open🌐 RFPMart: Software System & Applicationhttp://www.rfpmart.com/1137398-us-fed-rfi---fog-tester-instrument-image-analysis-software-jun-2026.html
US-FED-00000384388 - RFI - Fog Tester Instrument Image Analysis Software JUN 2026 - Deadline July 13,2026
Description
SYNOPSIS: This Sources Sought Announcement is to assist the US Army DEVCOM Soldier Center to identify potential sources to provide Software Development for Fog Tester Instrument Image Analysis software.The Government requests that responses be submitted electronically to [email? redacted] and David.p.z[email? redacted] by July 13, 2026 by 5pm EST.Background: The Government (DEVCOM Soldier Center) is in need of Fog Tester Instrument Image Analysis Software development to integrate with the existing Fog Tester Instrument control and data acquisition software. The Soldier Center designed 4th Generation Fog Tester currently utilizes a LabVIEW program, named FogTester, running on a Microsoft Windows computer to operate a custom control board that provides 120VAC electrical outlet relay switching, temperature and humidity input and recording, light(s), dual camera video input, and heating circuit temperature control of the video cameras lenses. A separate LabVIEW application, named BarTarget, is then used post–test to analyze the acquired video stills to generate a contrast ratio value of selected regions of interest. The contrast ratio values are then manually plotted by the user in Microsoft Excel and compared to known Haze Standard values.Description:The improved BarTarget application should be designed to analyze the post–test acquired video images from both cameras and generate the contrast ratio value per selected region of interest and plot the contrast ratio over the duration time of the test and output a result per designated pass/fail criteria based upon the haze calibration measurements. Additional functions should include Haze Standard calibration image acquisition and the ability to “zero“ the contrast ratio, so each test article is acquired at the same starting point, this will require the application to interact with the FogTester application.Requirements: The Contractor shall provide services for software development of an improved Fog Tester data analysis application.a. General Requirements. The contractor`s primary focus shall be to:(1) Develop post–test image analysis sub–program for use with Soldier Center–developed Fog Tester instrument control and data acquisition software. This sub–program will replace the current BarTarget program, and the data plotting performed in Microsoft Excel by the user.(2) Deliver a sub–program which shall also be able to process calibration tests, analyze the data and deliver a calibrations file for input to the pass/fail criteria.b. Specific Requirements: The contractor shall:(1) Develop software code to operate on a Microsoft Windows 11 operating system for image analysis software application that will interact with the FogTester software application in in a local host environment (no internet connection required), have users input test condition parameters (file save location, test duration, camera configuration), perform the test, analyze the data, and compute and output the results per designated pass/fail criteria. Saved output graph and data shall be compatible with Microsoft Word and Excel programs for user reporting purposes.(2) The software shall be written/developed using any of the following programming languages: LabVIEW, .NET (C#, Visual Basic), Python. Other programming languages may be considered but require approval by the Contracting Officer Representative (COR) and/or Contracting Officer Technical Representative (COTR) before use.(3) The software shall communicate with the FogTester software via a TCP port.c. Software Assurance (SwA) Requirements2.c. Software Assurance. The software developed under this effort is categorized as Non–Critical, Untethered, Government–purpose developed software intended for installation on a standalone (disconnected) laboratory information system with no internet connectivity. The Contractor shall implement Software Assurance to the maximum extent practicable in accordance with AR 25–2, the HQDA DCS G–6 Software Assurance Implementation Planning Guidance (IPG), DA PAM 25–2–5, and DoDI 8510.01 RMF / NIST SP 800–53 Control SA–11. [Ref: SwA IPG §1.3; DA PAM 25–2–5 Ch.3; DoD SwA Contract Language §2.2] [1][2][3]2.c.(1) Secure Coding Practices. The Contractor shall enforce secure coding practices throughout the Software Development Lifecycle, including input validation of all data received from the FogTester application and TCP interface, adherence to the principle of least privilege, and elimination of compiler warnings at the highest available warning level. The Contractor shall apply these practices to all custom–developed code and any reused, open–source, or generated code. [Ref: DA PAM 25–2–5 §4–1b and §4–3a; DoD SwA Contract Language Notional SOO] [2][3]2.c.(2) Static Application Security Testing (SAST). The Contractor shall perform Static Application Security Testing (Static Code Analysis) on the complete source code (LabVIEW, .NET/C#/VB, and/or Python as applicable) using at least one automate
Details?
- Posted
- Jun 30, 2026
- Response deadline
- Jul 13, 2026, 11:59 PM UTC (3d)
- Status
- open
- Jurisdiction
- RFPMart: Software System & Application
- Item
- US-FED-00000384388 - RFI - Fog Tester Instrument Image Analysis Software JUN 2026 - Deadline July 13,2026 SYNOPSIS: This Sources Sought Announcement is to assist the
Finding similar opportunities…
This listing is a summary from RFPMart: Software System & Application's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.