GovBidAlerts
← My Opportunities
closed🌐 toaks2021/2022-17

Electric Vehicle Charging Stations (CI5569)

toaks / Public Works - CIP

Description

The work consists of furnishing all labor, materials, tools, equipment, and incidentals as required by the plans, specifications, and Contract Documents. The general items of work include the installation of three (3) City furnished dual port Level 2 electric vehicle charging stations at the Newbury Park Library and four (4) City furnished dual port Level 2 electric vehicle charging stations at the Grant Brimhall Library. Work also includes providing all civil and electrical infrastructure for the charging stations including signage, pavement striping, ADA access ramps, switchboards, conduit, wire, site restoration incidental to construction operations, energizing, and coordination with Southern California Edison for power service.

Details

Posted
Nov 11, 2022
Response deadline
Dec 14, 2022, 11:30 PM UTC
Status
closed
Buyer
toaks
Department
Public Works - CIP
Jurisdiction
toaks
Reference #
2021/2022-17
Summary
<p>The work consists of furnishing all labor, materials, tools, equipment, and incidentals as required by the plans, specifications, and Contract Documents. The general items of work include the insta
Is Paused
false
Template Title
Public Solicitation for Bids
Copy Count
0
Government Organization City
Thousand Oaks
Government Organization Name
City of Thousand Oaks
Government Organization State
CA
Government Organization Zip Code
91362
Government Organization Address1
2100 Thousand Oaks Blvd
Government Organization Timezone
America/Los_Angeles
Government Organization Country Code
US
Government Organization Phone Country
1
Closed Substatus
awarded

Contact

(805)449-2239
Finding similar opportunities…

This listing is a summary from toaks's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 29935,
  "_slug": "toaks",
  "title": "Electric Vehicle Charging Stations (CI5569)",
  "status": "closed",
  "summary": "<p>The work consists of furnishing all labor, materials, tools, equipment, and incidentals as required by the plans, specifications, and Contract Documents. The general items of work include the installation of three (3) City furnished dual port Level 2 electric vehicle charging stations at the Newbury Park Library and four (4) City furnished dual port Level 2 electric vehicle charging stations at the Grant Brimhall Library. Work also includes providing all civil and electrical infrastructure for the charging stations including signage, pavement striping, ADA access ramps, switchboards, conduit, wire, site restoration incidental to construction operations, energizing, and coordination with Southern California Edison for power service.</p><p>&nbsp;</p>",
  "isPaused": false,
  "template": {
    "title": "Public Solicitation for Bids"
  },
  "addendums": [
    {
      "id": 13414
    },
    {
      "id": 13129
    }
  ],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": null,
  "created_at": "2022-10-26T20:05:58.000Z",
  "department": {
    "id": 2607,
    "name": "Public Works - CIP"
  },
  "government": {
    "code": "toaks",
    "organization": {
      "city": "Thousand Oaks",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/352f546a-849f-4847-a87c-795949695fc2_500x500_CTO_Logo.png",
      "name": "City of Thousand Oaks",
      "phone": "(805)449-2239",
      "state": "CA",
      "website": "https://www.toaks.org/departments/finance/purchasing-bids",
      "zipCode": "91362",
      "address1": "2100 Thousand Oaks Blvd",
      "address2": null,
      "phoneExt": null,
      "timezone": "America/Los_Angeles",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "2021/2022-17",
  "closeOutReason": null,
  "closedSubstatus": "awarded",
  "proposalDeadline": "2022-12-14T23:30:00.000Z",
  "releaseProjectDate": "2022-11-11T21:21:18.809Z"
}