GovBidAlerts
OpenState

26-20 Gru891821B (Grundy)

Agriculture and Land Stewardship

Due Closes in 36 daysRef. 26-20 Gru891821B (Grundy)

At a glance

What

Completion Dates: Construction: September 15, 2027 Seeding: November 30, 2027 (Structure and Buffer Seedings must follow the seeding period stipulated in the Technical Specifications) This project is for a nutrient reduction wetland.

Where
Iowa (state)
Key dates
  • Posted: Nov 23, 2026
  • Deadline: Wed, Dec 30, 2026 · 3:00 PM CST (closes in 36 days)
How to respond
Documents
None attached here — see the source portal

Description

Completion Dates: Construction: September 15, 2027 Seeding: November 30, 2027 (Structure and Buffer Seedings must follow the seeding period stipulated in the Technical Specifications) This project is for a nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, tied concrete block mat installation, tile installation, water control structure, riprap, and seeding. This project includes about 11,500 cubic yards of excavation, 12,700 cy of earthfill, installation of 14,800 square feet of tied concrete block mat, two water control structure installations, 4650 linear feet (LF) of tile installation, 220 tons of riprap installation in various sizes, and 14.4 acres of seeding. The estimated construction cost range for this project is $400,00 to $450,000.
All notice detailsShow ↓
Posted
Nov 23, 2026
Status
open
Jurisdiction
Iowa (state)
Reference #
26-20 Gru891821B (Grundy)
Keywords
Wetland
Agency Number
009
Agency Contact Title
Contract Manager

This listing is a summary from Iowa (state)'s open procurement data. The full solicitation documents are on the source portal.