GovBidAlerts
← All opportunities

FY26 507 ARW Upgrade existing CCTV system, Bldg 1066

Key dates

Posted
May 13, 2026
Response deadline
Archive date
Archive type
auto30

Classification

Notice type
Justification
Base type
Justification
Set-aside
Set-aside code
PSC
6350

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Office
FA8136 AFSC PZIOB
Office code
057.5700.AFMC.AFSC.FA8136
Organization type
OFFICE
Office address
TINKER AFB, OK, 73145-9125, USA

Place of performance

Street
Street 2
City
Tinker AFB
State
Oklahoma
Zip
Country
UNITED STATES

Contacts

Description

Upgrade to existing video surveillance CCTV system on the 507th Air Refueling Wing's campus to support the Command Post (CP) in bldg 1066. Current surveillance equipment and software has reached end of life. The lack of adequate video surveillance for the 507th ARW hinders situational awareness for the Commander, does not provide safety of both Air Forces assets and personnel, and prevents security of assets. The Command Post requires the ability to monitor assets and provide security for personnel. The product and services acquired from this effort will support the 507th ARW CP's mandated requirement for closed circuit viewing of the facility, the flight line, and the alert ramps supporting multiple MAJCOM missions of aircraft assigned to the 507 ARW on Tinker AFB. The specific software for the security surveillance system is proprietary and solicitation from another security service provider will incur significant cost increases due to having to replace the entire camera system and infrastructure used by Digi Security Services on Tinker. The system configuration, architecture, and deployment design are proprietary to DIGI. The software is maintained by Motorola and they assign dealer licenses to integrators. DIGI is the only authorized integrator to provide support to the existing system. A new provider would not have access to the current licensed environment and would require full system reconfiguration and redeployment. The camera system operates on Tinker AFB network and was cleared by all applicable Air Force Information Technology entities for use. The initial approval timeline for the original installation took approximately 60 months to clear all security approvals.

Attachments (1)

Award

Number
FA813626P0007
Amount
Date
Awardee
UEI
Awardee address

Similar open contracts

Metadata

Notice ID
f1f447eb6f2a40c694c275565f39635b
Full path
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA8136 AFSC PZIOB
Office code
057.5700.AFMC.AFSC.FA8136
Ingested
May 14, 2026
Updated
Jun 12, 2026