GovBidAlerts
← My Opportunities
closed🌐 flyontario2026-RFP-080

Construction Management At Risk (CMAR) Terminal Restroom Modernization and Other Improvements Project

flyontario / Capital Development

Description

The Authority seeks qualified firms (Proposers) to provide on-call design collaboration, design assist, preconstruction, and construction services as a Construction Manager at Risk (CMAR) for the Terminal Restroom Modernization and Other Improvement Projects (“Program”) at the Ontario International Airport (ONT). The Program includes both federally funded/eligible projects and non-federally funded/ineligible projects as specified in the Table 1‑1. Table 1‑1 – Program Funding Project Name Funding Terminal Restroom Modernization Project Federally Funded /Eligible Terminal Hold-Room Enhancement Project Non-Federal / Ineligible Other Projects Non-Federal /Ineligible The “Program” includes the following projects: Restroom Modernization Project Replace and upgrade aging facilities and equipment in the central public airside restrooms in Terminals 2 and 4 at ONT. Existing disabled access (ADA) stalls will be widened to comply with current ADA standards. Existing lighting, toilets, fixtures, and equipment will be removed and replaced with new energy-efficient LED lighting, water-efficient flush toilets, fixtures, and other equipment. The improvements will not change the existing number of stalls and fixtures in the restrooms. Prior to construction, temporary restrooms are to be constructed with approximately the same number of fixtures to ensure that the passenger level of service is maintained during construction. Hold-room Enhancements Project Modernize hold rooms in Terminals 2 and 4 at ONT. The existing seating will be removed and replaced with new seating, new gate podiums, modernized gate electrical and data infrastructure, new carpet, and new overhead lighting. The hold room seating and podium arrangements will be reorganized to improve passenger flow and line of sight to gates. New seats will be equipped with power outlets to improve passenger experience and level of service. Seating power will be plugged into new floor outlet infrastructure. Other Projects OIAA has identified the potential to add other future adjacent and/or similar improvement projects on an on-call basis. To assist Proposers in their submittal of this RFP, see below for a representative sample of the types of potential future projects. This list is not to be considered all inclusive. OIAA is not guaranteeing that any of the potential future projects will be approved. I. Other Improvement Projects a. Paging Systems Replacement b. Common Use Terminal Equipment (CUTE)/Common Use Passenger Process (CUPP) c. Concession & Office Space Build Out d. Other Terminal Improvement Projects Work on the Program will be executed within an active airport and terminal environment and is intended to support the Authority’s ongoing terminal improvement and passenger experience initiatives.

Details

Posted
Apr 17, 2026
Response deadline
May 20, 2026, 9:00 PM UTC
Status
closed
Buyer
flyontario
Department
Capital Development
Jurisdiction
flyontario
Reference #
2026-RFP-080
Summary
<p style="margin: 0in 0in 6pt; font-size: 11pt; color: black;">The Authority seeks qualified firms (Proposers) to provide on-call design collaboration, design assist, preconstruction, and construction
Is Paused
false
Template Title
Request for Proposals
Copy Count
0
Government Organization City
Ontario
Government Organization Name
Ontario International Airport
Government Organization State
CA
Government Organization Website
https://www.flyontario.com/business-employees
Government Organization Zip Code
91761
Government Organization Address1
1923 East Avion Street
Government Organization Timezone
America/Los_Angeles
Government Organization Country Code
US
Government Organization Phone Country
1

Contact

(909)544-5300
Finding similar opportunities…

This listing is a summary from flyontario's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 254926,
  "_slug": "flyontario",
  "title": "Construction Management At Risk (CMAR) Terminal Restroom Modernization and Other Improvements Project",
  "status": "evaluation",
  "summary": "<p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\">The Authority seeks qualified firms (Proposers) to provide on-call design collaboration, design assist, preconstruction, and construction services as a Construction Manager at Risk (CMAR) for the Terminal Restroom Modernization and Other Improvement Projects (&ldquo;Program&rdquo;) at the Ontario International Airport (ONT).</p><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\">The Program includes both federally funded/eligible projects and non-federally funded/ineligible projects as specified in the Table 1‑1.</p><p style=\"break-after: avoid; margin: 0in 0in 6pt; text-align: center; font-size: 11pt; color: black; font-style: italic;\">Table 1‑1 &ndash; Program Funding</p><div align=\"center\"><table class=\"MsoTableGrid\" style=\"border-collapse: collapse; border: none;\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\"><tbody><tr style=\"height: 15.0pt;\"><td style=\"width: 220.25pt; border: solid windowtext 1.0pt; background: #2F5496; padding: 0in 5.4pt 0in 5.4pt;\" valign=\"top\"><p style=\"text-align: center; margin: 0in 0in 6pt; font-size: 11pt; color: white; font-weight: bold;\">Project Name</p></td><td style=\"width: 2.25in; border: solid windowtext 1.0pt; border-left: none; background: #2F5496; padding: 0in 5.4pt 0in 5.4pt;\" valign=\"top\"><p style=\"text-align: center; margin: 0in 0in 6pt; font-size: 11pt; color: white; font-weight: bold;\">Funding</p></td></tr><tr style=\"height: 15.0pt;\"><td style=\"width: 220.25pt; border: solid windowtext 1.0pt; border-top: none; padding: 0in 5.4pt 0in 5.4pt;\"><p style=\"margin: 6pt 0in; font-size: 11pt; color: black;\">Terminal Restroom Modernization Project</p></td><td style=\"width: 2.25in; border-top: none; border-left: none; border-bottom: solid windowtext 1.0pt; border-right: solid windowtext 1.0pt; padding: 0in 5.4pt 0in 5.4pt;\"><p style=\"margin: 6pt 0in; font-size: 11pt; color: black;\">Federally Funded /Eligible</p></td></tr><tr style=\"height: 15.0pt;\"><td style=\"width: 220.25pt; border: solid windowtext 1.0pt; border-top: none; padding: 0in 5.4pt 0in 5.4pt;\"><p style=\"margin: 6pt 0in; font-size: 11pt; color: black;\">Terminal Hold-Room Enhancement Project</p></td><td style=\"width: 2.25in; border-top: none; border-left: none; border-bottom: solid windowtext 1.0pt; border-right: solid windowtext 1.0pt; padding: 0in 5.4pt 0in 5.4pt;\"><p style=\"margin: 6pt 0in; font-size: 11pt; color: black;\">Non-Federal / Ineligible</p></td></tr><tr style=\"height: 15.0pt;\"><td style=\"width: 220.25pt; border: solid windowtext 1.0pt; border-top: none; padding: 0in 5.4pt 0in 5.4pt;\"><p style=\"margin: 6pt 0in; font-size: 11pt; color: black;\">Other Projects</p></td><td style=\"width: 2.25in; border-top: none; border-left: none; border-bottom: solid windowtext 1.0pt; border-right: solid windowtext 1.0pt; padding: 0in 5.4pt 0in 5.4pt;\"><p style=\"margin: 6pt 0in; font-size: 11pt; color: black;\">Non-Federal /Ineligible</p></td></tr></tbody></table></div><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\">&nbsp;</p><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\">The &ldquo;Program&rdquo; includes the following projects:</p><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\"><strong>Restroom Modernization Project</strong></p><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\">Replace and upgrade aging facilities and equipment in the central public airside restrooms in Terminals 2 and 4 at ONT. Existing disabled access (ADA) stalls will be widened to comply with current ADA standards. Existing lighting, toilets, fixtures, and equipment will be removed and replaced with new energy-efficient LED lighting, water-efficient flush toilets, fixtures, and other equipment. The improvements will not change the existing number of stalls and fixtures in the restrooms. Prior to construction, temporary restrooms are to be constructed with approximately the same number of fixtures to ensure that the passenger level of service is maintained during construction.<strong>&nbsp;</strong></p><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\"><strong> </strong></p><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\"><strong>Hold-room Enhancements Project</strong></p><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\">Modernize hold rooms in Terminals 2 and 4 at ONT. The existing seating will be removed and replaced with new seating, new gate podiums, modernized gate electrical and data infrastructure, new carpet, and new overhead lighting. The hold room seating and podium arrangements will be reorganized to improve passenger flow and line of sight to gates. New seats will be equipped with power outlets to improve passenger experience and level of service.&nbsp; Seating power will be plugged into new floor outlet infrastructure.</p><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\"><strong>&nbsp;</strong></p><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\"><strong>Other Projects </strong></p><p style=\"margin: 0in 0in 6pt; font-size: 11pt; color: black;\">OIAA has identified the potential to add other future adjacent and/or similar improvement projects on an on-call basis. To assist Proposers in their submittal of this RFP, see below for a representative sample of the types of potential future projects. This list is not to be considered all inclusive. OIAA is not guaranteeing that any of the potential future projects will be approved.</p><p style=\"padding-left: 40px;\">I. Other Improvement Projects</p><p style=\"padding-left: 80px;\">a. Paging Systems Replacement <br>b. Common Use Terminal Equipment (CUTE)/Common Use Passenger Process (CUPP) <br>c. Concession &amp; Office Space Build Out <br>d. Other Terminal Improvement Projects</p><p style=\"margin-right: 0in; margin-left: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt; color: black;\">Work on the Program will be executed within an<strong> </strong>active airport and terminal environment and is intended to support the Authority&rsquo;s ongoing terminal improvement and passenger experience initiatives.</span></p>",
  "isPaused": false,
  "template": {
    "title": "Request for Proposals"
  },
  "addendums": [
    {
      "id": 113379
    },
    {
      "id": 115263
    }
  ],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2026-04-09T20:11:34.292Z",
  "department": {
    "id": 4570,
    "name": "Capital Development"
  },
  "government": {
    "code": "flyontario",
    "organization": {
      "city": "Ontario",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/3f0ee6c5-7782-4c5d-a7a8-3fd06675dc68_ONT-Logo_Standard-Stacked_Regular.png",
      "name": "Ontario International Airport",
      "phone": "(909)544-5300",
      "state": "CA",
      "website": "https://www.flyontario.com/business-employees",
      "zipCode": "91761",
      "address1": "1923 East Avion Street",
      "address2": null,
      "phoneExt": null,
      "timezone": "America/Los_Angeles",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "2026-RFP-080",
  "closeOutReason": null,
  "closedSubstatus": null,
  "proposalDeadline": "2026-05-20T21:00:00.000Z",
  "releaseProjectDate": "2026-04-17T07:00:00.000Z"
}