This notice has been superseded. See the latest notice: Horizontal Construction Multiple Award Contract (MAC) (Solicitation)
Horizontal Construction Multiple Award Contract (MAC)
Department of Defense · Department of the Air Force
No response deadline publishedRef. FA4626-26-R-0008
At a glance
- What
PRIMARY MAC - The purpose of the Horizontal Construction MAC is to provide design-bid-build and design-build construction services for a broad range of military renovation and construction projects, primarily in support of the Malmstrom…
Industry: Other Heavy and Civil Engineering Construction (NAICS 237990)
- Who can bid
- Small business set-aside
- Where
- Malmstrom AFB, MT
- Key dates
- Posted: Jun 12, 2026
- Deadline: Not published
- How to respond
Cody Babinecz · cody.babinecz@us.af.mil · 4067314608
Submit per the instructions on SAM.gov ↗
- Documents
- None attached here — check SAM.gov
Description
PRIMARY MAC - The purpose of the Horizontal Construction MAC is to provide design-bid-build and design-build construction services for a broad range of military renovation and construction projects, primarily in support of the Malmstrom AFB installation and its missile alert/launch facilities. Work performed under Horizontal Construction MAC orders may include but is not limited to the following heavy civil construction projects for the repair, alteration, and/or demolition of transportation infrastructure, utilities & energy systems (communication, electricity, natural gas, sewer, water, etc.), and site development. The initial ordering period is projected to be five (5) years with a two (2) year option year (potential total contract length of seven (7) years) and will have an estimated overall contract ceiling of $24,999,999.99.
Read more ↓Show less ↑
SEED PROJECT – The proposed initial task order to be awarded under the Horizontal Construction MAC is the Repair North/South Water System (Phase II) project on Malmstrom AFB, MT. This project consists of the replacement of various water mains within MAFB including valves, fittings, fire hydrants, meters, and various appurtenances. The project will include removal and restoration/replacement of the associated surface concrete driveways, sod, curb and gutter and asphalt surfacing. The period of performance is 180 calendar days after receipt of Notice to Proceed (NTP). Attached is the draft solicitation and seed project documents for the Repair North/South Water System (Phase II) project. NOTE: The Government IS NOT requesting the submission of proposals at this time and the official solicitation will be released at a later date.
Other notices in this solicitation
- SolicitationHorizontal Construction Multiple Award Contract (MAC)Jul 22, 2026Latest
- SolicitationHorizontal Construction Multiple Award Contract (MAC)Jul 9, 2026
- SolicitationHorizontal Construction Multiple Award Contract (MAC)Jun 18, 2026
- PresolicitationHorizontal Construction Multiple Award Contract (MAC)Jun 12, 2026
- PresolicitationHorizontal Construction Multiple Award Contract (MAC)May 21, 2026
All notice detailsShow ↓
- Solicitation number
- FA4626-26-R-0008
- Notice type
- Presolicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Product/service code (PSC)
- Z2NZ
- Department
- Department of Defense
- Sub-agency
- Department of the Air Force
- Contracting office
- FA4626 341 CONS LGC
- Office location
- MALMSTROM AFB, MT, 59402-6863
- Place of performance
- Malmstrom AFB, MT, 59402
- Archive date
- Jun 21, 2026
- Archive type
- autocustom
- Set-aside code
- SBA
- Organization type
- OFFICE
- Full agency path
- DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA4626 341 CONS LGC
- SAM.gov notice ID
- 5e4ccdae1f434ab0a25688280b298425
Industry (NAICS)
Contacts
- Cody Babinecz · primarycody.babinecz@us.af.mil(awards)4067314608
- Branden Lawson · secondarybranden.lawson@us.af.mil(awards)4067314353