GovBidAlerts
← All opportunities

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Key dates

Posted
Oct 7, 2026
Response deadline
Nov 17, 2026, 10:00 PM UTC
Archive date
Dec 2, 2026
Archive type
auto15

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
No Set aside used
Set-aside code
NONE
PSC
Z2EZ

NAICS

Issuing office

Department
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
FERMILAB - DOE CONTRACTOR
Office code
—
Organization type
OFFICE
Office address
Batavia, IL, 60510, USA

Place of performance

Street
—
Street 2
—
City
Batavia
State
IL
Zip
60510
Country
USA

Contacts

Description

On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
14034cd5817d49c38056351ef936d097
Full path
ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.FERMILAB - DOE CONTRACTOR
Office code
—
Ingested
Nov 11, 2026
Updated
Nov 11, 2026