This notice has been superseded. See the latest notice: GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF (Combined Synopsis/Solicitation)
Combined Synopsis/SolicitationActive1240BH26R0013
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA FOREST SERVICEKey dates?
- Posted?
- Sep 17, 2026
- Response deadline?
- Sep 30, 2026, 9:00 PM UTC
- Archive date?
- Oct 15, 2026
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- Small Business Set Aside - Total
- Set-aside code?
- SBA
- PSC?
- Z2PZ
NAICS?
Issuing office?
- Department?
- AGRICULTURE, DEPARTMENT OF
- Sub-tier?
- FOREST SERVICE
- Office?
- USDA FOREST SERVICE
- Office code?
- 012.12C2.123187
- Organization type?
- OFFICE
- Office address?
- WASHINGTON, DC, 20250, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Fifty Six
- State?
- Arkansas
- Zip?
- 72533
- Country?
- UNITED STATES
Contacts?
- James Edingtonprimary
Description?
On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013. 2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013. This amendment must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.” This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.
Attachments (17)?
- Download📎 C05a+RFI+QA+1240BH26R0013.docxapplication/octet-stream · 29 KB
- Download📎 C04h+Attachment+8+Estim+Quant+1240BH26R0013.xlsxapplication/octet-stream · 33 KB
- Download📎 C05m+Attachment+11+Golder+1240BH26R0013.pdfapplication/pdf · 980 KB
- Download📎 C04c+Attachment+3+Drawings+BSC+1240BH26R0013.pdfapplication/pdf · 3.9 MB
- Download📎 C04g+Attachment+7+Recommendations1240BH26R0013.pdfapplication/pdf · 3.9 MB
- Download📎 C04k+Attachment+11+General+Decisio+AR20260022+05182026.pdfapplication/pdf · 1.5 MB
- Download📎 C04f+Attachment+6+SOI+1240BH26R0013.xlsxapplication/octet-stream · 13 KB
- Download📎 C05b+Site+Visit+1240BH26R0013.pdfapplication/pdf · 1.5 MB
- Download📎 C05+F30+1240BH26R0013-0002.pdfapplication/pdf · 104 KB
- Download📎 C04b+Attachment+2++Specs+BSC+LH+1240BH26R0013.pdfapplication/pdf · 1.2 MB
- Download📎 C04a+Attachment+1+SOW+BSC+1240BH26R0013.docxapplication/octet-stream · 73 KB
- Download📎 C04j+Attachment+10+RFI+Form+1240BH26R0013.docxapplication/octet-stream · 29 KB
- Download📎 C04i+Attachment+9+Site+Visit+1240BH26R0013.docxapplication/octet-stream · 125 KB
- Download📎 C05+SF30+1240BH26R0013-0001.pdfapplication/pdf · 84 KB
- Download📎 C04+SF1442+1240BH26R0013.pdfapplication/pdf · 321 KB
- Download📎 C04e+Attachment+5+Env+Assessment+1240BH26R0013.pdfapplication/pdf · 7.8 MB
- Download📎 C04d+Attachment+4+Dwgs+BSC+Handrails+1240BH26R0013.pdfapplication/pdf · 85.9 MB
Other notices in this solicitation?
- Combined Synopsis/SolicitationGAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NFSep 30, 2026LATEST
- Combined Synopsis/SolicitationGAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NFAug 12, 2026
- Combined Synopsis/SolicitationGAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NFAug 4, 2026
Similar open contracts
Metadata?
- Notice ID?
- f1be61ee46c841319b7de58af19ea744
- Full path?
- AGRICULTURE, DEPARTMENT OF.FOREST SERVICE.USDA FOREST SERVICE
- Office code?
- 012.12C2.123187
- Ingested?
- Sep 18, 2026
- Updated?
- Sep 29, 2026