GovBidAlerts
OpenIFBState

(1): Job JST0189 Route D, AF, 44 SOR FRANKLIN County. Resurface, 3 Routes from Route WW to north of Christland Drive, Route AF from Ridge Road to Route 185, and Outer Road 44 from Plaza Drive to Route 47, the total length of improvement being 3.974 miles.

Missouri DOT

Due Closes in 30 daysRef. 20261218-F08

At a glance

What

Missouri DOT has posted an open IFB: (1): Job JST0189 Route D, AF, 44 SOR FRANKLIN County. Resurface, 3 Routes from Route WW to north of Christland Drive, Route AF from Ridge Road to Route 185, and Outer Road 44 from Plaza Drive to Route 47, the total length of improvement being 3.974 miles. It has a place of performance in MO. Responses are due December 19, 2026.

Where
MO
Key dates
  • Deadline: Fri, Dec 18, 2026 · 10:59 PM CST (closes in 30 days)
How to respond
Documents
None attached here — see the source portal

Summary

Missouri DOT has posted an open IFB: (1): Job JST0189 Route D, AF, 44 SOR FRANKLIN County. Resurface, 3 Routes from Route WW to north of Christland Drive, Route AF from Ridge Road to Route 185, and Outer Road 44 from Plaza Drive to Route 47, the total length of improvement being 3.974 miles. It has a place of performance in MO. Responses are due December 19, 2026.

This source publishes no description; this summary restates the listing details.

All notice detailsShow ↓
Type
IFB
Status
open
Jurisdiction
Missouri DOT
Location
MO
Reference #
20261218-F08
Call
F08
Letting Date
12/18/2026

This listing is a summary from Missouri DOT's open procurement data. The full solicitation documents are on the source portal.