PresolicitationActiveW9128F26RA107
Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota
DEPT OF DEFENSE / DEPT OF THE ARMY / W071 ENDIST OMAHAKey dates?
- Posted?
- Jun 9, 2026
- Response deadline?
- —
- Archive date?
- —
- Archive type?
- autocustom
Classification?
- Notice type?
- Presolicitation
- Base type?
- Presolicitation
- Set-aside?
- Total Small Business Set-Aside (FAR 19.5)
- Set-aside code?
- SBA
- PSC?
- Z2BD
NAICS?
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE ARMY
- Office?
- W071 ENDIST OMAHA
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- OMAHA, NE, 68102-4901, USA
Place of performance?
- Street?
- Minot Air Force Base, Minot, North Dakota
- Street 2?
- —
- City?
- —
- State?
- —
- Zip?
- —
- Country?
- —
Contacts?
- Shayna Zeleznikprimary
Description?
On or about 25 June 2026, the Government intends to issue a solicitation for Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5? narrower than the western half south of the MPA centerline taxiway (335? vs. 340?). This project will establish a uniform MPA width of 340? south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2? drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.
Other notices in this solicitation?
Similar open contracts
Metadata?
- Notice ID?
- 623323630a9e43c988bd51d117034359
- Full path?
- DEPT OF DEFENSE.DEPT OF THE ARMY.W071 ENDIST OMAHA
- Office code?
- —
- Ingested?
- Jun 12, 2026
- Updated?
- Jul 1, 2026