The County intends to contract for design-build services associated with the Solid Waste Pump Station 201 Improvements project. Pinellas County Solid Waste's asset lift station 201 (Pump Station 201) needs improvements. Pump Station 201 at the Solid Waste Disposal Complex is 725 gallons per minute (gpm), 45 horsepower (hp), and a triplex lift station. The lift station utilized Flygt pumps and a Flygt-manufactured control panel. The control panel was designed and fabricated to operate a triplex lift station; however, only two pumps (Pump 1 and Pump 3) were installed in the wet well. The County has determined that a third pump will not be required in the future based on operational flows observed since the lift station was installed. Therefore, Pump 3 cycles two times for every time Pump 1 turns on. The county would like to have the control panel modified to allow Pump 1 and Pump 3 to cycle alternatively to minimize excessive wear and tear to Pump 3 and provide an even lifespan to the two pumps. Wastewater discharged at the lift station through an 8-inch force main with wastewater flow is measured by an 8-inch magnetic flow meter installed downstream of the valve pit. In general, the lift station is working. However, the magnetic flow meter is not reading correctly, likely due to water sloshing back and forth across it when the pumps are turned off. In addition, the valves before and after the magnetic flow meter are non-operational and will require replacement.

Details

Posted
Mar 27, 2025
Response deadline
Apr 10, 2025, 7:00 PM UTC
Status
closed
Buyer
pinellasfl
Department
SOLID WASTE
Jurisdiction
pinellasfl
Reference #
25-0549-RFP-Design-Build
Summary
<p>The County intends to contract for design-build services associated with the Solid Waste Pump Station 201 Improvements project. Pinellas County Solid Waste's asset lift station 201 (Pump Station 20
Is Paused
false
Template Title
Solicitation
Copy Count
0
Government Organization City
Clearwater
Government Organization Name
Pinellas County
Government Organization State
FL
Government Organization Website
http://www.pinellascounty.org/
Government Organization Zip Code
33765
Government Organization Address1
Pinellas County Courthouse Annex Bldg., Sixth Floor
Government Organization Address2
400 S. Ft. Harrison Ave.
Government Organization Timezone
America/New_York
Government Organization Country Code
US
Government Organization Phone Country
1
Closed Substatus
awarded

Contact

(727)464-3311
Finding similar opportunities…

This listing is a summary from pinellasfl's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 156989,
  "_slug": "pinellasfl",
  "title": "Solid Waste Pump Station 201 Improvements",
  "status": "closed",
  "summary": "<p>The County intends to contract for design-build services associated with the Solid Waste Pump Station 201 Improvements project. Pinellas County Solid Waste's asset lift station 201 (Pump Station 201) needs improvements. Pump Station 201 at the Solid Waste Disposal Complex is 725 gallons per minute (gpm), 45 horsepower (hp), and a triplex lift station. &nbsp;The lift station utilized Flygt pumps and a Flygt-manufactured control panel. &nbsp;The control panel was designed and fabricated to operate a triplex lift station; however, only two pumps (Pump 1 and Pump 3) were installed in the wet well. &nbsp;The County has determined that a third pump will not be required in the future based on operational flows observed since the lift station was installed. &nbsp;Therefore, Pump 3 cycles two times for every time Pump 1 turns on. &nbsp;The county would like to have the control panel modified to allow Pump 1 and Pump 3 to cycle alternatively to minimize excessive wear and tear to Pump 3 and provide an even lifespan to the two pumps.</p><p><br>Wastewater discharged at the lift station through an 8-inch force main with wastewater flow is measured by an 8-inch magnetic flow meter installed downstream of the valve pit. In general, the lift station is working. However, the magnetic flow meter is not reading correctly, likely due to water sloshing back and forth across it when the pumps are turned off. In addition, the valves before and after the magnetic flow meter are non-operational and will require replacement.</p>",
  "isPaused": false,
  "template": {
    "title": "Solicitation"
  },
  "addendums": [],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2025-03-24T20:14:19.535Z",
  "department": {
    "id": 2028,
    "name": "SOLID WASTE"
  },
  "government": {
    "code": "pinellasfl",
    "organization": {
      "city": "Clearwater",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/8fdb5763-d79b-4f9c-a0d9-f0650eaa84b8_PUR_Cnty_logo_RGB.png",
      "name": "Pinellas County",
      "phone": "(727)464-3311",
      "state": "FL",
      "website": "http://www.pinellascounty.org/",
      "zipCode": "33765",
      "address1": "Pinellas County Courthouse Annex Bldg., Sixth Floor",
      "address2": "400 S. Ft. Harrison Ave.",
      "phoneExt": null,
      "timezone": "America/New_York",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "25-0549-RFP-Design-Build",
  "closeOutReason": null,
  "closedSubstatus": "awarded",
  "proposalDeadline": "2025-04-10T19:00:17.424Z",
  "releaseProjectDate": "2025-03-27T12:17:57.912Z"
}