OpenSolicitationFederal
Pip-II F-37 Building LWC Pump Room Piping System Installation
Department of Energy · Department of Energy
Due Closes in 15 daysRef. 378854_MR
At a glance
- What
This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room.
Industry: Plumbing, Heating, and Air-Conditioning Contractors (NAICS 23822)
- Who can bid
- Any business — no set-aside listed
- Where
- Batavia, IL
- Key dates
- Posted: Nov 16, 2026
- Deadline: Thu, Dec 3, 2026 · 2:00 PM CST (closes in 15 days)
- How to respond
Michele Reynolds · micheler@fnal.gov · 6308402448
Submit per the instructions on SAM.gov ↗
- Documents
- 35 attachments ↓
Description
This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room. PLEASE NOTE the important information related to this RFP: Pre-Proposal Meeting and Site Visit: October 27, 10:00a CDT Last Day for Questions: November 5, 2026, 4:00p CDT PROPOSALS DUE: December 3, 2026, 2:00p CDT To attend the Pre-Proposal Meeting and Site Visit, PPE is required. As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN (7) DAYS IN ADVANCE OF THE MEETING. AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE. Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID.
Read more ↓Show less ↑
Please note that when entering Fermilab: All vehicles are subject to search No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site. No explosives or any other apparatus or material hazardous to the public or property are allowed on site. No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable. No personal alcohol or marijuana No Smoking or vaping within buildings and within 15-25 feet of entrances Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.
Documents (35)
- Download📎 Addenda_2.pdfapplication/pdf · 164 KB
- Download📎 HX+drawing+for+F37.pdfapplication/pdf · 426 KB
- Download📎 EXHIBIT_18_Injury_Illness_Questionaire.pdfapplication/pdf · 113 KB
- Download📎 EXHIBIT_14_Proposal+Certifications.pdfapplication/pdf · 406 KB
- Download📎 EXHIBIT_7_ADDENDUM+TO+FESHM.pdfapplication/pdf · 174 KB
- Download📎 F10170043-B-ALL+SHEETS+11-13-26.pdfapplication/pdf · 14.0 MB
- Download📎 EXHIBIT_9_010010+General+Requirements.pdfapplication/pdf · 337 KB
- Download📎 378854_MR.pdfapplication/pdf · 323 KB
- Download📎 EXHIBIT_20_SF1413-23a.pdfapplication/pdf · 189 KB
- Download📎 EXHIBIT_24_Sample+Subcontract.pdfapplication/pdf · 209 KB
- Download📎 EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdfapplication/pdf · 343 KB
- Download📎 EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdfapplication/pdf · 320 KB
- Download📎 EXHIBIT_13_CESHC.pdfapplication/pdf · 428 KB
- Download📎 EXHIBIT_6_5031_1+Piping+Systems+March+2025.pdfapplication/pdf · 1.5 MB
- Download📎 PIP-II+Pipe+Support+Analysis+and+Design+Deliverable+PO+683434.pdfapplication/pdf · 4.2 MB
- Download📎 EXHIBIT_15_SARC.pdfapplication/pdf · 471 KB
- Download📎 PIP-II+F37+Pump+Room+Concrete+Pad+Specification.pdfapplication/pdf · 56 KB
- Download📎 EXHIBIT_3_ED0042584_PIP-II_Low_Conductivity_Water_LCW_System_Instrumentation_Specification.pdfapplication/pdf · 194 KB
- Download📎 Flowserve+pump+data+proposed.pdfapplication/pdf · 1.3 MB
- Download📎 EXHIBIT_5_F37_LCW_Electrical_Statement_of_Work_and_prints_rev_A.pdfapplication/pdf · 754 KB
- Download📎 EXHIBIT_19_General_Decision_Number_IL20260008_05_18_2026.pdfapplication/pdf · 889 KB
- Download📎 EXHIBIT_12_014100+Quality+Requirements.pdfapplication/pdf · 166 KB
- Download📎 EXHIBIT_10_013100+ESH+Requirements.pdfapplication/pdf · 919 KB
- Download📎 Addenda_4.pdfapplication/pdf · 136 KB
- Download📎 EXHIBIT_8_FESHM+5034+Pressure+Testing.pdfapplication/pdf · 512 KB
- Download📎 Addenda_3.pdfapplication/pdf · 139 KB
- Download📎 Addenda_1.pdfapplication/pdf · 163 KB
- Download📎 EXHIBIT_16__2025_Construction_Insurance_Requirements.pdfapplication/pdf · 234 KB
- Download📎 EXHIBIT_23_Performance+Bond.pdfapplication/pdf · 102 KB
- Download📎 EXHIBIT_22_Payment+Bond.pdfapplication/pdf · 115 KB
- Download📎 F10151066-D-F37+LCW+PUMPROOM+PID.pdfapplication/pdf · 3.6 MB
- Download📎 EXHIBIT_25_Drawings.zipapplication/octet-stream · 17.1 MB
- Download📎 EXHIBIT_21_Bid_Bond.pdfapplication/pdf · 115 KB
- Download📎 EXHIBIT_17_FL-55.pdfapplication/pdf · 392 KB
- Download📎 EXHIBIT_11_013300+Submittals.pdfapplication/pdf · 146 KB
Other notices in this solicitation
- SolicitationPip-II F-37 Building LWC Pump Room Piping System InstallationNov 12, 2026Latest
- SolicitationPip-II F-37 Building LWC Pump Room Piping System InstallationNov 3, 2026Latest
- SolicitationPip-II F-37 Building LWC Pump Room Piping System InstallationNov 2, 2026
- SolicitationPip-II F-37 Building LWC Pump Room Piping System InstallationOct 8, 2026
All notice detailsShow ↓
- Solicitation number
- 378854_MR
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- Product/service code (PSC)
- K056
- Department
- Department of Energy
- Sub-agency
- Department of Energy
- Contracting office
- FERMILAB - DOE CONTRACTOR
- Office location
- Batavia, IL, 60510
- Place of performance
- Batavia, Illinois, 60510, UNITED STATES
- Archive date
- Dec 18, 2026
Industry (NAICS)
- 23822Plumbing, Heating, and Air-Conditioning Contractors
Contacts
- Michele Reynolds · primarymicheler@fnal.gov(awards)6308402448
Closes in 15 days🔔 Get alerts for bids like this