GovBidAlerts
← My Opportunities
IFBopen🌐 Metropolitan Washington Airports AuthorityIFB-26-21670

Air Operations Area Perimeter & Fence Line Enhancements, IAD

Metropolitan Washington Airports Authority

Description

The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the Perimeter and Fence Line Enhancement at Washington Dulles International Airport (IAD). Work includes but not limited to: Repair and replacement of 15,782 L.F. (2.99 Miles) of AOA Perimeter Security Fence; Construction of 20,100 L.F. (3.80 miles) of 20’ Wide Gravel Roadway; 4 Box Culverts and Stormwater Management Facilities; Phased E&S for earthwork activities; 564 L.F. of Stream Impacts and 0.5 acres of Wetlands Impacts; Balance of Earthwork is Filled.

Details

Posted
May 12, 2026
Response deadline
Jul 21, 2026, 11:59 PM UTC (11d)
Type
IFB
Category
Construction
Status
open
Set-aside
SLBE Requirement: 25%
Buyer
Metropolitan Washington Airports Authority
Jurisdiction
Metropolitan Washington Airports Authority
Reference #
IFB-26-21670
Heading
IFB-26-21670: Air Operations Area Perimeter & Fence Line Enhancements, IAD
Slbe Requirement
25%
Amendments Issued
Three
Finding similar opportunities…

This listing is a summary from Metropolitan Washington Airports Authority's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.