closed🌐 City of Pasadena2025-IFB-CIV-0517
ITS Projects and Traffic Flow Improvements Project - Within Affected SR-710 Corridors
City of Pasadena / Public Works Department, Engineering
Description
The ITS Projects and Traffic Flow Improvements Project within affected SR-710 Corridors includes the design and implementation of ITS assets along the selected signalized intersections and integration of these assets into the DOT multi-modal transportation network. Integration will feature point to point connectivity through fiber optics for communications at some locations. The installation of hardware consists of, but not limited to, upgrading 18 type 337 cabinets to type 332 cabinets, traffic controllers, audible pedestrian push buttons, vehicle detection equipment technology, conduits, conductors, pull boxes, and miscellaneous appurtenant work for up to 28 signalized intersections along Orange Grove Boulevard, Colorado Boulevard, Green Street, and Holly Street.
Details?
- Posted
- Nov 18, 2025
- Response deadline
- Dec 11, 2025, 10:00 PM UTC
- Status
- closed
- Buyer
- City of Pasadena
- Department
- Public Works Department, Engineering
- Jurisdiction
- City of Pasadena
- Reference #
- 2025-IFB-CIV-0517
- Has Description
- true
Finding similar opportunities…
This listing is a summary from City of Pasadena's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.