GovBidAlerts
OpenState

26-21 Gre853129D (Greene)

Agriculture and Land Stewardship

Due Closes in 36 daysRef. 26-21 Gre853129D (Greene)

At a glance

What

Completion Dates: Construction: November 1st, 2027 Seeding: December 15, 2027 (must follow the seeding period) This project is for a traditional breakpoint nutrient reduction wetland.

Where
Iowa (state)
Key dates
  • Posted: Nov 23, 2026
  • Deadline: Wed, Dec 30, 2026 · 3:00 PM CST (closes in 36 days)
How to respond
Documents
None attached here — see the source portal

Description

Completion Dates: Construction: November 1st, 2027 Seeding: December 15, 2027 (must follow the seeding period) This project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure and seeding. This project includes about 62,120 cubic yards of earthwork, installation of 1,044 square feet of steel sheetpile, Aluminum CMP water control structure, 814 linear feet (LF) of tile installation, 57 LF of Aluminum CMP drawdown pipe, 2 Aluminum CMP inlet risers, 618 tons of riprap, 104 cubic yards of concrete grout and 23.1 acres of seeding. The estimated construction cost range for this project is $475,000 to $575,000.
All notice detailsShow ↓
Posted
Nov 23, 2026
Status
open
Jurisdiction
Iowa (state)
Reference #
26-21 Gre853129D (Greene)
Keywords
Wetland
Agency Number
009
Agency Contact Title
Contract Manager

This listing is a summary from Iowa (state)'s open procurement data. The full solicitation documents are on the source portal.