GovBidAlerts
OpenIFBState

(1): Job J9P3122 Route I-55 CAPE GIRARDEAU County. Grading, paving, drainage, guardrail and 3 bridge rehabilitations over BNSF Railway and Route 74 and Route 61 over I-55 and at Route 61 and Silver Springs Road, the total length of improvement being 1.849 miles.

Missouri DOT

Due Closes in 2 daysRef. 20261120-H01

At a glance

What

Missouri DOT has posted an open IFB: (1): Job J9P3122 Route I-55 CAPE GIRARDEAU County. Grading, paving, drainage, guardrail and 3 bridge rehabilitations over BNSF Railway and Route 74 and Route 61 over I-55 and at Route 61 and Silver Springs Road, the total length of improvement being 1.849 miles. It has a place of performance in MO. Responses are due November 21, 2026.

Where
MO
Key dates
  • Deadline: Fri, Nov 20, 2026 · 10:59 PM CST (closes in 2 days)
How to respond
Documents
None attached here — see the source portal

Summary

Missouri DOT has posted an open IFB: (1): Job J9P3122 Route I-55 CAPE GIRARDEAU County. Grading, paving, drainage, guardrail and 3 bridge rehabilitations over BNSF Railway and Route 74 and Route 61 over I-55 and at Route 61 and Silver Springs Road, the total length of improvement being 1.849 miles. It has a place of performance in MO. Responses are due November 21, 2026.

This source publishes no description; this summary restates the listing details.

All notice detailsShow ↓
Type
IFB
Status
open
Jurisdiction
Missouri DOT
Location
MO
Reference #
20261120-H01
Call
H01
Letting Date
11/20/2026

This listing is a summary from Missouri DOT's open procurement data. The full solicitation documents are on the source portal.