IFBopen🌐 Illinois DOT065-66P69
This project is located on FAP 68 (IL-23) and FAS 370 (Long Point Rd). IL 23 begins at the Vermillion River Bridge_south of Streator to ECL in Cornell. The work consists of HMA milling and resurfacing (SMART overlay), pavement marking, raised reflective markers, and ADA ramps. Long Point Rd begins from IL-23 to Main St in Long Point. The work consists of HMA milling and resurfacing (design overlay), pavment marking, raised reflective markers, and ADA ramps. Approximately 15.58 miles gross length. (Livingston)
Illinois DOT
Description
This project is located on FAP 68 (IL-23) and FAS 370 (Long Point Rd). IL 23 begins at the Vermillion River Bridge_south of Streator to ECL in Cornell. The work consists of HMA milling and resurfacing (SMART overlay), pavement marking, raised reflective markers, and ADA ramps. Long Point Rd begins from IL-23 to Main St in Long Point. The work consists of HMA milling and resurfacing (design overlay), pavment marking, raised reflective markers, and ADA ramps. Approximately 15.58 miles gross length.
Details?
- Response deadline
- Nov 6, 2026, 12:00 PM UTC (28d)
- Type
- IFB
- Status
- Active
- Buyer
- Illinois DOT
- Jurisdiction
- Illinois DOT
- Location
- IL
- Reference #
- 065-66P69
- Has Description
- true
- Bulletin
- This project is located on FAP 68 (IL-23) and FAS 370 (Long Point Rd). IL 23 begins at the Vermillion River Bridge_south of Streator to ECL in Cornell. The work consists of HMA milling and resurfacing
- Counties
- Livingston
Similar open opportunities
See opportunities like this one
GovBidAlerts matches this solicitation to similar open bids across 114,000+ open bids from 2,500+ sources. Create a free account to unlock them.
Create free accountno credit card required
This listing is a summary from Illinois DOT's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.