Sidewalk Repair contracts, bids & RFPs in Missouri
Sidewalk construction, repair, and replacement including concrete flatwork, curb ramps, ADA accessibility upgrades, trip-hazard grinding, curb and gutter, and pedestrian walkway installation along streets and public rights-of-way.
8 open sidewalk repair solicitations in Missouri · updated Nov 19
Paste your website — we'll show the open government contracts that fit your business.
Free · no signup · we read your homepage once. We don't store your email.
Get new Missouri sidewalk repair bids by email
Create a free account and we’ll save this search for you, then email you when new Missouri sidewalk repair solicitations post. No credit card required.
Email me new Missouri sidewalk repair bidsSidewalk repair activity in Missouri
A current snapshot based on 8 listings shown on this page. Counts update with the directory.
- BidNet (local govts)5
- Missouri DOT2
- City of St. Louis (Public Service), MO1
Deadline outlook
- Next 30 days
- 8
- Later
- 0
- Open / rolling
- 0
Most represented buyers
- Missouri DOT2
- City of St. Louis (Public Service), MO1
3 of the listings shown were posted in the last 30 days. BidNet (local govts) contributes the largest share (5). Missouri DOT is the most represented buyer in this snapshot.
Open sidewalk repair solicitations in Missouri
- 8801City of St. Louis (Public Service), MOCity of St. Louis (Public Service), MOPosted —Due Dec 8, 2026
Concrete & Brick Removal/Replacement and Complete Sidewalk Installation; SP-125
More - Concrete & Brick Removal/Replacement and Complete Sidewalk InstallationMissouriPosted Nov 6, 2026Due Dec 8, 2026
- Sidewalk Replacement-Various LocationsMissouriPosted Nov 17, 2026Due Dec 15, 2026
- (1): Job JSL0065 Route H ST LOUIS CITY County. Coldmill, resurface and ADA improvements from St. Louis County Line to Halls Street, the total length of improvement being 3.879 miles.MissouriPosted Nov 17, 2026Due Dec 18, 2026
- Job J3P3202 Route BU 50, J JOHNSON County. Coldmill, resurface, drainage and ADA improvements in Knob Noster on BU 50 from Washington Avenue to Sunshine Lane and Route J from SE 25 Road to end of stateMissouriPosted Oct 12, 2026Due Nov 20, 2026
- (1): Job JKU0299 Route 2 CASS County. Culvert replacement and ADA improvements over Muddy Creek in Harrisonville, the total length of improvement being 0.13 miles.Missouri DOTMissouri DOTPosted —Due Nov 21, 2026
- (1): Job JSL0065 Route H ST LOUIS CITY County. Coldmill, resurface and ADA improvements from St. Louis County Line to Halls Street, the total length of improvement being 3.879 miles.Missouri DOTMissouri DOTPosted —Due Dec 19, 2026
- Roadway and Sidewalk Improvement ProjectMissouriPosted Oct 12, 2026Due Nov 19, 2026
Sidewalk repair contracts nationwide · All open Missouri bids
Other categories in Missouri
- Bridge construction · 30
- Road construction · 24
- Fleet vehicles · 11
- Pest control · 9
- Laboratory services · 9
- Landscaping services · 8
- Water treatment plants · 8
- Wastewater treatment · 7
- Workforce development · 7
- Generator services · 7
- Roofing services · 7
- Solar energy installation · 7
- Janitorial services · 6
- SaaS platforms · 6
- Waste management · 6
- Behavioral health services · 5
Sidewalk repair contracts in other states
Frequently asked
8 open sidewalk repair solicitations are posted for work in Missouri right now — 0 federal and 8 state and local. Matches are refreshed several times a day.
Each open Missouri solicitation is compared with every GovBidAlerts category by meaning, not keywords, and listed under the one it fits best — so a bid titled differently from "sidewalk repair" still lands here when that is what it buys.