GovBidAlerts
← My Opportunities
closed🌐 washington-county-or2025.081-RFP

A&E and Related Services - Washington County Active Transportation Plan Elements of the Transportation System Plan

washington-county-or / LUT-CPS

Description

The statement of work (SOW) will be developed and negotiated, within the scope advertised in this RFP, with the selected Proposer for inclusion in the Contract. A draft SOW is provided in RFP Attachment B, which will be negotiated with the selected Proposer for inclusion in the Contract. Project location: Washington County Estimated date for completion of the A&E and Related Services required under this RFP: June 18, 2027 Estimated range of costs for the A&E and Related Services required under this RFP : $200,000 to $300,000 Washington County (“Agency”) is planning to complete the Active Transportation Plan elements of the Transportation System Plan (“Project”). The goal of the Project is to update the Active Transportation section (including Pedestrian, Bicycle and Transit modes) of Washington County’s Transportation System Plan and other policy documents and guidelines to support safe, convenient and accessible pedestrian and bicycle travel. This includes revising modal plans, networks and strategies to be inclusive of complete street principles, provide safe access to priority destinations through a prioritized list of projects and incorporate neighborhood bikeways; consolidating existing bike/ped facility design guidance documents; clarifying protected bicycle and trail design options for adoption into County’s standards; establishing area context types that inform cross-section design details for major roadway projects; and developing a maintenance strategy to better account for lifecycle cost and clarify staff and equipment needs. Agency is requesting supplemental information regarding specific Planning Services experience relevant to the above referenced Project. The needed Services are further described in Section 3. The expected outcome of the WOC is to have a final set of deliverables that will be incorporated into the County’s forthcoming updates to the Transportation System Plan and the Road Design and Construction Standards following Project acknowledgement by the Board of County Commissioners.

Details

Posted
Sep 29, 2025
Response deadline
Oct 30, 2025, 12:00 AM UTC
Status
closed
Buyer
washington-county-or
Department
LUT-CPS
Jurisdiction
washington-county-or
Reference #
2025.081-RFP
Summary
<p style="margin: 0in; font-size: 12pt;"><span style="font-size: 11.0pt;">The statement of work (SOW) will be developed and negotiated, within the scope advertised in this RFP, with the selected Propo
Is Paused
false
Template Title
Request for Proposal
Copy Count
0
Government Organization City
Hillsboro
Government Organization Name
Washington County, Oregon
Government Organization State
OR
Government Organization Website
https://www.co.washington.or.us/
Government Organization Zip Code
97124
Government Organization Address1
155 N First Ave
Government Organization Timezone
America/Los_Angeles
Government Organization Country Code
US
Government Organization Phone Country
1
Closed Substatus
awarded
Finding similar opportunities…

This listing is a summary from washington-county-or's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 197937,
  "_slug": "washington-county-or",
  "title": "A&E and Related Services - Washington County Active Transportation Plan Elements of the Transportation System Plan",
  "status": "closed",
  "summary": "<p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt;\">The statement of work (SOW) will be developed and negotiated, within the scope advertised in this RFP, with the selected Proposer for inclusion in the Contract. <span style=\"background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">A draft SOW is provided in RFP Attachment B, which will be negotiated with the selected Proposer for inclusion in the Contract.</span></span></p><p style=\"margin: 0in; font-size: 12pt;\"><strong><span style=\"font-size: 10.0pt;\">&nbsp;</span></strong></p><ul style=\"margin-top: 0in; margin-bottom: 0in;\" type=\"disc\"><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt;\">Project location: Washington County</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt;\">Estimated date for completion of the A&amp;E and Related Services required under this RFP: <span style=\"background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">June 18, 2027 </span></span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt;\">Estimated range of costs for the A&amp;E and Related Services required under this RFP<span style=\"background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">: $200,000 to $300,000</span></span></li></ul><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt;\">&nbsp;</span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt;\">Washington County (&ldquo;Agency&rdquo;) is planning to complete the Active Transportation Plan elements of the Transportation System Plan (&ldquo;Project&rdquo;). The goal of the Project is to update the Active Transportation section (including Pedestrian, Bicycle and Transit modes) of Washington County&rsquo;s Transportation System Plan and other policy documents and guidelines to support safe, convenient and accessible pedestrian and bicycle travel. This includes revising modal plans, networks and strategies to be inclusive of complete street principles, provide safe access to priority destinations through a prioritized list of projects and incorporate neighborhood bikeways; consolidating existing bike/ped facility design guidance documents; clarifying protected bicycle and trail design options for adoption into County&rsquo;s standards; establishing area context types that inform cross-section design details for major roadway projects; and developing a maintenance strategy to better account for lifecycle cost and clarify staff and equipment needs.</span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt;\">&nbsp;</span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt;\">Agency is requesting supplemental information regarding specific Planning Services experience relevant to the above referenced Project. The needed Services are further described in Section 3. The expected outcome of the WOC is to have a final set of deliverables that will be incorporated into the County&rsquo;s forthcoming updates to the Transportation System Plan and the Road Design and Construction Standards following Project acknowledgement by the Board of County Commissioners. </span></p>",
  "isPaused": false,
  "template": {
    "title": "Request for Proposal"
  },
  "addendums": [
    {
      "id": 90770
    }
  ],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2025-09-09T18:35:44.541Z",
  "department": {
    "id": 302,
    "name": "LUT-CPS"
  },
  "government": {
    "code": "washington-county-or",
    "organization": {
      "city": "Hillsboro",
      "logo": "https://assets.procurement.opengov.com/logos/washingtoncountyor.png",
      "name": "Washington County, Oregon",
      "phone": null,
      "state": "OR",
      "website": "https://www.co.washington.or.us/",
      "zipCode": "97124",
      "address1": "155 N First Ave",
      "address2": null,
      "phoneExt": null,
      "timezone": "America/Los_Angeles",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "2025.081-RFP",
  "closeOutReason": null,
  "closedSubstatus": "awarded",
  "proposalDeadline": "2025-10-30T00:00:05.738Z",
  "releaseProjectDate": "2025-09-29T20:13:14.336Z"
}