SolicitationActiveW912EK26BA016
CONSTRUCT TOC PAD - ARLINGTON HEIGHTS IL - Solicitation
DEPT OF DEFENSE / DEPT OF THE ARMY / W07V ENDIST ROCK ISLANDKey dates?
- Posted?
- Sep 10, 2026
- Response deadline?
- Sep 9, 2026, 4:00 PM UTC
- Archive date?
- Dec 31, 2026
- Archive type?
- autocustom
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- 8(a) Set-Aside (FAR 19.8)
- Set-aside code?
- 8A
- PSC?
- Y1QA
NAICS?
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE ARMY
- Office?
- W07V ENDIST ROCK ISLAND
- Office code?
- 021.2100.USACE.MVD.MVR.W912EK
- Organization type?
- OFFICE
- Office address?
- ROCK ISLAND, IL, 61299-5001, USA
Place of performance?
- Street?
- 1515 Central Rd, Arlington Heights, IL
- Street 2?
- —
- City?
- Arlington Heights
- State?
- Illinois
- Zip?
- 60005
- Country?
- UNITED STATES
Contacts?
- Jocelyn Rainprimary
- Nicholas Mooresecondary
Description?
09/09/2026 The bids were opened and read timely for this IFB today. The verified signed Bid Abstract is available below in the downloads section. 9/2/2026 Subject IFB is amended. All bidder inquiries received timely have been answered in ProjNet as described in MVR.02 QUESTION AND ANSWER VIA PROJNET paragraph of SF 1442. NO CHANGE TO DUE DATE and TIME for bid submission. See attached amendment (SF 30) and revised specifications (it is just a single PDF with both). The original IFB (SF 1442) and its attachments are still located in the original notice use link near bottom left of PIEE Solicitation module page to open that original notice and see those files. USACE - Rock Island District has a requirement to Construct a Tactical Operation Center (TOC) Pad at 88th USARC in Arlington Heights, IL. This is a competitive 8(a) set aside Invitation for Bid. Please download all three files to complete your solicitation package prior to reviewing and submitting bids for this. All bids MUST BE SUBMITTED in PIEE. This requires a PIEE account if your company does not already have one you will need to do that. The work includes, but is not limited to, excavation and storage of spoils, demolition and installation of electrical power distribution, directional boring of telecom lines, and installation and leveling of gravel.
Attachments (1)?
- Download📎 Bid+Abstract+Final.pdfapplication/pdf · 2.2 MB
Other notices in this solicitation?
- SolicitationCONSTRUCT TOC PAD - ARLINGTON HEIGHTS IL - SolicitationSep 2, 2026
- SolicitationCONSTRUCT TOC PAD - ARLINGTON HEIGHTS IL - SolicitationAug 12, 2026
- SolicitationCONSTRUCT TOC PAD - ARLINGTON HEIGHTS IL - Pre-SolicitationAug 7, 2026
- PresolicitationCONSTRUCT TOC PAD - ARLINGTON HEIGHTS IL - Pre-SolicitationJul 1, 2026
- PresolicitationCONSTRUCT TOC PAD - ARLINGTON HEIGHTS IL - Pre-SolicitationJun 30, 2026
Similar open contracts
Metadata?
- Notice ID?
- d2d5db017b7841cb89499941bad27a1d
- Full path?
- DEPT OF DEFENSE.DEPT OF THE ARMY.W07V ENDIST ROCK ISLAND
- Office code?
- 021.2100.USACE.MVD.MVR.W912EK
- Ingested?
- Sep 11, 2026
- Updated?
- Sep 13, 2026