(1): Job JST0189 Route D, AF, 44 SOR FRANKLIN County. Resurface, 3 Routes from Route WW to north of Christland Drive, Route AF from Ridge Road to Route 185, and Outer Road 44 from Plaza Drive to Route 47, the total length of improvement being 3.974 miles.
At a glance
- What
Missouri DOT has posted an open IFB: (1): Job JST0189 Route D, AF, 44 SOR FRANKLIN County. Resurface, 3 Routes from Route WW to north of Christland Drive, Route AF from Ridge Road to Route 185, and Outer Road 44 from Plaza Drive to Route 47, the total length of improvement being 3.974 miles. It has a place of performance in MO. Responses are due December 19, 2026.
- Where
- MO
- Key dates
- Deadline: Fri, Dec 18, 2026 · 10:59 PM CST (closes in 30 days)
- How to respond
Submit through the buyer's portal ↗ · how to bid
- Documents
- None attached here — see the source portal
Summary
Missouri DOT has posted an open IFB: (1): Job JST0189 Route D, AF, 44 SOR FRANKLIN County. Resurface, 3 Routes from Route WW to north of Christland Drive, Route AF from Ridge Road to Route 185, and Outer Road 44 from Plaza Drive to Route 47, the total length of improvement being 3.974 miles. It has a place of performance in MO. Responses are due December 19, 2026.
This source publishes no description; this summary restates the listing details.
All notice detailsShow ↓
- Type
- IFB
- Status
- open
- Jurisdiction
- Missouri DOT
- Location
- MO
- Reference #
- 20261218-F08
- Call
- F08
- Letting Date
- 12/18/2026
This listing is a summary from Missouri DOT's open procurement data. The full solicitation documents are on the source portal.