IFBopen🌐 Metropolitan Washington Airports AuthorityIFB-26-21670
Air Operations Area Perimeter & Fence Line Enhancements, IAD
Metropolitan Washington Airports Authority
Description
The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the Perimeter and Fence Line Enhancement at Washington Dulles International Airport (IAD). Work includes but not limited to: Repair and replacement of 15,782 L.F. (2.99 Miles) of AOA Perimeter Security Fence; Construction of 20,100 L.F. (3.80 miles) of 20’ Wide Gravel Roadway; 4 Box Culverts and Stormwater Management Facilities; Phased E&S for earthwork activities; 564 L.F. of Stream Impacts and 0.5 acres of Wetlands Impacts; Balance of Earthwork is Filled.
Details?
- Posted
- May 12, 2026
- Response deadline
- Jul 21, 2026, 11:59 PM UTC (11d)
- Type
- IFB
- Category
- Construction
- Status
- open
- Set-aside
- SLBE Requirement: 25%
- Buyer
- Metropolitan Washington Airports Authority
- Jurisdiction
- Metropolitan Washington Airports Authority
- Reference #
- IFB-26-21670
- Heading
- IFB-26-21670: Air Operations Area Perimeter & Fence Line Enhancements, IAD
- Slbe Requirement
- 25%
- Amendments Issued
- Three
Finding similar opportunities…
This listing is a summary from Metropolitan Washington Airports Authority's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.