closed🌐 tustinCIP Nos. 40087 and 70254
Main Street Improvements (CIP No. 40087) & Old Town Improvements (CIP No. 70254)
tustin / Public Works
Description
NOTICE INVITING SEALED BIDS CITY OF TUSTIN, CALIFORNIA NOTICE INVITING SEALED BID FOR THE Main Street and Old Town Improvement Projects (Federal Aid Projects: STBG, CMAQ, and CDBG) NOTICE IS HEREBY GIVEN that the CITY OF TUSTIN , as AGENCY, invites sealed bids for the above stated project and will receive bids for construction, materials, supplies, equipment, and/or services set forth herein, subject to all conditions outlined in the Bid Package. Scope of Work: The work consists of furnishing all labor, tools, transportation, equipment, materials and incidentals for: Main Street Improvement Project (STBG and CMAQ Funded): Located on Main Street between Prospect Avenue and Newport Avenue , work includes: Reducing curb-to-curb width to approx. 56 feet Widening sidewalks on both sides Relocating the library parking lot driveway to align with Tustin Plaza driveway Constructing a new driveway to the public parking lot at 235 E. Main Street Installing an 8-foot-wide landscaped median Converting on-street parking to angled parking Installing an in-pavement lighted crosswalk at the easterly library driveway Installing a gateway sign spanning Main Street Installing electrical receptacles at tree wells and circuits for string lights Adding Class II bike lanes, street trees, furniture, and lighting Modifying traffic signals and installing radar detection at Main Street & Newport Avenue Old Town Improvement Project (CDBG Funded): Located on El Camino Real between Sixth Street and First Street , and Main Street from El Camino Real to C Street , work includes: Roadway reconstruction and paving Installation of new sidewalks, pedestrian concrete areas, curbs, gutters, and driveways Drainage improvements and utility adjustments Landscaping, irrigation, and lighting Traffic signal improvements and miscellaneous items Surface water, sediment, erosion, dust, and noise control Coordination with adjacent businesses, schools, and utilities Project Schedule: 160 Working Days Engineer’s Estimate: $12.3 million to $12.4 million
Details?
- Posted
- Jul 16, 2025
- Response deadline
- Aug 26, 2025, 5:00 PM UTC
- Status
- closed
- Buyer
- tustin
- Department
- Public Works
- Jurisdiction
- tustin
- Reference #
- CIP Nos. 40087 and 70254
- Summary
- <p style="margin: 0in; font-size: 12pt;"><span style="font-size: 14px;"><strong>NOTICE INVITING SEALED BIDS</strong></span><br><span style="font-size: 14px;"><strong>CITY OF TUSTIN, CALIFORNIA</strong
- Is Paused
- false
- Template Title
- Tustin - Public Works Bid (CIP)
- Copy Count
- 0
- Government Organization Logo
- https://assets.procurement.opengov.com/logos/tustin.png
- Government Organization Name
- City of Tustin
- Government Organization State
- CA
- Government Organization Website
- https://www.tustinca.org/
- Government Organization Zip Code
- 92780
- Government Organization Address1
- 300 Centennial Way
- Government Organization Timezone
- America/Los_Angeles
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Closed Substatus
- awarded
Finding similar opportunities…
This listing is a summary from tustin's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 150329,
"_slug": "tustin",
"title": "Main Street Improvements (CIP No. 40087) & Old Town Improvements (CIP No. 70254)",
"status": "closed",
"summary": "<p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\"><strong>NOTICE INVITING SEALED BIDS</strong></span><br><span style=\"font-size: 14px;\"><strong>CITY OF TUSTIN, CALIFORNIA</strong></span></p><p style=\"margin: 0in; font-size: 12pt;\"> </p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\"><strong>NOTICE INVITING SEALED BID</strong></span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\"><strong>FOR THE</strong></span></p><p style=\"margin: 0in; font-size: 12pt;\"> </p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\"><strong>Main Street and Old Town Improvement Projects</strong></span><br><span style=\"font-size: 14px;\">(Federal Aid Projects: STBG, CMAQ, and CDBG)</span></p><div style=\"text-align: center; margin: 0in; font-size: 12pt;\" align=\"center\"><hr align=\"center\" size=\"2\" width=\"100%\"></div><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\"><strong>NOTICE IS HEREBY GIVEN</strong> that the <strong>CITY OF TUSTIN</strong>, as AGENCY, invites sealed bids for the above stated project and will receive bids for construction, materials, supplies, equipment, and/or services set forth herein, subject to all conditions outlined in the Bid Package.</span></p><div style=\"text-align: center; margin: 0in; font-size: 12pt;\" align=\"center\"><hr align=\"center\" size=\"2\" width=\"100%\"></div><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\"><strong>Scope of Work:</strong></span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\">The work consists of furnishing all labor, tools, transportation, equipment, materials and incidentals for:</span></p><p style=\"margin: 0in; font-size: 12pt;\"> </p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\"><strong>Main Street Improvement Project (STBG and CMAQ Funded):</strong></span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\">Located on <strong>Main Street between Prospect Avenue and Newport Avenue</strong>, work includes:</span></p><ul style=\"margin-bottom: 0in; margin-top: 0px;\" type=\"disc\"><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Reducing curb-to-curb width to approx. 56 feet</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Widening sidewalks on both sides</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Relocating the library parking lot driveway to align with Tustin Plaza driveway</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Constructing a new driveway to the public parking lot at 235 E. Main Street</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Installing an 8-foot-wide landscaped median</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Converting on-street parking to angled parking</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Installing an in-pavement lighted crosswalk at the easterly library driveway</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Installing a gateway sign spanning Main Street</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Installing electrical receptacles at tree wells and circuits for string lights</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Adding Class II bike lanes, street trees, furniture, and lighting</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Modifying traffic signals and installing radar detection at Main Street & Newport Avenue</span></li></ul><p style=\"margin: 0in; font-size: 12pt;\"> </p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\"><strong>Old Town Improvement Project (CDBG Funded):</strong></span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\">Located on <strong>El Camino Real between Sixth Street and First Street</strong>, and <strong>Main Street from El Camino Real to C Street</strong>, work includes:</span></p><ul style=\"margin-bottom: 0in; margin-top: 0px;\" type=\"disc\"><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Roadway reconstruction and paving</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Installation of new sidewalks, pedestrian concrete areas, curbs, gutters, and driveways</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Drainage improvements and utility adjustments</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Landscaping, irrigation, and lighting</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Traffic signal improvements and miscellaneous items</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Surface water, sediment, erosion, dust, and noise control</span></li><li style=\"margin-top: 0in; margin-right: 0in; margin-bottom: 0in; font-size: 14px;\"><span style=\"font-size: 14px;\">Coordination with adjacent businesses, schools, and utilities</span></li></ul><div style=\"text-align: center; margin: 0in; font-size: 12pt;\" align=\"center\"><hr align=\"center\" size=\"2\" width=\"100%\"></div><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 14px;\"><strong>Project Schedule:</strong> 160 Working Days</span><br><span style=\"font-size: 14px;\"><strong>Engineer’s Estimate:</strong> $12.3 million to $12.4 million</span></p>",
"isPaused": false,
"template": {
"title": "Tustin - Public Works Bid (CIP)"
},
"addendums": [
{
"id": 84427
}
],
"copyCount": 0,
"isPrivate": false,
"comingSoon": null,
"created_at": "2025-02-26T22:39:22.121Z",
"department": {
"id": 377,
"name": "Public Works"
},
"government": {
"code": "tustin",
"organization": {
"city": "Tustin",
"logo": "https://assets.procurement.opengov.com/logos/tustin.png",
"name": "City of Tustin",
"phone": null,
"state": "CA",
"website": "https://www.tustinca.org/",
"zipCode": "92780",
"address1": "300 Centennial Way",
"address2": null,
"phoneExt": null,
"timezone": "America/Los_Angeles",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "CIP Nos. 40087 and 70254",
"closeOutReason": null,
"closedSubstatus": "awarded",
"proposalDeadline": "2025-08-26T17:00:26.562Z",
"releaseProjectDate": "2025-07-16T23:34:16.549Z"
}