closed🌐 City of New Smyrna Beach15-23-PLAN
15 Home Demolition Rebuild Project
City of New Smyrna Beach / Purchasing
Description
This mitigation reconstruction project encompasses fifteen (15) New Smyrna Beach single-family homes located within Special Flood Hazard Areas (SFHA) classified as Zone “AE”, per FEMA’s Flood Insurance Rate Maps. These homes have experienced structural flooding during October 2016 (Hurricane Matthew), September 2017 (Hurricane Irma), September 2022 (Hurricane Ian) and/or November 2022 (Hurricane Nicole). Due to the vast majority of their finished floor elevations being below the Base Flood Elevation (BFE) established by FEMA, these homes are presently in imminent risk of reoccurring flooding. The Hazard Mitigation Grant Program (HMGP) grant sponsored by the Federal Emergency Management Agency (FEMA) allows for the implementation of long-term hazard mitigation measures after a Presidential major disaster declaration to reduce the loss of life and property due to natural disasters. Following its commitment to serve and protect its residences, the City of New Smyrna Beach has secured federal funds from FEMA’s HMGP program to demolish and rebuild 15 homes at a higher elevation. This will allow for the removal of these homes from harm’s way. The mitigation reconstruction project will protect these homes following the 100-year storm event as they will be rebuilt and elevated between 5.5 ft and 8.0 ft from existing ground. Consequently, as a result of the demolition and reconstruction work, future flood-related damages and flood claims will be reduced and/or eliminated. The City of New Smyrna Beach reserves the right to select one or multiple contractors to provide construction services under this contract. A minimum number of homes to be demolished and reconstructed by a particular contractor is not guaranteed and will depend on the bids received. The bid tabulation has been designed to allow for onsite construction as the primary construction method with an alternate bid option for offsite or prefabricated construction. Means and methods of construction will be determined by each contractor. Note: This project was approved by FEMA for the demolition and reconstruction of 17 homes; however, after detailed coordination with the homeowners, 15 home participants were confirmed by the City. The remaining home candidate has been removed from this mitigation reconstruction project. Therefore, all references to “17 homes” in the grant agreement should be interpreted by the reader to mean “15 homes” instead.
Details?
- Posted
- Apr 5, 2023
- Response deadline
- Jul 10, 2023, 9:00 PM UTC
- Status
- closed
- Buyer
- City of New Smyrna Beach
- Department
- Purchasing
- Jurisdiction
- City of New Smyrna Beach
- Reference #
- 15-23-PLAN
- Summary
- This mitigation reconstruction project encompasses fifteen (15) New Smyrna Beach single-family homes located within Special Flood Hazard Areas (SFHA) classified as Zone “AE”, per FEMA&r
- Government Code
- cityofnsb
- Government Organization City
- New Smyrna Beach
- Government Organization State
- FL
- Government Organization Website
- https://www.cityofnsb.com/
- Government Organization Zip Code
- 32168
- Government Organization Address1
- 210 Sams Avenue
- Government Organization Country Code
- US
- Close Out Reason
- 15-23-PLAN PHASE 2, awarded to Byrdson Services and Paul Culver Construction.
- Closed Substatus
- other
Finding similar opportunities…
This listing is a summary from City of New Smyrna Beach's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.