GovBidAlerts

Road Construction contracts, bids & RFPs in Alaska

Road and highway construction, resurfacing, and repair including asphalt and concrete paving, milling, overlay, pavement rehabilitation, striping, grading, and roadway and street reconstruction and maintenance.

38 open road construction solicitations in Alaska · updated Nov 18

Match your business

Paste your website — we'll show the open government contracts that fit your business.

Free · no signup · we read your homepage once. We don't store your email.

Get new Alaska road construction bids by email

Create a free account and we’ll save this search for you, then email you when new Alaska road construction solicitations post. No credit card required.

Email me new Alaska road construction bids

Road construction activity in Alaska

A current snapshot based on 30 of 38 open listings shown on this page. Counts update with the directory.

Listings posted over the last 8 weeks
Listings shown by source
  • Alaska DOT&PF27
  • Federal (SAM.gov)3

Deadline outlook

Next 30 days
4
Later
24
Open / rolling
2

Most represented buyers

  1. Alaska DOT&PF27
  2. TRANSPORTATION, DEPARTMENT OF2
  3. AGRICULTURE, DEPARTMENT OF1

1 of the listings shown were posted in the last 30 days. Alaska DOT&PF contributes the largest share (27). Alaska DOT&PF is the most represented buyer in this snapshot.

Open road construction solicitations in Alaska

  • Cripple Creek Veg Management Roads Reconstruction
    AGRICULTURE, DEPARTMENT OFAnchorage, AKPosted Nov 10, 2026Due Dec 5, 2026

    Cripple Creek Veg Management Roads Reconstruction CHUGACH NF This project includes subgrade construction, unsuitable material excavation and endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing and grubbing,disposal site contouring, switchback realignment, waterbar construction and reconstruction,and all other work required to get these roads to a condition to place aggregate surface materials. Option item is road surfacing. Questions Due:11/20 Proposals due:…

    More
  • AK NPS DENA 10(64), Re-pave Riley Creek Campground Roads
    TRANSPORTATION, DEPARTMENT OFFairbanks, AKPosted Sep 17, 2026

    Project: AK NPS DENA 10(64), Re-pave Riley Creek CG Roads This work consists of: Aggregate base, paving, striping and pavement repairs of the Riley Creek Campground in Denali National Park and Pavement repairs along the park Road. Project Location: This project is located approximately 125 Miles SW of Fairbanks, AK. Project Length: 2.02 Miles Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: Fall 2026/ Winter 2027 Tentative Fixed Completion Date: Fall 2027…

    More
  • KTN SAXMAN TO SURF ST PAVEMENT REHABILITATION - SOUTH TONGAS
    Alaska DOT&PFAlaska DOT&PFPosted —Due Dec 30, 2026

    Reconstruction of South Tongass highway from Saxman to Surf Street. Project includes complete roadway reconstruction, improvement of horizontal and vertical alignment, widening, guardrail, drainage improvements and paving. Project also includes construction of a pedestrian path on water side of roadway.

    More
  • OLD SEWARD AND HUFFMAN, OMALLEY TO RABBIT CR RD TO BIRCH, P
    Alaska DOT&PFAlaska DOT&PFPosted —Due Apr 1, 2027

    Pavement Preservation. Work may include grading, paving, minor structural improvements, improvements to roadside hardware, drainage, intersection, automated traffic recorders, bike and/or pedestrian facilities, bridge work, striping, and/or utilities. This project is likely to be phased, with the tentative advertise date reflecting Phase One.

    More
  • AK NPS DENA 10(64), Re-pave Riley Creek Campground Roads
    TRANSPORTATION, DEPARTMENT OFFairbanks, AKPosted Sep 28, 2026

    Project: AK NPS DENA 10(64), Re-pave Riley Creek CG Roads This work consists of: Aggregate base, paving, striping and pavement repairs of the Riley Creek Campground in Denali National Park and Pavement repairs along the park Road. Project Location: This project is located approximately 125 Miles SW of Fairbanks, AK. Project Length: 2.02 Miles Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: Fall 2026/ Winter 2027 Tentative Fixed Completion Date: Fall 2027…

    More
  • STERLING HWY: MP 169 TO 175 PAVEMENT PRESERVATION
    Alaska DOT&PFAlaska DOT&PFPosted —Due Jan 15, 2027

    This is a pavement preservation project for Sterling Highway from Homer Hill to Kachemak Bay Drive. This project includes resurfacing, roadside hardware, drainage improvements, ADA improvements, and utilities as necessary.

    More
  • KDK: OTMELOI WAY REHABILITATION
    Alaska DOT&PFAlaska DOT&PFPosted —Due Aug 31, 2027

    The proposed project would reconstruct and pave Otmeloi Way along the existing unpaved road from its intersection with Monashka Bay Road to its intersection with Rezanoff Drive. The proposed project would also include drainage, ditching, guardrail and other improvements. The proposed project would also reconstruct and pave approximately 530 feet of Mallard Way if funding allows.

    More
  • ANCHORAGE AREA PAVEMENT PRESERVATION GROUP A
    Alaska DOT&PFAlaska DOT&PFPosted —Due Oct 1, 2027

    Pavement preservation on multiple routes. Work may include improvements to roadside hardware, drainage, intersections, automated traffic recorders, pedestrian facilities, bridge work, striping, and utilities. This project will be phased, and a trenchless, lining project will precede the pavement preservation project. The Tentative Advertise Date and Engineer's Estimate Range reflect the lining project.

    More
  • OLD GLENN HWY OUTER SPRINGER LP & INNER SPRINGER LP PAVEMENT
    Alaska DOT&PFAlaska DOT&PFPosted —Due Nov 1, 2027

    This pavement preservation project will resurface Old Glenn Hwy, Outer Springer Loop and Inner Springer Loop. Additional improvements may also include: utility relocation, roadsidehardward, vegetation clearing, dig-outs, drainage, signs, striping, bridge repairs, ADA improvements, and safety improvements.

    More
  • Sterling Highway MP 43-56 Pavement Preservation
    Alaska DOT&PFAlaska DOT&PFPosted —Due Nov 30, 2026

    This federally funded project will resurface the Sterling Highway between Mileposts 43 and 56, excluding between Mileposts 44.5 and 47.5. Work includes roadside hardware, drainage, bridge work, signage, and striping.

    More
  • Seward Hwy MP 90-99 Pavement Preservation Phase 2 and Camp Road Culvert Repair
    Alaska DOT&PFAlaska DOT&PFPosted —Due Jan 15, 2027

    Pavement preservation, which may include improvements to roadside hardware, drainage, intersections, automated traffic recorders, pedestrian facilities, bridge work, striping, and utilities.

    More
  • Richardson Highway MP 214-218 Reconstruction
    Alaska DOT&PFAlaska DOT&PFPosted —Due Apr 30, 2027

    Reconstruct the Richardson Highway between MP 214 - 218 and replace the Upper Miller Creek Bridge #581, Lower Miller Creek Bridge #582, and the Castner Creek Bridge #583. Project also includes drainage improvements, roadside hardware, and utilities.

    More
  • Parks Highway MP 355 Resurfacing
    Alaska DOT&PFAlaska DOT&PFPosted —Due Nov 30, 2026

    Resurface the Parks Highway at MP 355. Project will include drainage improvements, roadside hardware, and utilities. This project will be combined for advertising with NFHWY00898 Parks Hwy/Sheep Creek Road Extension Traffic Signal (HSIP).

    More
  • Murphy Dome Road MP 0-2 Rehabilitation (HSIP)
    Alaska DOT&PFAlaska DOT&PFPosted —Due Feb 28, 2027

    Widen the shoulders of Murphy Dome Road between the Sheep Creek Road and Spinach Creek Road intersections. Work includes roadside hardware, drainage improvements and utilities.

    More
  • KENAI SPUR HIGHWAY MP 29-38 PAVEMENT PRESERVATION
    Alaska DOT&PFAlaska DOT&PFPosted —Due Nov 30, 2026

    This project will resurface the Kenai Spur Highway between mileposts 29 and 38. Improvements to roadside hardware, safety, drainage, signs, and minor structural section improvements may also be included.

    More
  • Hollywood Rd. : Vine Rd. to Big Lake Rd. Pavement Preservation
    Alaska DOT&PFAlaska DOT&PFPosted —Due Feb 28, 2027

    Pavement preservation, roadside hardware, structural improvement in limited areas, minor drainage and/or safety improvements, utility adjustment/relocation, signing and striping.

    More
  • Glenn Highway Milepost 66.5-92 Pavement Preservation, Stage 2 Milepost 75-83
    Alaska DOT&PFAlaska DOT&PFPosted —Due Mar 1, 2027

    Resurface the Glenn Highway from Kings River bridge to Cascade. Additional improvements may include bridge work, roadside hardware, drainage improvements, intersection improvements, ADA improvements, and utilities as necessary.

    More
  • Healy Community Roads Resurfacing
    Alaska DOT&PFAlaska DOT&PFPosted —Due May 31, 2027

    Resurface the following community roads in Healy: Coal Street, Healy School Road, Hilltop Road, Lignite Road, Ranch Avenue, and Suntrana Avenue. Project includes drainage and intersection improvements. Healy Area & School Pedestrian Path (NFHWY00923), Healy to Antler Ridge Separated Path (NFHWY00981), and Healy Community Roads Resurfacing (NFHWY01172) will be combined for advertising as a single contract.

    More
  • AMATS: SPENARD RD REHAB - MINNESOTA DR TO BENSON BLVD
    Alaska DOT&PFAlaska DOT&PFPosted —Due Nov 1, 2027

    This project will rehabilitate Spenard Road generally from Minnesota Drive to Benson Boulevard. This project includes drainage, intersection, and ADA Improvements, as we as utilities, and roadside hardware.

    More
  • AMATS: OLD SEWARD HWY SPUR - OSH TO POTTER VALLEY ROAD
    Alaska DOT&PFAlaska DOT&PFPosted —Due Mar 1, 2027

    This project will repave Old Seward Highway Spur from Old Seward Highway to Potter Valley Road. Work may include pavement replacement, reconstruction/dig-out sections, roadside hardware, drainage improvements, and utilities.

    More
  • ANC Old International Airport Road Repairs 2027
    Alaska DOT&PFAlaska DOT&PFPosted —Due Mar 24, 2027

    Rehabilitate Old International Airport Road (OIAR) from the intersection with Jewel Lake Road to W 50th Avenue. Work includes pavement planning, striping, utility adjustments, and drainage improvements.

    More
  • SGY KLONDIKE HWY REHAB: SGY RIVER BRIDGE TO CANADIAN BORDER
    Alaska DOT&PFAlaska DOT&PFPosted —Due Aug 31, 2027

    This project will provide for the rehabilitation of the Klondike Highway. Focus will be on rehabilitating the pavement, critical safety improvements, drainage, and related improvements as necessary.

    More
  • HSIP: SEWARD HIGHWAY ROCKFALL MITIGATION, MP 113.2
    Alaska DOT&PFAlaska DOT&PFPosted —Due Sep 30, 2027

    Excavation/scaling/blasting of the rock slope, ditching, rock catchment, rock/overburden stabilization measures, and icefall mitigation measures. The project will also include drainage improvements, paving, signing, striping, and roadside hardware.

    More
  • AMATS: ACADEMY DRIVE/VANGUARD DRIVE AREA IMPROVEMENTS
    Alaska DOT&PFAlaska DOT&PFPosted —Due Jun 1, 2027

    This AMATS reconstruction project will improve Academy Drive and Vanguard Drive. This reconstruction may include drainage improvements, right-of-way acquisitions, utilities, ADA improvements, roadside hardware, intersection improvements and realignments.

    More
  • KDK CHINIAK HIGHWAY REHABILITATION: MILE POST 15 TO 31
    Alaska DOT&PFAlaska DOT&PFPosted —Due Feb 28, 2027

    Rehabilitate the Chiniak Highway from Milepost 15 to just past 31 to improve and preserve the roadway subgrade and surface. Address lighting, guardrails, drainage, culverts and other highway appurtenances as needed.

    More
  • Dalton Highway Milepost 175-188 Resurfacing
    Alaska DOT&PFAlaska DOT&PFPosted —Due May 31, 2027

    REVISED: Resurface the Dalton Highway from Milepost 175 to 188.5. Work includes grading, paving, roadside hardware, drainage improvements, and bridge work.

    More
  • GLENN HIGHWAY MP 158-172 REHABILITATION
    Alaska DOT&PFAlaska DOT&PFPosted —Due Nov 15, 2027

    Rehabilitate the Glenn Highway between Mileposts 158 and 172. Project work includes drainage improvements, intersection improvements, roadside hardware, and utilities.

    More
  • HNS ROADWAY & CULVERTS 189485 - DEC 20 SE PR
    Alaska DOT&PFAlaska DOT&PFPosted —Due Mar 30, 2027

    This project will design and construct permanent repairs (PR) to assets damaged by the December 2020 Storm in the Southcoast Region of Alaska for Damage Inventory Numbers 461220 - 461221, 461229, 461231 - 461236, 461253, 461255 - 461257, 461652, 784622, and 918887 - 918890. Repairs may include, but are not limited to, asphalt, embankment, geotextile, riprap, drainage, roadside hardware, retaining walls, and utilities. This project will repair sites on Beach Road, Front Street, Allen-Menaker…

    More
  • TOK CUTOFF HIGHWAY MP 0-8 RESURFACING
    Alaska DOT&PFAlaska DOT&PFPosted —Due Apr 30, 2027

    Resurface the Tok Cutoff Highway between MP 0-8. Project includes bridge work (#646), drainage improvements, roadside hardware, and utilities.

    More
  • VALDEZ MINERAL CREEK LOOP ROAD RESURFACING
    Alaska DOT&PFAlaska DOT&PFPosted —Due Apr 30, 2027

    Resurface Mineral Creek Loop Road. Project will include drainage improvements and roadside hardware.

    More

Road construction contracts nationwide · All open Alaska bids

Other categories in Alaska

Road construction contracts in other states

Frequently asked

How many road construction contracts are open in Alaska?

38 open road construction solicitations are posted for work in Alaska right now — 4 federal and 34 state and local. Matches are refreshed several times a day.

How are bids matched to road construction?

Each open Alaska solicitation is compared with every GovBidAlerts category by meaning, not keywords, and listed under the one it fits best — so a bid titled differently from "road construction" still lands here when that is what it buys.