Washington Park Stormwater Capture Project - Engineering Design Services

pasadena / Public Works Department

Description

Under the federal Clean Water Act, the National Pollutant Discharge Elimination System (NPDES) permit program regulates pollutant discharges to protect water quality. As part of this framework, Total Maximum Daily Loads (TMDLs) set the maximum allowable pollutant loads for waterbodies and allocate those loads among contributing sources, including municipal separate storm sewer systems (MS4s). The City of Pasadena’s MS4 conveys dry- and stormwater flows to receiving waters, including the East Side Storm Drain, Rubio Wash, and the Rio Hondo Channel, all of which ultimately discharge to the Los Angeles River and are subject to TMDLs for bacteria, trash, metals, sediments, and other pollutants of concern. Compliance with the Los Angeles County MS4 Permit requires the City to implement cost-effective, multi-benefit stormwater management projects that achieve pollutant load reductions and advance watershed health. The City of Pasadena is leading the Washington Park Stormwater Capture Project to continue regional progress toward pollutant load reductions for bacteria and other priority pollutants in the East Side Storm Drain, Rubio Wash, and Rio Hondo watershed. Washington Park, located at the southeast corner of Washington Boulevard and El Molino Avenue, is uniquely positioned within the Rio Hondo watershed and offers substantial potential to improve water quality due to its proximity to existing storm drain infrastructure, its watershed linkage, and available city-owned space. A Project Feasibility Study, f unded through the Los Angeles County Safe, Clean Water Program’s Technical Resources Program (TRP), has been completed and evaluated conceptual approaches for diverting stormwater from the adjacent East Side Storm Drain, filtering it through a pretreatment unit, and conveying it to an underground storage and groundwater recharge system. The preliminary concept evaluated in the study also explored opportunities for on-site bioretention/infiltration basins and gardens to enhance native vegetation and passive recreation opportunities. The Feasibility Study informs the RFP’s expectation that final design build upon the study’s findings while assessing additional alternatives that maximize water quality improvements, cost-effectiveness, and design efficiencies within site constraints. The site is on public property owned by the City of Pasadena and is located within the Rio Hondo watershed. The drainage area for the project is approximately 527 acres and is located within the City of Pasadena. The drainage area is contributed by the City of Pasadena (77.3%) and the County of Los Angeles (22.7%). The Project is located at 700 E. Washington Blvd. and is a 5.4-acre park that has single family homes to the west and south, homes and small commercial buildings to the north, and a banquet hall and multi-family apartments to the east.

Details

Posted
Jan 27, 2026
Response deadline
Feb 24, 2026, 1:00 AM UTC
Status
closed
Buyer
pasadena
Department
Public Works Department
Jurisdiction
pasadena
Reference #
2026-RFP-0053
Summary
<p>Under the federal Clean Water Act, the National Pollutant Discharge Elimination System (NPDES) permit program regulates pollutant discharges to protect water quality. As part of this framework, Tot
Is Paused
false
Template Title
Request for Proposals (Competitive Selection PMC 4.08.047)
Copy Count
0
Government Organization Name
City of Pasadena
Government Organization State
CA
Government Organization Website
https://www.cityofpasadena.net/
Government Organization Zip Code
91101
Government Organization Address1
100 N. Garfield Avenue
Government Organization Timezone
America/Los_Angeles
Government Organization Country Code
US
Government Organization Phone Country
1
Finding similar opportunities…

This listing is a summary from pasadena's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 213197,
  "_slug": "pasadena",
  "title": "Washington Park Stormwater Capture Project - Engineering Design Services",
  "status": "evaluation",
  "summary": "<p>Under the federal Clean Water Act, the National Pollutant Discharge Elimination System (NPDES) permit program regulates pollutant discharges to protect water quality. As part of this framework, Total Maximum Daily Loads (TMDLs) set the maximum allowable pollutant loads for waterbodies and allocate those loads among contributing sources, including municipal separate storm sewer systems (MS4s). The City of Pasadena&rsquo;s MS4 conveys dry- and stormwater flows to receiving waters, including the East Side Storm Drain, Rubio Wash, and the Rio Hondo Channel, all of which ultimately discharge to the Los Angeles River and are subject to TMDLs for bacteria, trash, metals, sediments, and other pollutants of concern. Compliance with the Los Angeles County MS4 Permit requires the City to implement cost-effective, multi-benefit stormwater management projects that achieve pollutant load reductions and advance watershed health.</p><p>The City of Pasadena is leading the Washington Park Stormwater Capture Project to continue regional progress toward pollutant load reductions for bacteria and other priority pollutants in the East Side Storm Drain, Rubio Wash, and Rio Hondo watershed. Washington Park, located at the southeast corner of Washington Boulevard and El Molino Avenue, is uniquely positioned within the Rio Hondo watershed and offers substantial potential to improve water quality due to its proximity to existing storm drain infrastructure, its watershed linkage, and available city-owned space. &nbsp;A<strong> Project Feasibility Study, f</strong>unded through the Los Angeles County Safe, Clean Water Program&rsquo;s Technical Resources Program (TRP), has been completed and evaluated conceptual approaches for diverting stormwater from the adjacent East Side Storm Drain, filtering it through a pretreatment unit, and conveying it to an underground storage and groundwater recharge system. The preliminary concept evaluated in the study also explored opportunities for on-site bioretention/infiltration basins and gardens to enhance native vegetation and passive recreation opportunities. The Feasibility Study informs the RFP&rsquo;s expectation that final design build upon the study&rsquo;s findings while assessing additional alternatives that maximize water quality improvements, cost-effectiveness, and design efficiencies within site constraints.</p><p>The site is on public property owned by the City of Pasadena and is located within the Rio Hondo watershed. The drainage area for the project is approximately 527 acres and is located within the City of Pasadena. The drainage area is contributed by the City of Pasadena (77.3%) and the County of Los Angeles (22.7%).</p><p>The Project is located at 700 E. Washington Blvd. and is a 5.4-acre park that has single family homes to the west and south, homes and small commercial buildings to the north, and a banquet hall and multi-family apartments to the east.</p>",
  "isPaused": false,
  "template": {
    "title": "Request for Proposals (Competitive Selection PMC 4.08.047)"
  },
  "addendums": [],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": null,
  "created_at": "2025-11-04T16:44:56.267Z",
  "department": {
    "id": 236,
    "name": "Public Works Department"
  },
  "government": {
    "code": "pasadena",
    "organization": {
      "city": "Pasadena",
      "logo": "https://assets.procurement.opengov.com/logos/Pasadena.jpeg",
      "name": "City of Pasadena",
      "phone": null,
      "state": "CA",
      "website": "https://www.cityofpasadena.net/",
      "zipCode": "91101",
      "address1": "100 N. Garfield Avenue",
      "address2": null,
      "phoneExt": null,
      "timezone": "America/Los_Angeles",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "2026-RFP-0053",
  "closeOutReason": null,
  "closedSubstatus": null,
  "proposalDeadline": "2026-02-24T01:00:11.648Z",
  "releaseProjectDate": "2026-01-27T06:07:34.816Z"
}