GovBidAlerts
← All opportunities

Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota

Key dates

Posted
Jun 9, 2026
Response deadline
Archive date
Archive type
autocustom

Classification

Notice type
Presolicitation
Base type
Presolicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Set-aside code
SBA
PSC
Z2BD

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W071 ENDIST OMAHA
Office code
021.2100.USACE.NWD.NWO.W9128F
Organization type
OFFICE
Office address
OMAHA, NE, 68102-4901, USA

Place of performance

Street
Minot Air Force Base, Minot, North Dakota
Street 2
City
State
Zip
Country

Contacts

Description

On or about 25 June 2026, the Government intends to issue a solicitation for Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 feet narrower than the western half south of the MPA centerline taxiway (335 ft vs. 340ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 inch drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
3347ff1afa50417994888bb9802cc46c
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W071 ENDIST OMAHA
Office code
021.2100.USACE.NWD.NWO.W9128F
Ingested
Jun 10, 2026
Updated
Jul 1, 2026