56 CS FOC to Flightline and Wx Equipment, Luke AFB
Department of Defense · Department of the Air Force
Due Closes in 11 daysRef. F3YCFA6173AC01
At a glance
- What
FINAL EXTENSION: Proposals are due no later than 30 November at 1300.
Industry: Fiber Optic Cable Manufacturing (NAICS 335921)
- Who can bid
- WOSB set-aside
- Where
- Luke Air Force Base, AZ
- Key dates
- Posted: Nov 17, 2026
- Deadline: Mon, Nov 30, 2026 · 2:00 PM MST (closes in 11 days)
- How to respond
Rachel Tilley · rachel.tilley.1@us.af.mil
Submit per the instructions on SAM.gov ↗
- Documents
- 10 attachments ↓
Description
FINAL EXTENSION: Proposals are due no later than 30 November at 1300. NO ADDITIONAL EXTENSIONS WILL BE PROVIDED. Responses to Site Visit Q&A will be posted by 13 November 2026 at 1300 Arizona Time. The Government intends to hold a site visit for subject requirement on 4 November 2026 at 0900 AM. Below you will find the instructions and required documents to attend. Only SBA Certified Women Owned Small-Businesses are eligible for this requirement. **THIS IS THE ONLY DATE AND TIME FOR THE SITE VISIT, REQUESTS TO MAKE ANY CHANGES WILL BE DENIED** Attendance will be limited to 2 representatives for each contractor. To attend please provide the attached template (Site Visit Base Access_Template) completed with the below information, to rachel.tilley.1@us.af.mil, no later than 26 October 2026 at 1500 Arizona Time.
Read more ↓Show less ↑
Required Info: Last Name, First Name, DOB, US Citizen, License or ID#, State of Issue, Last 4 SSN To access the installation, the attendee will be required to have a REAL ID or Government Issued Passport. When submitting the above information, please include a copy of the form of ID to allow for Security Forces to verify if it meets the requirements. **QUESTIONS ARE DUE NO LATER THAN COB 22 OCTOBER 2026 at 1500 AZ time** ***FINALIZED Q&A Document will be posted with answers no later than 26 October 2026*** This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment. See attached Solicitation and supporting documents for additional information.
Documents (10)
- Download📎 Solicitation+Amendment+FA488727Q00030002+SF+30.pdfapplication/pdf · 395 KB
- Download📎 Contractor+Access+to+Department+of+the+Air+Force+Installations.pdfapplication/pdf · 124 KB
- Download📎 Anti-Terrorism+Pamphlet.pdfapplication/pdf · 851 KB
- Download📎 Site+Visit+Base+Access_Template.xlsxapplication/octet-stream · 23 KB
- Download📎 SOW-FOC+to+Flightline+and+Weather+Related+%28Wx%29+Equipment+-+Corrected+Table.pdfapplication/pdf · 5.3 MB
- Download📎 Solicitation+-+FA488727Q0003.pdfapplication/pdf · 533 KB
- Download📎 Site+Visit+QA_FINAL+Consolidated+Responses.pdfapplication/pdf · 302 KB
- Download📎 Ombudsman.pdfapplication/pdf · 56 KB
- Download📎 Luke+AFB+Environmental+Guide+for+Contractors.pdfapplication/pdf · 7.4 MB
- Download📎 Solicitation+QA+-+56+CS+Responses-final.pdfapplication/pdf · 108 KB
Other notices in this solicitation
- Combined Synopsis/Solicitation56 CS FOC to Flightline and Wx Equipment, Luke AFBNov 9, 2026
- Combined Synopsis/Solicitation56 CS FOC to Flightline and Wx Equipment, Luke AFBNov 4, 2026
- Combined Synopsis/Solicitation56 CS FOC to Flightline and Wx Equipment, Luke AFBOct 28, 2026
- Combined Synopsis/Solicitation56 CS FOC to Flightline and Wx Equipment, Luke AFBOct 21, 2026
- Combined Synopsis/Solicitation56 CS FOC to Flightline and Wx Equipment, Luke AFBOct 19, 2026
- Combined Synopsis/Solicitation56 CS FOC to Flightline and Wx Equipment, Luke AFBOct 15, 2026
- Combined Synopsis/Solicitation56 CS FOC to Flightline and Wx Equipment, Luke AFBOct 13, 2026
- Combined Synopsis/Solicitation56 CS FOC to Flightline and Wx Equipment, Luke AFBOct 8, 2026
- Combined Synopsis/Solicitation56 CS FOC to Flightline and Wx Equipment, Luke AFBOct 7, 2026
All notice detailsShow ↓
- Solicitation number
- F3YCFA6173AC01
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
- Product/service code (PSC)
- 6145
- Department
- Department of Defense
- Sub-agency
- Department of the Air Force
- Contracting office
- FA4887 56 CONS CC
- Office location
- LUKE AFB, AZ, 85309-1217
- Place of performance
- Luke Air Force Base, Arizona, 85309, UNITED STATES
- Archive date
- Dec 15, 2026
- Archive type
- auto15
- Set-aside code
- WOSB
- Office code
- 057.5700.ACC.FA4887
- Organization type
- OFFICE
- Full agency path
- DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA4887 56 CONS CC
- SAM.gov notice ID
- ea02e95a11d546e3809c4db8911dca72
Industry (NAICS)
Contacts
- Rachel Tilley · primaryrachel.tilley.1@us.af.mil(awards)
- Jacqueline C. Aranda · secondaryjacqueline.aranda.1@us.af.mil(awards)
Closes in 11 days🔔 Get alerts for bids like this