GovBidAlerts
← All opportunities
This notice has been superseded. See the latest notice: Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota (Solicitation)

Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota

Key dates

Posted
Jul 21, 2026
Response deadline
Aug 20, 2026, 3:00 PM UTC
Archive date
Sep 30, 2026
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Set-aside code
SBA
PSC
Z2BD

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
US ARMY CORPS OF ENGINEERS / ENGINEER DIVISION NORTHWESTERN / ENDIST OMAHA / W071 ENDIST OMAHA
Office code
021.2100.USACE.NWD.NWO.W9128F
Organization type
OFFICE
Office address
OMAHA, NE, 68102-4901, USA

Place of performance

Street
Minot Air Force Base, Minot, North Dakota
Street 2
City
State
Zip
Country

Contacts

Description

Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs. 340 ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 inch drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
cda52c6373d747f2b8ca85c14522028c
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST OMAHA.W071 ENDIST OMAHA
Office code
021.2100.USACE.NWD.NWO.W9128F
Ingested
Jul 22, 2026
Updated
Jul 23, 2026