Illinois DOT government contracts, bids & RFPs
State / local / other government buyer · 143 open bids
Open government contracts, bids and RFPs from Illinois DOT, the vendors it awards most, and the industries it buys — aggregated from public procurement data and updated daily.
Paste your website — we'll show the open government contracts that fit your business.
Free · no signup · we read your homepage once. We don't store your email.
Illinois DOT contract activity
A current snapshot based on 20 of 143 open listings shown on this page. Counts update with the directory.
- Illinois DOT20
Deadline outlook
- Next 30 days
- 20
- Later
- 0
- Open / rolling
- 0
Most represented buyers
- Illinois DOT20
0 of the listings shown were posted in the last 30 days. Illinois DOT contributes the largest share (20). Illinois DOT is the most represented buyer in this snapshot.
Open opportunities
- 1.2 miles of resurfacing on IL 3 from Halifax Drive to 0.2 miles north of Market Street in Waterloo. (Monroe)Illinois DOT
1.2 miles of resurfacing on IL 3 from Halifax Drive to 0.2 miles north of Market Street in Waterloo.
MoreDue Nov 6, 2026Posted — - (1.41-Mile) This project consists of resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. This project is in the villages of Niles and Morton Grove in Cook County. (Cook)Illinois DOT
(1.41-Mile) This project consists of resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. This project is in the villages of Niles and Morton Grove in Cook County.
MoreDue Nov 6, 2026Posted — - Removal and replacement of SN 050-0059 carrying US 52 over Mission Creek located approximately 0.4 miles west of IL 71. Additional work includes milling/resurfacing at roadway approaches, additional shoulders, upgraded guardrails, and improvements to entrances and a sideroad. (LaSalle)Illinois DOT
Removal and replacement of SN 050-0059 carrying US 52 over Mission Creek located approximately 0.4 miles west of IL 71. Additional work includes milling/resurfacing at roadway approaches, additional shoulders, upgraded guardrails, and improvements to entrances and a sideroad.
MoreDue Nov 6, 2026Posted — - Culvert wing wall repairs on SN 009-7000 carrying IL 125 over Lost Creek Tributary, 0.5 miles east of Bluff Springs Road. (Cass)Illinois DOT
Culvert wing wall repairs on SN 009-7000 carrying IL 125 over Lost Creek Tributary, 0.5 miles east of Bluff Springs Road.
MoreDue Nov 6, 2026Posted — - 6 miles of of intermittent resurfacing on IL 84 from City of Hampton's Southern limit to Barber Creek Rd and I-80 rest area. (Rock Island)Illinois DOT
6 miles of of intermittent resurfacing on IL 84 from City of Hampton's Southern limit to Barber Creek Rd and I-80 rest area.
MoreDue Nov 6, 2026Posted — - This Project consists of Removing trees, as well as all incidental and collateral work necessary to complete the project as shown on the plans. This project consists of Tree removal on various State routes within various counties in District One. (Various)Illinois DOT
This Project consists of Removing trees, as well as all incidental and collateral work necessary to complete the project as shown on the plans. This project consists of Tree removal on various State routes within various counties in District One.
MoreDue Nov 6, 2026Posted — - Culvert replacement 0.4 miles west of 780E and 0.4 miles east of Woodhull Rd in Henry County. (Henry)Illinois DOT
Culvert replacement 0.4 miles west of 780E and 0.4 miles east of Woodhull Rd in Henry County.
MoreDue Nov 6, 2026Posted — - Cleaning and painting of structural steel on SN 071-0055 carrying IL 64 over I-39. (Ogle)Illinois DOT
Cleaning and painting of structural steel on SN 071-0055 carrying IL 64 over I-39.
MoreDue Nov 6, 2026Posted — - This is a pavement patching improvement consists of Class B Patching, Crack and Joint sealing, concrete curb and gutter repair, placement of pavement markings and raised reflective pavement markers. This improvement is on various State maintained routes within the Villages of Third Lake, Grayslake, Libertyville, Mundelein, Long Grove, and Buffalo Grove in Lake County. (Lake)Illinois DOT
This is a pavement patching improvement consists of Class B Patching, Crack and Joint sealing, concrete curb and gutter repair, placement of pavement markings and raised reflective pavement markers. This improvement is on various State maintained routes within the Villages of Third Lake, Grayslake, Libertyville, Mundelein, Long Grove, and Buffalo Grove in Lake County.
MoreDue Nov 6, 2026Posted — - Construction of a 5-foot sidewalk along Oak St. from Vine St. to State St. and along State St. from Oak St. to John St. in the village of Teutopolis. (Effingham)Illinois DOT
Construction of a 5-foot sidewalk along Oak St. from Vine St. to State St. and along State St. from Oak St. to John St. in the village of Teutopolis.
MoreDue Nov 6, 2026Posted — - (386-Ft) Bridge Repair project and the work includes bridge deck patching, steel repairs, and miscellaneous bridge repair. Location in the Villages Skokie and Lincolnwood within Cook County. (Cook)Illinois DOT
(386-Ft) Bridge Repair project and the work includes bridge deck patching, steel repairs, and miscellaneous bridge repair. Location in the Villages Skokie and Lincolnwood within Cook County.
MoreDue Nov 6, 2026Posted — - Chemical treatment and video inspection of deep wells at various locations in East St. Louis and Venice. (Madison, St. Clair)Illinois DOT
Chemical treatment and video inspection of deep wells at various locations in East St. Louis and Venice.
MoreDue Nov 6, 2026Posted — - HMA resurfacing of Wells Bypass Rd. from Veterans Memorial Dr. to IL 148 in Jefferson County. Additional work includes HMA shoulders, turn lanes, pavement markings and other required work. (Jefferson)Illinois DOT
HMA resurfacing of Wells Bypass Rd. from Veterans Memorial Dr. to IL 148 in Jefferson County. Additional work includes HMA shoulders, turn lanes, pavement markings and other required work.
MoreDue Nov 6, 2026Posted — - (3.32-Mile) Standard overlay and ADA curb ramp improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement Batching, placement of pavement markings. The project is in the Villages of Broadview, Forest Park, Maywood and Westchester within Cook County. (Cook)Illinois DOT
(3.32-Mile) Standard overlay and ADA curb ramp improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement Batching, placement of pavement markings. The project is in the Villages of Broadview, Forest Park, Maywood and Westchester within Cook County.
MoreDue Nov 6, 2026Posted — - HMA resurfacing of East Market St. from Hickory St. to Dewey St. in the city of Troy. Additional work includes curb and gutter, sidewalks, pavement markings and other required work. (Madison)Illinois DOT
HMA resurfacing of East Market St. from Hickory St. to Dewey St. in the city of Troy. Additional work includes curb and gutter, sidewalks, pavement markings and other required work.
MoreDue Nov 6, 2026Posted — - Repair and maintenance of pump station electrical equipment at various locations in District 8. (Various)Illinois DOT
Repair and maintenance of pump station electrical equipment at various locations in District 8.
MoreDue Nov 6, 2026Posted — - (1.630-Mile) Standard Overlay and Curb Ramps Improvements (ADA Improvements) consists of removal and replacement of existing Hot Mix Asphalt (HMA), pavement patching, Portland Cement Concrete (PCC) overlay, curb and gutter removal and replacement, routing, cleaning, and sealing of longitudinal cracks in existing HMA pavement, thermoplastic pavement markings, pedestrian signals improvements (APS), detector loop replacement, raised reflective pavement markers, sidewalk curb ramps improvement. The improvement is in the City of Waukegan in Lake County. (Lake)Illinois DOT
(1.630-Mile) Standard Overlay and Curb Ramps Improvements (ADA Improvements) consists of removal and replacement of existing Hot Mix Asphalt (HMA), pavement patching, Portland Cement Concrete (PCC) overlay, curb and gutter removal and replacement, routing, cleaning, and sealing of longitudinal cracks in existing HMA pavement, thermoplastic pavement markings, pedestrian signals improvements (APS), detector loop replacement, raised reflective pavement markers, sidewalk curb ramps improvement.…
MoreDue Nov 6, 2026Posted — - (2.3-Mile) pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Glenview and Niles in New Northfield Township in Cook County. (Cook)Illinois DOT
(2.3-Mile) pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Glenview and Niles in New Northfield Township in Cook County.
MoreDue Nov 6, 2026Posted — - (2.75-Mile) Smart Overlay Improvements consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, pedestrian curb ramp improvements. This project is located within the City of Buffalo Grove and Lincolnshire and Riverwoods in Lake County. (Lake)Illinois DOT
(2.75-Mile) Smart Overlay Improvements consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, pedestrian curb ramp improvements. This project is located within the City of Buffalo Grove and Lincolnshire and Riverwoods in Lake County.
MoreDue Nov 6, 2026Posted — - (4,251.83-Ft) The Work consists of culvert replacement, HMA pavement and shoulder reconstruction, HMA resurfacing, storm sewer installation, culvert and wingwall installation. This project is in the Village of Winnetka, Cook County. (Cook)Illinois DOT
(4,251.83-Ft) The Work consists of culvert replacement, HMA pavement and shoulder reconstruction, HMA resurfacing, storm sewer installation, culvert and wingwall installation. This project is in the Village of Winnetka, Cook County.
MoreDue Nov 6, 2026Posted —
Showing 20 of 143 open bids.
How to win Illinois DOT contracts
- Register as a vendor on Illinois DOT's procurement portal.
- Match your NAICS / commodity codes to what it buys (see the top codes above).
- Ask about local small-business and vendor-preference programs — see set-asides explained.
- Monitor its open bids above, or set a GovBidAlerts alert.
New to government contracting? Start with our GovCon guides and glossary.