closed🌐 cityoflilburnRFP 2025--01
Design, Permitting and Bid Support for Camp Creek Streambank Stabilization
cityoflilburn / Public Works
Description
The City of Lilburn seeks to implement green infrastructure improvements within Lilburn City Park to stabilize a section of Camp Creek, a critical segment within the headwaters of the Yellow River, part of the Ocmulgee Watershed. The project aims to address ongoing environmental degradation documented in a 2022 Streambank Assessment and Preliminary Plan, by applying bio-engineered stabilization techniques to approximately 890 linear feet of impacted stream channel and its associated 50-foot riparian stream buffers. These improvements will mitigate flooding, sedimentation, and erosion along this highly visible corridor situated between the CSX Transportation railroad and the Camp Creek Greenway Spur Trail bridge.
Details?
- Posted
- Oct 6, 2025
- Response deadline
- Dec 9, 2025, 7:00 PM UTC
- Status
- closed
- Buyer
- cityoflilburn
- Department
- Public Works
- Jurisdiction
- cityoflilburn
- Reference #
- RFP 2025--01
- Summary
- <p><span xml:lang="EN-US" data-contrast="none">The City of Lilburn seeks to implement green infrastructure improvements within Lilburn City Park to stabilize a section of Camp Creek, a critical segmen
- Is Paused
- false
- Template Title
- Request for Proposals
- Copy Count
- 0
- Government Organization City
- Lilburn
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/affefb67-ecae-4f1b-9bbd-f054b728832b_Document_(1).png
- Government Organization Name
- City of Lilburn, GA
- Government Organization State
- GA
- Government Organization Website
- https://www.cityoflilburn.com/
- Government Organization Zip Code
- 30047
- Government Organization Address1
- 340 Main Street
- Government Organization Timezone
- America/New_York
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Close Out Reason
- Lowest responsive and responsible proposal exceeded the funding currently available for this project
- Closed Substatus
- canceled
Contact
(770)921-2210
Finding similar opportunities…
This listing is a summary from cityoflilburn's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 191947,
"_slug": "cityoflilburn",
"title": "Design, Permitting and Bid Support for Camp Creek Streambank Stabilization",
"status": "closed",
"summary": "<p><span xml:lang=\"EN-US\" data-contrast=\"none\">The City of Lilburn seeks to implement green infrastructure improvements within Lilburn City Park to stabilize a section of Camp Creek, a critical segment within the headwaters of the Yellow River, part of the Ocmulgee Watershed. The project aims to address ongoing environmental degradation documented in a 2022 Streambank Assessment and Preliminary Plan, by applying bio-engineered stabilization techniques to approximately 890 linear feet of impacted stream channel and its associated 50-foot riparian stream buffers. These improvements will mitigate flooding, sedimentation, and erosion along this highly visible corridor situated between the CSX Transportation railroad and the Camp Creek Greenway Spur Trail bridge.</span><span data-ccp-props=\"{}\"> </span></p>",
"isPaused": false,
"template": {
"title": "Request for Proposals"
},
"addendums": [
{
"id": 94092
},
{
"id": 92861
},
{
"id": 91105
},
{
"id": 91683
}
],
"copyCount": 0,
"isPrivate": false,
"comingSoon": false,
"created_at": "2025-08-15T15:31:31.564Z",
"department": {
"id": 13593,
"name": "Public Works"
},
"government": {
"code": "cityoflilburn",
"organization": {
"city": "Lilburn",
"logo": "https://assets.procurement.opengov.com/logo-uploads/affefb67-ecae-4f1b-9bbd-f054b728832b_Document_(1).png",
"name": "City of Lilburn, GA",
"phone": "(770)921-2210",
"state": "GA",
"website": "https://www.cityoflilburn.com/",
"zipCode": "30047",
"address1": "340 Main Street",
"address2": null,
"phoneExt": null,
"timezone": "America/New_York",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "RFP 2025--01",
"closeOutReason": "Lowest responsive and responsible proposal exceeded the funding currently available for this project",
"closedSubstatus": "canceled",
"proposalDeadline": "2025-12-09T19:00:52.707Z",
"releaseProjectDate": "2025-10-06T15:57:53.260Z"
}