26-18 Sto842436B (Story)

Agriculture and Land Stewardship

Due Closes in 36 daysRef. 26-18 Sto842436B (Story)

At a glance

What

Completion Dates: Construction November 1, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications) In general, the work includes constructing a wetland that will treat the water from an existing…

Where
Iowa (state)
Key dates
  • Posted: Nov 23, 2026
  • Deadline: Wed, Dec 30, 2026 · 3:00 PM CST (closes in 36 days)
How to respond
Documents
None attached here — see the source portal

Description

Completion Dates: Construction November 1, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications) In general, the work includes constructing a wetland that will treat the water from an existing drainage district tile and ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, inlet and outlet concrete structures, solar-powered pump installation, installation of pipe, riprap placement, and seeding. This project includes around 13,900 total cubic yards of earthwork, 1,875 linear feet of pipe installation, 20 tons of riprap, Modified SW-513 concrete inlet structure, Modified SW-513 concrete outlet structure, modified SW401 concrete manhole, modified SW401 pump basin, solar pump system and 27.3 acres of seeding. The estimated construction cost range for this project is $175,000 to $275,000.
All notice detailsShow ↓
Posted
Nov 23, 2026
Status
open
Jurisdiction
Iowa (state)
Reference #
26-18 Sto842436B (Story)
Keywords
wetland, wetlands, tile, solar, excavation, grading, concrete, pump, riprap,
Agency Number
009
Agency Contact Title
Contract Manager

This listing is a summary from Iowa (state)'s open procurement data. The full solicitation documents are on the source portal.