Sidewalk Repair contracts, bids & RFPs in Alaska
Sidewalk construction, repair, and replacement including concrete flatwork, curb ramps, ADA accessibility upgrades, trip-hazard grinding, curb and gutter, and pedestrian walkway installation along streets and public rights-of-way.
21 open sidewalk repair solicitations in Alaska · updated Nov 19
Paste your website — we'll show the open government contracts that fit your business.
Free · no signup · we read your homepage once. We don't store your email.
Get new Alaska sidewalk repair bids by email
Create a free account and we’ll save this search for you, then email you when new Alaska sidewalk repair solicitations post. No credit card required.
Email me new Alaska sidewalk repair bidsSidewalk repair activity in Alaska
A current snapshot based on 21 listings shown on this page. Counts update with the directory.
- Alaska DOT&PF20
- Alaska (state)1
Deadline outlook
- Next 30 days
- 4
- Later
- 16
- Open / rolling
- 1
Most represented buyers
- Alaska DOT&PF20
0 of the listings shown were posted in the last 30 days. Alaska DOT&PF contributes the largest share (20). Alaska DOT&PF is the most represented buyer in this snapshot.
Open sidewalk repair solicitations in Alaska
- SOLDOTNA: REDOUBT AVE & SMITH WAY REHABILITATIONAlaska DOT&PFAlaska DOT&PFPosted —Due Mar 1, 2027
This project will reconstruct two abutting roadways: Redoubt Ave (east of N Binkley St) and Smith Way to meet all current design standards adopted by DOT&PF. Work includes replacing pavement structural sections for the roadway, sidewalks and shared-use-pathways; ADA improvements for sidewalks and curb ramps; roadside hardware; intersection improvements; and drainage improvements.
More - HSIP: 5TH AVE: CONCRETE ST TO KARLUK ST PEDESTRIAN IMPROVMNTAlaska DOT&PFAlaska DOT&PFPosted —Due Dec 31, 2026
This HSIP project will construct a median barrier on 5th Avenue between Concrete Street and the couplet of 5th and 6th Avenues (Karluk Street). Work may include roadside hardware, drainage, improvements, and utilities.
More - HSIP: BOGARD AT ENGSTROM RD/GREEN FOREST DR INTER IMPAlaska DOT&PFAlaska DOT&PFPosted —Due Dec 30, 2026
Reconstruction, roadside hardware, drainage improvements, intersection improvements, ADA improvements, and utilities.
More - AMATS: N LIGHTS BLVD -MINNESOTA DR - SEWARD HWY SIDEWALK REPAlaska DOT&PFAlaska DOT&PFPosted —Due Oct 1, 2027
This project will perform spot repairs to the North and South sidewalks of Northern Lights Boulevard between the Seward Highway and Minnesota Drive to restore damaged and deteriorating sections of sidewalk, and to complete ADA improvements where needed. This project will likely be phased, with sidewalk work on the south side delivered before work on the north side. The tentative advertise date and engineer’s estimate range reflect the scope for the south side only.
More - Abbott Rd Pavement Preservation: New Seward Hwy to Lake OtisAlaska DOT&PFAlaska DOT&PFPosted —Due Dec 15, 2026
This is a pavement preservation project for Abbott Road from New Seward Highway to Lake Otis Parkway. Project will resurface and re-stripe the existing roadway and upgrade curb ramps in accordance with the Americans With Disabilities Act (ADA). Project may also include structural section improvements, minor upgrades to signal, lightning, and/or traffic recording equipment, roadside hardware, drainage improvements, and utility relocations or adjustments.
More - KDK ADA IMPROVEMENTS SEGMENT 5 REZANOF DRIVEAlaska DOT&PFAlaska DOT&PFPosted —Due Nov 30, 2027
ADA Improvements to Kodiak Stage 1, Segment 5 of the Southcoast ADA Audit. Scope of work to include sidewalk, curb ramp, driveway and street crossing improvements consistent with findings in the 2017 Southcoast ADA Audit.
More - GLENN HWY & HILAND RD INTERCHANGE IMPROVEMENTSAlaska DOT&PFAlaska DOT&PFPosted —Due Jan 31, 2027
Modify select interchange ramps and pedestrian accommodations to increase safety and operations while utilizing the existing bridge No. 1327. Work includes paving, grading, drainage, lighting, roadside traffic hardware, retaining wall(s), bridge maintenance, guardrail, curb ramps, shared-use pathways, curb and gutter, signage, and striping.
More - FAST ADA Improvements: Shared-Use Path Resurfacing: Steese Hwy, Chena Ridge Spur Rd, and Phillips Field RdAlaska DOT&PFAlaska DOT&PFPosted —Due Jan 31, 2027
Widen and resurface existing shared-use paths along Steese Highway, Chena Ridge Spur Road and Philips Field Road Extension in Fairbanks. Project will include ADA improvements, roadside hardware, and utilities.
More - AMATS: Northern Lights Boulevard Sidewalk Repairs Phase IAlaska DOT&PFAlaska DOT&PFPosted —Due Nov 30, 2026
This federally funded project will construct pedestrian facility upgrades and ADA improvements along the south side of Northern Lights Boulevard between Minnesota Drive and the Seward Highway in Anchorage, Alaska.
More - CENTRAL REGION ADA COMPLIANCE PROJECTAlaska DOT&PFAlaska DOT&PFPosted —Due Jan 15, 2027
Reconstruction of non-compliant ADA improvements along State-owned routes in DOT&PF's Central Region to implement DOT&PF's ADA Transition Plan and to ensure compliance with the ADA. Project elements may include curb ramps, sidewalks, roadside hardware, drainage improvements, and utilities.
More - FAST ADA Improvements - Fairbanks: 6th and 7th AvenuesAlaska DOT&PFAlaska DOT&PFPosted —Due Dec 31, 2026
Reconstruct pedestrian facilities and adjacent areas on 6th Avenue and 7th Avenue in Fairbanks. Project includes drainage improvements, roadside hardware, and utilities.
More - cordova second street reconstructionAlaska DOT&PFAlaska DOT&PFPosted —Due Feb 28, 2027
reconstruct second street in cordova. project will include ada improvements, drainage improvements, roadside hardware, and utilities.
More - 26-34-214903 ARRC Seward Port Avenue Pedestrian Underpass Grading PavingAlaska (state)Posted Aug 31, 2026
Addendum 1 issued 9/8/2026The Alaska Railroad, Corp. (ARRC) is requesting Construction services for the Seward Port Avenue Pedestrian Underpass Project. The alignment has been cleared and partially gr...
More - FAST ADA Improvements: Shared-Use Path Improvements: Parks HighwayAlaska DOT&PFAlaska DOT&PFPosted —Due Dec 31, 2026
Widen and resurface existing shared use path on Parks Highway between Faith Lane and Ester. Re-establish striping that separates the path from the highway. Project will include ADA improvements, drainage improvements, roadside hardware, and utilities.
More - FAIRVIEW LOOP ROAD REHABILITATION AND PATHWAY - STAGE IAlaska DOT&PFAlaska DOT&PFPosted —Due Nov 20, 2026
Construct safety improvements on Fairview Loop between Sue Lane and South Valley Loop and Alder Lane and South Bearing Tree Lane. Work includes reconstruction, widening, drainage improvements, utilities, and roadside hardware.
More - FAST ADA Improvements: Shared-Use Path Improvements: Hurst RdAlaska DOT&PFAlaska DOT&PFPosted —Due Dec 31, 2026
Widen and resurface existing shared use path along Hurst Road in North Pole, Alaska. Project will include ADA improvements, drainage improvements, roadside hardware, and utilities.
More - PARKS HIGHWAY MP 99-163 DRAINAGE IMPROVEMENTS - PHASE 4Alaska DOT&PFAlaska DOT&PFPosted —Due Nov 30, 2027
Construct drainage improvements including, culvert replacement, large drainage structures and/or bridges, ditching, excavation, guardrail, signage, utility relocations, clearing and grubbing. This is the fourth child project of the parent CFHWY00592 project.
More - SIT HARBOR DRIVE MIDBLOCK CROSSWALK HSIPAlaska DOT&PFAlaska DOT&PFPosted —Due Jul 30, 2027
Construct a mid block pedestrian crossing across Harbor Drive, implementing sidewalk extensions,luminaires and signage.
More - Fairview Loop Pathway and Safety Improvements (GF/GO)Alaska DOT&PFAlaska DOT&PFPosted —Due Nov 20, 2026
This project will construct a separated pathway along Fairview Loop Road from Top of the World Circle to Edlund Road. Construction of the pathway may be extended further east depending on the available funding. Safety improvements at selected intersections and drainage improvements not included the Fairview Loop Pavement Preservation project will also be included in the project. The 2025 construction work package will consist of replacing the Cottonwood Creek and Cottonwood Slough culverts on…
More - HSIP: OLD SEWARD HWY, INDUSTRIAL WAY/120TH AVE CHANNELIZATIOAlaska DOT&PFAlaska DOT&PFPosted —Due Apr 1, 2027
Install raised median on Old Seward Highway with directional left-in only median openings at Industry Way and 120th Avenue.
More - Parks Highway MP 99-163 Drainage Improvements - Phase 3Alaska DOT&PFAlaska DOT&PFPosted —Due Aug 31, 2027
This project will construct drainage improvements including, culvert replacement, large drainage structures and/or bridges, paving, grading, roadside hardware, utility relocations, clearing and grubbing.
More
Other categories in Alaska
- Road construction · 38
- Traffic signal maintenance · 9
- Fuel supply · 8
- Parking lot maintenance · 7
- Snow plows · 7
- Roofing services · 7
- Bridge construction · 6
- Marine vessels · 6
- Snow removal · 6
- Fleet vehicles · 6
- Transportation planning · 5
- Firearms and ammunition · 5
- Accounting and audit services · 4
- Generator services · 4
- Land surveying · 4
- Survey research · 3
Sidewalk repair contracts in other states
Frequently asked
21 open sidewalk repair solicitations are posted for work in Alaska right now — 0 federal and 21 state and local. Matches are refreshed several times a day.
Each open Alaska solicitation is compared with every GovBidAlerts category by meaning, not keywords, and listed under the one it fits best — so a bid titled differently from "sidewalk repair" still lands here when that is what it buys.