VGLZ 182035 REPAIR BASE PERIMETER ROAD

Key dates

Posted
Mar 4, 2026
Response deadline
Mar 17, 2026, 4:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Sources Sought
Base type
Sources Sought
Set-aside
Set-aside code
PSC
Y1LB

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W7NF USPFO ACTIVITY MIANG 127
Office code
021.2100.NGB.JFHQ USPFO MI.USPFO MI PROC.W50S85
Organization type
OFFICE
Office address
SELFRIDGE ANGB, MI, 48045-5213, USA

Place of performance

Street
Selfridge ANGB Base Perimeter Road to include the main drive onto the base and some higher traffic areas. Road work to be done all around the base perimeter road.
Street 2
City
State
Zip
48045
Country

Contacts

Description

The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for, and follow the requirements of this permit. The work will consist of Construction of new 2 and 3 lane roads. The requirement includes full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. All work will be completed IAW drawings Repair Perimeter Rd VGLZ 182035. Installation of subsurface edge drainage for all new pavement sections. Localized grading of the project site to address current inadequate drainage. New paint and markings on all new pavements. The Contractor must maintain a constant flow of traffic during construction. Base perimeter road surfacing to be primarily of HMA Pavement. Existing base perimeter road distance to be resurfaced unofficially is 4.2 miles of primarily two and three lane road, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes. Those three lanes make up one mile of the projects 4.2 total miles. Contractor to remove and reinstall steel wedge barriers and jersey barriers throughout construction per the direction of SANGB Security Staff. Steel barriers to be reinstalled at grade to match pre-construction condition. Interested vendors should respond to this sources sought announcement through the Procurement Integrated Enterprise Environment (PIEE) solicitation module by providing a full capabilities statements, socio-economic status, applicable NAICS codes, prior experience in road construction and repair, past performance, government contract numbers for highway work, bonding status letter from financial institution, Please see Sources Sought Notice attached with this announcement. (See attachments for further needed information)

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
dad0c675c121403daf62a747673e2c76
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W7NF USPFO ACTIVITY MIANG 127
Office code
021.2100.NGB.JFHQ USPFO MI.USPFO MI PROC.W50S85
Ingested
May 2, 2026
Updated
Jul 11, 2026