GovBidAlerts
← My Opportunities
open🌐 City of Thousand Oaks2025/2026-34

MI 2646 HCTP CCC Roof Caulking and FEB Joint Caulking

City of Thousand Oaks / Public Works

Description

The project is at the Hill Canyon Treatment Plant, 9600 Santa Rosa Road, Camarillo, CA 93012. The general items of work consists of removing all existing caulking in the concrete joints of the flow equalization basin (FEB) nd the existing expansion joint material in the roof joints of the concrete contact channel (if loose and faiiling), preparation of the existing substrate in accordance with the caulkign manufacturer's instructions or as required by the Engineer, installation of the required backer rod and bond breaker tape, installation of the required primer and caulking sealant, legal dispoal of construction waste, and cleanup.

Details

Posted
Jul 17, 2026
Response deadline
Aug 12, 2026, 11:00 PM UTC (24d)
Status
open
Buyer
City of Thousand Oaks
Department
Public Works
Jurisdiction
City of Thousand Oaks
Reference #
2025/2026-34
Summary
The project is at the Hill Canyon Treatment Plant, 9600 Santa Rosa Road, Camarillo, CA 93012. The general items of work consists of removing all existing caulking in the concrete joints of the flow
Government Code
toaks
Government Organization City
Thousand Oaks
Government Organization State
CA
Government Organization Zip Code
91362
Government Organization Address1
2100 Thousand Oaks Blvd
Government Organization Country Code
US
Other
Is Paused: false · Template Title: Public Solicitation for Bids · Copy Count: 0 · Government Organization Logo: https://assets.procurement.opengov.com/logo-uploads/352f546a-849f-4847-a87c-795949695fc2_500x500_CTO · Government Organization Timezone: America/Los_Angeles · Government Organization Phone Country: 1

Contact

(805)449-2239
Finding similar opportunities…

This listing is a summary from City of Thousand Oaks's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.