ClosedState
2027-011 Keyes Road Culvert Replacement
City of Gardner
Closed Closed 12 days agoRef. BD-27-1441-COG01-COG01-134215
At a glance
- What
The project includes furnishing all labor, equipment and materials required to complete the Keyes Road over Wilder Brook Culvert Replacement Project.
- Where
- Massachusetts (COMMBUYS)
- Key dates
- Deadline: Thu, Nov 12, 2026 · 1:00 PM EST (closed 12 days ago)
- How to respond
Submit through the buyer's portal ↗ · how to bid
- Documents
- None attached here — see the source portal
Description
The project includes furnishing all labor, equipment and materials required to complete the Keyes Road over Wilder Brook Culvert Replacement Project. The project includes, but is not limited to phased demolition of the existing CMP culvert, demolition of the existing road surface and sidewalk, bank stabilization and grading, dewatering, dredging, roadway grading, water main relocation, installation of a new 24-foot span 3-sided rigid frame bridge structure, installation of new HMA walkway a
All notice detailsShow ↓
- Status
- open
- Jurisdiction
- Massachusetts (COMMBUYS)
- Reference #
- BD-27-1441-COG01-COG01-134215
- Bid Opening Date
- 11/12/2026 1:00 PM
This listing is a summary from Massachusetts (COMMBUYS)'s open procurement data. The full solicitation documents are on the source portal.