SolicitationActiveFA461026QSDSP2
Storm Drain Study Cantonment Area Phase 2
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / FA4610 30 CONS PKKey dates?
- Posted?
- Jul 22, 2026
- Response deadline?
- Aug 11, 2026, 9:00 PM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- Total Small Business Set-Aside (FAR 19.5)
- Set-aside code?
- SBA
- PSC?
- F999
NAICS?
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE AIR FORCE
- Office?
- FA4610 30 CONS PK
- Office code?
- 097.5700.SSC.FA4610
- Organization type?
- OFFICE
- Office address?
- VANDENBERG SFB, CA, 93437-5212, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- —
- State?
- California
- Zip?
- 93437
- Country?
- UNITED STATES
Contacts?
- Chase Frenchprimary
- Kristofer Clarksecondary
Description?
RFI Questions due NLT 30 July 2026 by 1400 PDT. Quotes due NLT 11 August 2026 by 1400 PDT. The requirement is for a contractor to provide all management, labor, tools, equipment, and materials necessary to perform a comprehensive cleaning, CCTV video inspection, and GIS survey of the storm drain system at Vandenberg Space Force Base, California, within 365 days of contract award. This follow-on effort is critical to assessing infrastructure condition, ensuring continuous operational integrity, and preventing system failures that could cause flooding or environmental damage. Work must be executed in accordance with prevailing industry and government standards, including NASSCO Pipeline Assessment Certification Program guidelines, UFGS TV inspection specifications, and base CAD standards. Due to the active military installation setting, the contractor must strictly adhere to security access controls, background checks, and environmental compliance protocols, including biological monitoring for the protected Vernal Pool Fairy Shrimp. Additionally, the contractor must coordinate all material and sludge disposal with the 30CES/CEI Waste Compliance office and remain prepared for potential unexploded ordnance (UXO) monitoring during field operations. See PWS for additional information.
Attachments (11)?
- Download📎 Attach.+10+-+SCA+WD+2015-5647+Rev.+27_20260513.pdfapplication/pdf · 4.2 MB
- Download📎 Attach.+2+-+Storm+Drain+Study+Pricing+Schedule.xlsxapplication/octet-stream · 25 KB
- Download📎 Attach.+5+-+Appendix+C+VSFB+Front+End+Specification.pdfapplication/pdf · 2.0 MB
- Download📎 Attach.+9+-+Clauses+and+Provisions.pdfapplication/pdf · 132 KB
- Download📎 Attach.+4+-+Appendix+B+Carsonite+Marker+Catalog+Cutsheet.pdfapplication/pdf · 1023 KB
- Download📎 Attach.+3+-+Appendix+A+Location+of+Storm+Drain+Survey+Area.pdfapplication/pdf · 1.6 MB
- Download📎 Attach.+7+-+Appendix+E+XUMU181025B2+Previous+Storm+Drain+Study.pdfapplication/pdf · 50.9 MB
- Download📎 Attach.+8+-+Appendix+G+AF+Form+813.pdfapplication/pdf · 2.0 MB
- Download📎 Attach.+6+-+Appendix+D+UFGS+33+01+30.16+TV+Inspection+of+Sewer+Lines.pdfapplication/pdf · 255 KB
- Download📎 Storm+Drain+Study+Phase+II_Combo+RFQ.pdfapplication/pdf · 182 KB
- Download📎 Attach.+1+-+PWS_Survey+Storm+Drains+Phase+2.pdfapplication/pdf · 1.1 MB
Similar open contracts
Metadata?
- Notice ID?
- a17d842479bd4028bb7641966a36fd97
- Full path?
- DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA4610 30 CONS PK
- Office code?
- 097.5700.SSC.FA4610
- Ingested?
- Jul 23, 2026
- Updated?
- Jul 24, 2026