Deer Island Ecosystem Restoration, Phase 1 Deer Island, MS (Harrison County)

Key dates

Posted
May 22, 2026
Response deadline
Jul 7, 2026, 7:00 PM UTC
Archive date
Jul 22, 2026
Archive type
auto15

Classification

Notice type
Solicitation
Base type
Presolicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Set-aside code
SBA
PSC
Y1PZ

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W074 ENDIST MOBILE
Office code
021.2100.USACE.SAD.SAM.W91278
Organization type
OFFICE
Office address
MOBILE, AL, 36602-3630, USA

Place of performance

Street
Street 2
City
Biloxi
State
Mississippi
Zip
Country
UNITED STATES

Contacts

Description

Phase 1 Breakwater. This contract involves constructing the initial phase for the restoration of Deer Island, specifically restoring the extension of the rock breakwater structure known as Katrina Key, approximately 12,000 feet, to soften the effects of normal wave erosion. This restoration includes placement of armor layer stone or bioengineered reef as the breakwater and associated geocomposite placement to return Katrina Key to near historical 1850’s dimensions. Offerors are hereby advised that all references to the FAR and DFARS within this solicitation pertain to the new Revolutionary FAR Overhaul (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide). While much of the verbiage has remained consistent with the previous version of the FAR and DFARS, there are notable differences. It is incumbent upon the contractor to be fully aware of these changes and ensure their proposal complies accordingly. Furthermore, this solicitation includes specific cybersecurity requirements. The scope of work requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI). Consequently, the contractor and/or subcontractor(s) must comply with Cybersecurity Maturity Model Certification (CMMC) requirements. The Contractor shall have and maintain for the duration of this contract, order, or agreement a current CMMC status at the following CMMC level, or higher: CMMC Level 1 (Self) for all information systems used in performance of the contract, task order, or delivery order that process, store, or transmit FCI or CUI. For complete details, see DFARS 252.204-7021, "Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements," which outlines the definitions, requirements, reporting, and subcontract information for this contract/order/agreement. NOTE: Phased implementation of CMMC is expected as follows: From 10 Nov 2025 through 9 Nov 2026: CMMC Levels 1 and 2 (Self Assessments) may be required in solicitations. From 10 Nov 2026 through 9 Nov 2027: Levels 1 and 2 (Self and C3PAO) may be required. From 10 Nov 2027 through 9 Nov 2028: Any CMMC Level may be required in solicitations if the Project Manager (PM) / Requiring Activity (RA) has provided a CMMC level for the specific requirement. Prior to 10 Nov 2028, the PM/RA has sole discretion to determine if CMMC will be applied to a contract requiring the use of information systems for FCI/CUI. However, beginning 10 Nov 2028, the clause will be prescribed for use if PMs/RAs determine that the contractor will be required to use contractor information systems in the performance of the contract, task order, or delivery order to process, store, or transmit FCI or CUI, excluding awards solely for the acquisition of COTS items.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
dfb0cbbf7283407c88087025c197ac82
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W074 ENDIST MOBILE
Office code
021.2100.USACE.SAD.SAM.W91278
Ingested
May 23, 2026
Updated
Jul 25, 2026