SolicitationActiveW911YN-26-Q-A024
Mobile Home Demolition
DEPT OF DEFENSE / DEPT OF THE ARMY / W7M2 USPFO ACTIVITY FL ARNGKey dates?
- Posted?
- Sep 2, 2026
- Response deadline?
- Sep 11, 2026, 9:00 PM UTC
- Archive date?
- Sep 26, 2026
- Archive type?
- auto15
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- Small Business Set Aside - Total
- Set-aside code?
- SBA
- PSC?
- P400
NAICS?
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE ARMY
- Office?
- W7M2 USPFO ACTIVITY FL ARNG
- Office code?
- 021.2100.NGB.JFHQ USPFO FL.USPFO FL PROC.W911YN
- Organization type?
- OFFICE
- Office address?
- ST AUGUSTINE, FL, 32085-1008, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Jacksonville
- State?
- Florida
- Zip?
- 32221
- Country?
- UNITED STATES
Contacts?
- Robert Glanowskiprimary
- Darrin Weaversecondary
Description?
PERFORMANCE WORK STATEMENT Mobile Office Demolition 1.0 Objective The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals. 2.0 Scope of Work This project will be executed in three (3) distinct phases: Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel. Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility. Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition. 3.0 Completion Standard The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear. 4.0 Details Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 Dimensions: 70 ft x 30 ft (2310-01-C03-6479, MOBILE HOME: 10834-AB) Site POC: CW2 Merrill, Andrew (904) 682-6215 ext. 1150 andrew.d.merrill2.mil@army.mil Site Visit Date: 09 September 2026 Time: 10:00 AM Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 POC: Andrew Merrill (CW2) andrew.d.merrill2.mil@army.mil (904) 682-6215 ext. 1150 Robert Glanowski (Contract Specialist) robert.j.glanowski.civ@army.mil (904) 823-0555 ***Attendance is not required and will not prohibit quote submissions.***
Attachments (3)?
Other notices in this solicitation?
- SolicitationMobile Home DemolitionSep 9, 2026LATEST
Similar open contracts
Metadata?
- Notice ID?
- da0ab67a2647465e9fd8d2d5b345df58
- Full path?
- DEPT OF DEFENSE.DEPT OF THE ARMY.W7M2 USPFO ACTIVITY FL ARNG
- Office code?
- 021.2100.NGB.JFHQ USPFO FL.USPFO FL PROC.W911YN
- Ingested?
- Sep 3, 2026
- Updated?
- Sep 13, 2026