GovBidAlerts
This notice has been superseded. See the latest notice: Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB (Solicitation)
ClosedSolicitationFederal

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Department of Energy · Department of Energy

Closed Closed 7 days agoRef. RFP-376508-CD

At a glance

What

On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.

Industry: Industrial Building Construction (NAICS 236210)

Who can bid
Any business — no set-aside listed
Where
Batavia, IL
Key dates
  • Posted: Oct 6, 2026
  • Deadline: Tue, Nov 17, 2026 · 4:00 PM CST (closed 7 days ago)
How to respond

Chris Daley · cdaley@fnal.gov · 6308404256

Submit per the instructions on SAM.gov ↗

Description

On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications.
Read more ↓
All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

Documents (20)

Other notices in this solicitation

All notice detailsShow ↓
Solicitation number
RFP-376508-CD
Notice type
Solicitation
Set-aside
No Set aside used
Product/service code (PSC)
Z2EZ
Department
Department of Energy
Sub-agency
Department of Energy
Contracting office
FERMILAB - DOE CONTRACTOR
Office location
Batavia, IL, 60510
Place of performance
Batavia, Illinois, 60510, UNITED STATES
Archive date
Dec 2, 2026
Archive type
auto15
Set-aside code
NONE
Office code
089.8900.899034
Organization type
OFFICE
Full agency path
ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.FERMILAB - DOE CONTRACTOR
SAM.gov notice ID
d285489a5ca44b42a999bc943cc821cb

Industry (NAICS)

Contacts