GovBidAlerts
← My Opportunities
closed🌐 pinellasfl23-0028-ITB-CONSTRUCTION STEP 2

Industrial Waste Treatment Facility Clarifier System Phase 2: STEP 2

pinellasfl / PUBLIC WORKS

Description

General work description: The County owns and operates an Industrial Water Treatment Plant (IWTP) located within the Bridgeway Acre Landfill. The ITWP was designed with a 2.50 MGD average daily flow design capacity. Since the ITWP was Started up in 2013, the facility has not been able to sustain operations at full design capacity. The Engineer of Record (CDM Smith) was tasked to review the plant performance and determined that a new secondary clarifier is required to accommodate intended average daily flow. This project is to construct a 60-foot diameter clarifier and 30 foot diameter thickener to meet the FDEP's requirements.

Details

Posted
Nov 30, 2022
Response deadline
Jan 12, 2023, 8:00 PM UTC
Status
closed
Buyer
pinellasfl
Department
PUBLIC WORKS
Jurisdiction
pinellasfl
Reference #
23-0028-ITB-CONSTRUCTION STEP 2
Summary
<p>General work description: The County owns and operates an Industrial Water Treatment Plant (IWTP) located within the Bridgeway Acre Landfill. The ITWP was designed with a 2.50 MGD average daily flo
Is Paused
false
Template Title
Solicitation
Copy Count
0
Government Organization City
Clearwater
Government Organization Name
Pinellas County
Government Organization State
FL
Government Organization Website
http://www.pinellascounty.org/
Government Organization Zip Code
33765
Government Organization Address1
Pinellas County Courthouse Annex Bldg., Sixth Floor
Government Organization Address2
400 S. Ft. Harrison Ave.
Government Organization Timezone
America/New_York
Government Organization Country Code
US
Government Organization Phone Country
1
Closed Substatus
awarded

Contact

(727)464-3311
Finding similar opportunities…

This listing is a summary from pinellasfl's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 32065,
  "_slug": "pinellasfl",
  "title": "Industrial Waste Treatment Facility Clarifier System Phase 2: STEP 2",
  "status": "closed",
  "summary": "<p>General work description: The County owns and operates an Industrial Water Treatment Plant (IWTP) located within the Bridgeway Acre Landfill. The ITWP was designed with a 2.50 MGD average daily flow design capacity. Since the ITWP was Started up in 2013, the facility has not been able to sustain operations at full design capacity. The Engineer of Record (CDM Smith) was tasked to review the plant performance and determined that a new secondary clarifier is required to accommodate intended average daily flow. This project is to construct a 60-foot diameter clarifier and 30 foot diameter thickener to meet the FDEP's requirements.</p>",
  "isPaused": false,
  "template": {
    "title": "Solicitation"
  },
  "addendums": [
    {
      "id": 13468
    },
    {
      "id": 14069
    }
  ],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": null,
  "created_at": "2022-11-30T18:08:08.000Z",
  "department": {
    "id": 2010,
    "name": "PUBLIC WORKS"
  },
  "government": {
    "code": "pinellasfl",
    "organization": {
      "city": "Clearwater",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/8fdb5763-d79b-4f9c-a0d9-f0650eaa84b8_PUR_Cnty_logo_RGB.png",
      "name": "Pinellas County",
      "phone": "(727)464-3311",
      "state": "FL",
      "website": "http://www.pinellascounty.org/",
      "zipCode": "33765",
      "address1": "Pinellas County Courthouse Annex Bldg., Sixth Floor",
      "address2": "400 S. Ft. Harrison Ave.",
      "phoneExt": null,
      "timezone": "America/New_York",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "23-0028-ITB-CONSTRUCTION STEP 2",
  "closeOutReason": null,
  "closedSubstatus": "awarded",
  "proposalDeadline": "2023-01-12T20:00:00.000Z",
  "releaseProjectDate": "2022-11-30T18:11:35.793Z"
}