GovBidAlerts
← My Opportunities
open🌐 RFPMart: Construction Architecture Interior Design Landscaping Other Related ...http://www.rfpmart.com/1139300-us-fed-construction-of-fire-station-and-air-passenger-terminal-apt-demolish-building-1721-at-hanscom-afb-hafb-ma.html

US-FED-00000384916 - Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA. - Deadline July 23,2026

Description

PREQUALIFICATION ANNOUNCEMENTThis is a PREQUALIFICATION OF SOURCES announcement, issued in accordance with DFARS [ phno? redacted ]FARS CD 2026–O0019) – Prequalification of Sources, and the U.S. Army Corps of Engineers Acquisition Instruction (UAI) 5136.272. No reimbursement will be made for any costs associated with providing information in response to this announcement.The U.S. Army Corps of Engineers (USACE), New England District is seeking to prequalify sources for Solicitation W912WJ26BA011, Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA. Only those sources that submit a prequalification package and are found qualified will be eligible to compete in the resulting Invitation for Bid (IFB).The project solicitation is planned to be issued on or around the end of July 2026. This procurement will be an unrestricted procurement. All eligible firms, regardless of size standard, are eligible to submit for prequalification. The estimated magnitude of this project is between $25M to $50M.BACKGROUNDThis acquisition is to build a new fire station at HAFB, a new APT, and demolish Building 1721. The current fire station is in Building 1721, which also includes HAFB`s APT. A new APT will be constructed near its current location. The new fire station will be built on HAFB at the site of an abandoned gas station, Building 1639. Building 1639 is currently being demolished under a separate contract. The new fire station will be a single story, 25,532 square foot (SF), fully functional facility. The program includes apparatus bays for six vehicles, living quarters, and administration spaces. Proposed construction will consist of a concrete foundation, reinforced floor slabs, steel framing and masonry walls, HVAC, central fire alarm, Emergency Communications Center with Fire and Security Forces Dispatch, paving, and landscaping. The APT will be constructed north of existing Building 1721 and will be a single story 5,156 SF facility. The APT will include the safety offices, Distinguished Visitors lounge, pavement for building access and turnaround, as well as sidewalks. The existing flightline perimeter fence will be re–routed to the new APT building location. Building 1721, to be demolished, is an existing multi–story, 21,270 SF, facility that houses the existing fire station, safety offices, air passenger terminal, and Distinguished Visitor lounge. Building 1721 must remain operational until the two new buildings have been completed and the tenants have moved into their new respective buildings.QUALIFICATION REQUIREMENTS:Submit an example of one prior construction project. All of the following must be true:Project consisted of one building (not multiple buildings within a single project);Project was new vertical construction (not renovation);Minimum total construction cost of $30M;Minimum interior area of 18,000 square feet;Project reached 100% completion within the last ten years.A project is defined as work performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the IDIQ contract should not be submitted as a project; rather, potential bidders should submit the work performed under a task order as a project.The entity that bids on W912WJ26BA011 must either:Be the exact same entity as the prime general contractor for the prequalification project; orInclude in its prequalification submission a Letter of Commitment from the prime general contractor for the prequalification project. The letter shall include a commitment to be meaningfully involved during contract performance. The subcontractor/partner must be utilized during performance of the contract and cannot be replaced without approval from the Contracting Officer. Replacement without Contracting Officer approval will be grounds for contract termination.DOCUMENTATION REQUIREMENTSEach potential bidder shall send USACE the followingCAGE Code and evidence of active registration in SAM.

Details

Posted
Jul 3, 2026
Response deadline
Jul 23, 2026, 11:59 PM UTC (13d)
Status
open
Jurisdiction
RFPMart: Construction Architecture Interior Design Landscaping Other Related ...
Item
US-FED-00000384916 - Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA. - Deadline July 23,2026 PREQUAL
Finding similar opportunities…

This listing is a summary from RFPMart: Construction Architecture Interior Design Landscaping Other Related ...'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.