6110--689-26-3-4807-0126: Replace Variable Frequency Drive Units (VA-26-00053945)

Key dates

Posted
Jun 16, 2026
Response deadline
Jun 23, 2026, 2:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Combined Synopsis/Solicitation
Base type
Combined Synopsis/Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Set-aside code
SDVOSBC
PSC
6110

NAICS

Issuing office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
241-NETWORK CONTRACT OFFICE 01 (36C241)
Office code
036.3600.36C241
Organization type
OFFICE
Office address
TOGUS, ME, 04330, USA

Place of performance

Street
VA Connecticut Healthcare System West Haven VA Medical Center 950 Campbell Avenue
Street 2
950 Campbell Avenue
City
West Haven
State
CT
Zip
06516
Country

Contacts

Description

Amendment No.: 0002 Solicitation No.: 36C24126Q0551 Date: June 16, 2026 Purpose of Amendment The purpose of this amendment is to provide responses to questions submitted regarding the solicitation. As a result of these questions and responses, the response due date will be extended to June 23, 2026 at 10am. Question: Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: If no to the question above, will the SSHO need to be full-time for this project? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: If no to the question above, will the QA/QC need to be full time for this project? Answer: Personnel performing startup of equipment should be those with the qualifications necessary to the specific equipment. Please submit appropriate installation report(s) as required along with equipment warranties. Question: Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Please confirm if tax should be included in our proposal? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Advise what is the ICRA Level required for the areas of the VFDs. Answer: This question has been addressed previously. The contractor is responsible for determining any applicable tax obligations, incorporating into proposals as necessary. The VA cannot provide tax advice or make tax determinations on behalf of the contractor. Question: Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? Answer: The VFD's are in multiple mechanical spaces throughout the facility. There's no single ICRA level that applies to all locations. The Contractor shall coordinate with the government prior to commencing work in each area as the ICRA requirements will be determined based on the specific location, adjacent patient care activities, and scope of work. Question: Confirm project work hours. Can work be completed during normal work hours? Answer: The acceptability of temporary containment systems. Cannot be determined generically for this project. Requirements will vary based on specific work location activities and ICRA requirements. Question: Will shutdowns be required to be done during off hours or weekends? Answer: Normal business hours no off time schedule is required. Question: Description of Services line 4 states to coordinate with FMS for BMS controls connections to VFDs. Advise if BMS controls connections, programming setup, and integration to BMS are by the VA. Is the contractor to only coordinate schedule and activities? Answer: Connection is to be made by contractor. Programming setup, and integration to BMS are by the VA.  The contractor to only coordinate schedule and activities with VA.

Attachments (3)

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
d9ccbd384e1543fda50bca2113b5eb9c
Full path
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.241-NETWORK CONTRACT OFFICE 01 (36C241)
Office code
036.3600.36C241
Ingested
Jun 17, 2026
Updated
Jul 9, 2026