Combined Synopsis/SolicitationActiveW911YN26QA011
Metric Tool Kits GMTK
DEPT OF DEFENSE / DEPT OF THE ARMY / W7M2 USPFO ACTIVITY FL ARNGKey dates?
- Posted?
- Jun 16, 2026
- Response deadline?
- Jun 25, 2026, 2:00 PM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- Total Small Business Set-Aside (FAR 19.5)
- Set-aside code?
- SBA
- PSC?
- 5180
NAICS?
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE ARMY
- Office?
- W7M2 USPFO ACTIVITY FL ARNG
- Office code?
- 021.2100.NGB.JFHQ USPFO FL.USPFO FL PROC.W911YN
- Organization type?
- OFFICE
- Office address?
- ST AUGUSTINE, FL, 32085-1008, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Starke
- State?
- Florida
- Zip?
- —
- Country?
- UNITED STATES
Contacts?
- Darrin Weaverprimary
- Matt Michaelsecondary
Description?
** update 01 KIT PEOAVN-B01-METRIC some items that has been discontinued with replacements are below. These or equivalent items IAW BAA are acceptable, manufacture non specific pre-assembled in tool box foam optional STP 1206MA: The replacement is STP 1206MBA STP 712: The replacement is STP 712B CHH 1098B: The replacement is CHH 41857 STP 2306: The replacement is STP 2306D STP SF10T: The replacement is LIXIE 100H QUA 312PB4X-ACR-KPR: The replacement is QUA 312PB4X-CR QUA 312SB7X-KPR: The replacement is QUA 312SB7X STP 4759G: The replacement is STP 4759 STP 4761G: The replacement is STP 4761 STP 4766G: The replacement is STP 4766 KAS ROW-BIT0810: The replacement is STP 1181-A PEL 2400NVG: The replacement is STR 68344 Small Business Set-Aside: 100% NAICS Code: 333517; Applicable Size Standard is 500 Product or Service Code (PSC): 5180 Brief description: This office has a requirement for six (6) metric General Mechanic Tool Kits (GMTK) to support the Army's fleet helicopters. The 6 Metric Tool Kits requested will have a sufficient amount of tools to allow mechanics to operate on multiple aircraft at the same time and in multiple locations. These kits also contain tools that will allow the mechanics to complete phase level maintenance for future operations, especially when there is high OPTEMPO during border missions. See attached component list for a GMTK requirement. Foam shadowing is required for tool inventory purposes. Etching is not required. The offered products must be in compliance with the Buy American Act. Electronic submmison of quotes via Email to POCs below is authorized Doug Divine: douglas.d.divine.civ@army.mil Darrin Weaver: darrin.j.weaver.mil@army.mil Matt Michael: matthew.j.michael2.civ@army.mil
Attachments (2)?
Other notices in this solicitation?
Similar open contracts
Metadata?
- Notice ID?
- fac954e055084d339b5df85a2d646d54
- Full path?
- DEPT OF DEFENSE.DEPT OF THE ARMY.W7M2 USPFO ACTIVITY FL ARNG
- Office code?
- 021.2100.NGB.JFHQ USPFO FL.USPFO FL PROC.W911YN
- Ingested?
- Jun 17, 2026
- Updated?
- Jul 1, 2026