GovBidAlerts
← My Opportunities
closed🌐 pinellasfl26-0203-ITB-C

STAR Center Bldg. 100 Switchgear Trip Unit Replacement and Circuit Breaker Reconditioning Rebid

pinellasfl / ECONOMIC DEVELOPMENT

Description

Pinellas County STAR Center seeks to obtain the services of a contractor to perform upgrading BBC Metalclad LV (480 Volt) Switchgear Trip unit upgrade only or reconditioning the circuit breakers and upgrading the trip units at two electrical switchgear rooms at the Young-Rainey STAR Center, Bldg 100. All repairs and adjustments must be made per manufacturer specifications. The original BBC/ABB switchgear was installed in 1986/87. Services shall include replacing trip units or replacing trip units and reconditioning low voltage metal clad circuit breakers. Also, provide testing reports for trip controllers and reconditioned breakers.

Details

Posted
Dec 23, 2025
Response deadline
Jan 8, 2026, 8:00 PM UTC
Status
closed
Buyer
pinellasfl
Department
ECONOMIC DEVELOPMENT
Jurisdiction
pinellasfl
Reference #
26-0203-ITB-C
Summary
<p><span style="font-size: 10.0pt; line-height: 107%;">Pinellas County STAR Center seeks to obtain the services of a contractor to perform upgrading BBC Metalclad LV (480 Volt) Switchgear Trip unit up
Is Paused
false
Template Title
Construction - ITB V2
Copy Count
0
Government Organization City
Clearwater
Government Organization Name
Pinellas County
Government Organization State
FL
Government Organization Website
http://www.pinellascounty.org/
Government Organization Zip Code
33765
Government Organization Address1
Pinellas County Courthouse Annex Bldg., Sixth Floor
Government Organization Address2
400 S. Ft. Harrison Ave.
Government Organization Timezone
America/New_York
Government Organization Country Code
US
Government Organization Phone Country
1
Close Out Reason
Step 2
Closed Substatus
other

Contact

(727)464-3311
Finding similar opportunities…

This listing is a summary from pinellasfl's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 224344,
  "_slug": "pinellasfl",
  "title": "STAR Center Bldg. 100 Switchgear Trip Unit Replacement and Circuit Breaker Reconditioning Rebid",
  "status": "closed",
  "summary": "<p><span style=\"font-size: 10.0pt; line-height: 107%;\">Pinellas County STAR Center seeks to obtain the services of a contractor to perform upgrading BBC Metalclad LV (480 Volt) Switchgear Trip unit upgrade only or reconditioning the circuit breakers and upgrading the trip units at two electrical switchgear rooms at the Young-Rainey STAR Center, Bldg 100. &nbsp;All repairs and adjustments must be made per manufacturer specifications. The original BBC/ABB switchgear was installed in 1986/87. Services shall include replacing trip units or replacing trip units and reconditioning low voltage metal clad circuit breakers. Also, provide testing reports for trip controllers and reconditioned breakers. </span></p>",
  "isPaused": false,
  "template": {
    "title": "Construction - ITB V2"
  },
  "addendums": [],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2025-12-19T19:55:57.712Z",
  "department": {
    "id": 2029,
    "name": "ECONOMIC DEVELOPMENT"
  },
  "government": {
    "code": "pinellasfl",
    "organization": {
      "city": "Clearwater",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/8fdb5763-d79b-4f9c-a0d9-f0650eaa84b8_PUR_Cnty_logo_RGB.png",
      "name": "Pinellas County",
      "phone": "(727)464-3311",
      "state": "FL",
      "website": "http://www.pinellascounty.org/",
      "zipCode": "33765",
      "address1": "Pinellas County Courthouse Annex Bldg., Sixth Floor",
      "address2": "400 S. Ft. Harrison Ave.",
      "phoneExt": null,
      "timezone": "America/New_York",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "26-0203-ITB-C",
  "closeOutReason": "Step 2",
  "closedSubstatus": "other",
  "proposalDeadline": "2026-01-08T20:00:12.783Z",
  "releaseProjectDate": "2025-12-23T14:12:20.832Z"
}