GovBidAlerts
← My Opportunities
closed🌐 pinellasfl23-0273-ITB-CP Step 2

Solid Waste Industrial Waste Treatment Facility (IWTF) Intake Pump Station (IPS) PID: 002423A Step 2

pinellasfl / SOLID WASTE

Description

The County owns and operates an Industrial Water Treatment Plant (IWTP) located within the Bridgeway Acre Landfill. The plant treats runoff water in Pond A to supply water at the Waste-to-Energy Plant’s cooling towers. Currently, the intake pump systems in Pond A do not operate at full design capacity as well as meeting their Lifespan, causing multiple disruption to the water treatment operation. This project is to install new intake pump systems with safety upgrades to the pump station.

Details

Posted
Jan 20, 2023
Response deadline
Feb 23, 2023, 8:00 PM UTC
Status
closed
Buyer
pinellasfl
Department
SOLID WASTE
Jurisdiction
pinellasfl
Reference #
23-0273-ITB-CP Step 2
Summary
<p>The County owns and operates an Industrial Water Treatment Plant (IWTP) located within the Bridgeway Acre Landfill. The plant treats runoff water in Pond A to supply water at the Waste-to-Energy Pl
Is Paused
false
Template Title
Invitation to Bid - Construction
Copy Count
0
Government Organization City
Clearwater
Government Organization Name
Pinellas County
Government Organization State
FL
Government Organization Website
http://www.pinellascounty.org/
Government Organization Zip Code
33765
Government Organization Address1
Pinellas County Courthouse Annex Bldg., Sixth Floor
Government Organization Address2
400 S. Ft. Harrison Ave.
Government Organization Timezone
America/New_York
Government Organization Country Code
US
Government Organization Phone Country
1
Closed Substatus
awarded

Contact

(727)464-3311
Finding similar opportunities…

This listing is a summary from pinellasfl's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 35658,
  "_slug": "pinellasfl",
  "title": "Solid Waste Industrial Waste Treatment Facility (IWTF) Intake Pump Station (IPS) PID: 002423A Step 2",
  "status": "closed",
  "summary": "<p>The County owns and operates an Industrial Water Treatment Plant (IWTP) located within the Bridgeway Acre Landfill. The plant treats runoff water in Pond A to supply water at the Waste-to-Energy Plant’s cooling towers. Currently, the intake pump systems in Pond A do not operate at full design capacity as well as meeting their Lifespan, causing multiple disruption to the water treatment operation. This project is to install new intake pump systems with safety upgrades to the pump station.</p><p>&nbsp;</p>",
  "isPaused": false,
  "template": {
    "title": "Invitation to Bid - Construction"
  },
  "addendums": [
    {
      "id": 15488
    }
  ],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2023-01-20T19:46:35.000Z",
  "department": {
    "id": 2028,
    "name": "SOLID WASTE"
  },
  "government": {
    "code": "pinellasfl",
    "organization": {
      "city": "Clearwater",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/8fdb5763-d79b-4f9c-a0d9-f0650eaa84b8_PUR_Cnty_logo_RGB.png",
      "name": "Pinellas County",
      "phone": "(727)464-3311",
      "state": "FL",
      "website": "http://www.pinellascounty.org/",
      "zipCode": "33765",
      "address1": "Pinellas County Courthouse Annex Bldg., Sixth Floor",
      "address2": "400 S. Ft. Harrison Ave.",
      "phoneExt": null,
      "timezone": "America/New_York",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "23-0273-ITB-CP Step 2",
  "closeOutReason": null,
  "closedSubstatus": "awarded",
  "proposalDeadline": "2023-02-23T20:00:00.000Z",
  "releaseProjectDate": "2023-01-20T05:00:00.000Z"
}