GovBidAlerts
← All opportunities

Mobile Home Demolition

Key dates

Posted
Sep 9, 2026
Response deadline
Sep 11, 2026, 9:00 PM UTC
Archive date
Sep 26, 2026
Archive type
auto15

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
Small Business Set Aside - Total
Set-aside code
SBA
PSC
P400

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W7M2 USPFO ACTIVITY FL ARNG
Office code
021.2100.NGB.JFHQ USPFO FL.USPFO FL PROC.W911YN
Organization type
OFFICE
Office address
ST AUGUSTINE, FL, 32085-1008, USA

Place of performance

Street
Street 2
City
Jacksonville
State
Florida
Zip
32221
Country
UNITED STATES

Contacts

Description

***SEE ATTACHED Q&A SET AS OF 09 SEP 2026*** PERFORMANCE WORK STATEMENT Mobile Office Demolition 1.0 Objective The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals. 2.0 Scope of Work This project will be executed in three (3) distinct phases: Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel. Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility. Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition. 3.0 Completion Standard The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear. 4.0 Details Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 Dimensions: 70 ft x 30 ft (2310-01-C03-6479, MOBILE HOME: 10834-AB) Site POC: CW2 Merrill, Andrew (904) 682-6215 ext. 1150 andrew.d.merrill2.mil@army.mil Site Visit Date: 09 September 2026 Time: 10:00 AM Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 POC: Andrew Merrill (CW2) andrew.d.merrill2.mil@army.mil (904) 682-6215 ext. 1150 Robert Glanowski (Contract Specialist) robert.j.glanowski.civ@army.mil (904) 823-0555 ***Attendance is not required and will not prohibit quote submissions.***

Attachments (4)

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
d578f654fd3a46fbac4dfaf905d3e19a
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W7M2 USPFO ACTIVITY FL ARNG
Office code
021.2100.NGB.JFHQ USPFO FL.USPFO FL PROC.W911YN
Ingested
Sep 10, 2026
Updated
Sep 13, 2026
Mobile Home Demolition — DEPT OF DEFENSE / DEPT OF THE ARMY · GovBidAlerts