority located in Ferguson, MO.• Dynamic Bandwidth Scaling: Ability to self–serve, provision, and rapidly scale bandwidth up or down via a central web–portal. • Dynamic Site–to–Site or City–Wide VLAN scaling: Ability to self–serve, provision, and rapidly add and remove VLANS and create city–wide or site to site links via a central web–portal. • Integrated Secure Access:…
More - State/localInternet access 1G to 5G. Fiber preferred. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- * Do not quote if you cannot guarantee service delivery. * Quotes marked "budgetary" will not be considered. * Vendor pricelists will not be considered. * National Security Supply Chain Restrictions Equipment or services produced or provided by a company that the FCC has designated as a national security threat to the integrity of communications networks or the communications supply chain are not eligible for E-Rate support. 47 CFR 54.9(a). In addition, participants are prohibited from using E-Rate support to purchase, rent, lease, or otherwise obtain any covered communications equipment or service, or maintain any covered communications equipment or service previously purchased, rented, leased, or otherwise obtained. 47 CFR 54.10. * List of restricted equipment: https://www.fcc.gov/supplychain/coveredlist. * Contract should provide the ability to upgrade bandwidth without increasing the original term of contract. * Include all costs associated with delivering service including taxes and fees. * SPI Invoicing only. * If selected vendor cannot deliver services as quoted, they agree to pay all legal fees. * Include leased router. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ https://erateprofessionals.app.box.com/f/f4df9658c01b436aaeed3a5de71c4b00USA (E-Rate / FCC Form 470) · due Oct 23, 2026
Internet access 1G to 5G. Fiber preferred. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- * Do not quote if you cannot guarantee service delivery. * Quotes marked "budgetary" will not be considered. * Vendor pricelists will not be considered. * National Security Supply Chain Restrictions Equipment or services produced…
More - State/local1edbaee0-f56d-4e9e-af4e-50b4413abaecUSA (E-Rate / FCC Form 470) · due Oct 28, 2026
The applicant wishes to purchases wit the optoin to intall and configure the followiong: 50 Cisco CW9174I AP 4 Cisco CW9176I APs 110 five-year Cisco AP licenses 3 Cisco C9350-24HX switches with five-year operating license 6 compatible 10G SFP+ LR transceivers Neeeded power supplies to enable POE for 24 APs 1 Fortinet FortiCloud subscription renewal SKU: FC-10-F200F-131-02-60 Replace the data drops for 56 APs with Cat 6A cable - Includes: new patch panels, patch cables, labeling, and…
More - State/local8ea715d1-0752-4f2e-b1a2-1463157ebaf6USA (E-Rate / FCC Form 470) · due Oct 30, 2026
SEE RFP The current Form 470 format requires the unit quantity. This procurement is bid on the quantity of one (1) to establish a unit contract price. However, over the contract period and with up to 3000 potential entities, purchased quantities will vary greatly. Since 2015, over $534 million has been requested as the pre-discount cost for E-Rate eligible equipment and services using the NCDPI State Master Contracts. Note: NCDPI is not the Billed Entity - participating Public School Units…
More - State/localNET-17215 - USA (Kissimmee, Florida) - Internet, Wide Area Network and Special Construction Installation Services - Deadline November 12,2026Kissimmee, FL · due Nov 12, 2026
(1) Vendor needs to provide internet, wide area network and special construction installation services to the government authority located in Kissimmee, FL.– Internet Access with Distributed Denial of Services.– Leased Lit or Leased Dark fiber wide area network (WAN) and related services.– Include high–bandwidth public Internet access services delivered by a single–homed connection.– Requires scalable public Internet connectivity with an initial bandwidth of 25 Gbps.– Connection shall support…
More - State/local8ee0d090-c68e-4acf-877c-2043dc07a295USA (E-Rate / FCC Form 470) · due Oct 23, 2026
(1) 2x2 open swing hinge rack (1) 12 Port POE switch - Ubiquity or equivalent (2) Wireless Access Point - Ubiquity or equivalent (1) 24 Port Cat6 Patch Panel (24) 3' Cat6 patch cables (24) 7' Cat6 patch cables (3) 750va UPS (2) 1500va UPS -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------…
More - State/local12f898ad-a001-4fe4-b4cb-f3067f0aee86USA (E-Rate / FCC Form 470) · due Oct 29, 2026
Economic Improvement Council, Inc. is seeking bids for Category 2 E Rate Eligible Internal Connections. No RFP is being issued; all requested equipment and services are listed below. Vendors may submit bids on any or all items. EIC requests pricing for the following Internal Connections components: Network Switches Quantity 25 Mix of 1524 port and 1048 port switches. PoE capable models preferred where applicable. Firewall Quantity 1 Next generation firewall capable of supporting organizational…
More - State/local39674ae3-eb5e-4880-b4d5-b09959be81a1USA (E-Rate / FCC Form 470) · due Nov 4, 2026
The SBCC is seeking proposals for a quantity of up to 820 Aruba CX 6300M or equivalent 48-Port Copper Multi-Rate Gigabit Ethernet Switches. Proposals must include all necessary hardware, two (2) hot-swappable power supplies per switch, fan modules, rack mount kits, and stacking accessories (including stacking DAC cables or transceivers per switch at least 3 meter in length) required to achieve full, redundant operation. Proposals must also include any applicable licensing costs in increments…
More - State/local27-RFQ-014 Wireline Ethernet/Fixed WirelessWashington WaTech
1500 Jefferson Street SE | Olympia, WA 98504-1501 watech.wa.gov State of Washington Wireline Ethernet or Fixed Wireless Services Washington Technology Solutions 1 27-RFQ-014 Request for Quotation SOLICITATION FOR ETHERNET WIRELINE or FIXED WIRELESS SERVICES WASHINGTON TECHNOLOGY SOLUTIONS PROCUREMENT NUMBER 27-RFQ-014 Released: October 7, 2026 Responses Due: October 28, 2026 1. It is mandatory that Responding Contractors have a signed Network Services Agreement and Wireline Ethernet Technical…
More - State/localFachhochschulzentrum Graubünden (FHZGR), Chur / BKP 235.13 Schwachstromapparate WLANSwitzerland (simap) · due Oct 20, 2026
Das bestehende Nachbargebäude wird über eine zentrale Cisco-WLAN-Architektur versorgt. Die IT-Infrastruktur des Neubaus wird physisch und logisch an dieses bestehende System gekoppelt. Aus Gründen der technischen Interoperabilität, des unterbrechungsfreien VoIP-Betriebs sowie zur Sicherung bestehender Investitionen muss das neue WLAN-System vollumfänglich und nativ kompatibel zur bestehenden Cisco-Infrastruktur im direkt anliegenden Gebäude sein.
More - State/localba19fbd8-edca-4afb-87be-5dea49d3d4b1USA (E-Rate / FCC Form 470) · due Oct 30, 2026
See RFP for details. Quantities are approximate, more or less may be needed. Racks are only bid out in case brackets, etc are needed for cabling. MIBS is bid out for two switches in case the Aruba or equivalent need that for the licenses.
More - State/localALL QUESTIONS/BIDS SHOULD BE SENT TO 470NO@OCERATE.COM Seeking the following Internet/WAN connections: 1. Fiber Internet Access - 5Gbps or similar/upgrade Location - Nashoba Regional High school (12 Green Road, Bolton, MA, 01740) 2. Fiber WAN (Wide Area Network) connections, EVPL or equivalent, to Nashoba Regional High School, quantity 6, 3Gbps or similar/upgrade for each of the 6 connections: Location 1 - Mary Rowlandson Elementary School (103 Hollywood Dr, Lancaster, MA 01523) Location 2 - Luther Burbank Middle School (1 Hollywood Dr, Lancaster, MA 01523) Location 3 - Florence Sawyer School (100 Mechanic St, Bolton, MA 01740) Location 4 - Florence Sawyer School Emerson Wing (50 Mechanic St, Bolton, MA 01740) Location 5 - Center School (403 Great Rd, Stow, MA 01775) Location 6 - Hale Middle School (55 Hartley Rd, Stow, MA 01775) 3. Fiber Hub Port, quantity 2, 10GB or similar/upgrade for each. Location - Nashoba Regional High school (12 Green Road, Bolton, MA, 01740) Seeking IP block of 30 or similar. Seeking separate pricing for DDoS mitigation or equivalent. Request includes all other necessary Internet related services. Pricing for regulatory fees and similar should be provided (estimations are acceptable). Installation (including special construction), Initial Configuration, Maintenance and Technical Support are potential requests if needed. Please note, service to Nashoba Regional High School (12 Green Road, Bolton, MA, 01740) will be for a NEW building. The new high school will be constructed at the same address as the old/existing high school. Installation and related work shall begin approximately March 2027, with all Internet and WAN services fully installed, tested, and operational no later than June 1, 2027. Bidders shall coordinate all installation activities with the District to accommodate this transition. District is seeking a 36-month agreement or similar, starting July 1, 2027. District is seeking one vendor to provide BOTH Internet and WAN connections. Bids that do not include costs for both services will be disqualified.USA (E-Rate / FCC Form 470) · due Nov 3, 2026
ALL QUESTIONS/BIDS SHOULD BE SENT TO 470NO@OCERATE.COM Seeking the following Internet/WAN connections: 1. Fiber Internet Access - 5Gbps or similar/upgrade Location - Nashoba Regional High school (12 Green Road, Bolton, MA, 01740) 2. Fiber WAN (Wide Area Network) connections, EVPL or equivalent, to Nashoba Regional High School, quantity 6, 3Gbps or similar/upgrade for each of the 6 connections: Location 1 - Mary Rowlandson Elementary School (103 Hollywood Dr, Lancaster, MA 01523) Location 2 -…
More - State/localed3937ac-3403-416f-b5fd-3fa6c2a4dedeUSA (E-Rate / FCC Form 470) · due Oct 15, 2026
There are RFP documents that provide greater detail on the scope of this project. It is important that service providers read the attached documents to fully understand this project and prepare a more directed bid. Indianapolis Public Schools (IPS) is soliciting competitive proposals through this Request for Proposals (RFP) in accordance with applicable Indiana Code, IPS policies, and IPS administrative guidelines. IPS is upgrading and/or adding wireless capacity at locations throughout the…
More - State/localNET-17224 - USA (Bradenton, Florida) - Internal Connections District E-Rate Equipment Service - Deadline October 29,2026Bradenton, FL · due Oct 29, 2026
(1) Vendor needs to provide internal connections district e–rate equipment service to the government authority located in Bradenton, FL. – E–rate program makes telecommunications and information services more affordable for schools and libraries with funding from the universal service fund, e–rate”provides discounts for telecommunications, internet access and internal connections to eligible schools and libraries.– HPE Aruba Networking CX 6405 v2 Switch – HPE Aruba Networking CX 5420 6–slot…
More - State/local4eff39d6-18cc-4c0a-ab28-5a4442086f89USA (E-Rate / FCC Form 470) · due Oct 16, 2026
FOR ALL SERVICES REQUESTED ON THE FORM 470, SEE SPECIFICATIONS LISTED IN THE RFP located at https:// erate.esc12.net/R12/ For all of the items/services listed in this Form 470, the following applies: When submitting proposals, please consider services that are equivalent, more or less in quantity, better, and/or more cost-effective. Any request for installation/configuration and Technical support depends on the needs of the requested service. Any installation that is eligible for installment…
More
Frequently asked
60 open Network infrastructure opportunities are posted right now — 0 federal and 60 state & local — updated daily.
GovBidAlerts matches open federal (SAM.gov), state, and local solicitations to the Network infrastructure category with AI, so you can browse Network infrastructure bids and RFPs across every level of government in one place.
Federal award history by NAICS code
Federal buyers file Network infrastructure under these industry codes. Each code page shows who has won that work, which agencies buy it, and typical award sizes.