Combined Synopsis/SolicitationActive1333ND26QNB190295
NIST Boulder Sitewide Exterior Lighting Inspection and Repair
COMMERCE, DEPARTMENT OF / NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY / DEPT OF COMMERCE NISTKey dates?
- Posted?
- Jun 16, 2026
- Response deadline?
- Jul 21, 2026, 11:00 PM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- Total Small Business Set-Aside (FAR 19.5)
- Set-aside code?
- SBA
- PSC?
- Z1JZ
NAICS?
Issuing office?
- Department?
- COMMERCE, DEPARTMENT OF
- Sub-tier?
- NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
- Office?
- DEPT OF COMMERCE NIST
- Office code?
- 013.1341.1333ND
- Organization type?
- OFFICE
- Office address?
- GAITHERSBURG, MD, 20899, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Boulder
- State?
- Colorado
- Zip?
- 80305
- Country?
- UNITED STATES
Contacts?
- Lauren Lopezprimary
- Shawn Borisowsecondary
Description?
The contractor shall provide all labor, supervision, management, materials, tools, equipment, transportation, and incidentals necessary to perform monthly audits, inspections, maintenance, repair, replacement, and installation of exterior lighting systems at the NIST Boulder Campus and, as authorized, the Ft. Collins Radio Station. The scope includes all exterior lighting fixtures identified on the Site Exterior Lighting Map, including pole-mounted luminaires (120V and 277V), solar-powered lighting, walkway lighting, and bollards, as well as any additional exterior lighting discovered during performance. Monthly audits shall include inspection of 100% of fixtures during hours of darkness, documentation of deficiencies, and submission of reports identifying recommended corrective actions and cost estimates. Repair and replacement services shall be performed only upon written authorization from the Contracting Officer and may include installation of approved-equivalent lighting products meeting specified performance requirements. The contractor shall provide all necessary access equipment, comply with all applicable environmental and hazardous waste regulations, coordinate activities through the Contracting Officer’s Representative (COR), and perform work in a manner that minimizes disruption to ongoing research operations. Payment for repairs will be limited to authorized work within the contract scope and established funding limits. Important Dates: List of Individuals Attending the Site Visit: 7/2/2026 Site Visit: 7/7/2026 @ 1:30 Building 1 Entrance Questions Due: 7/9/2026 Proposals Due: 7/21/2026
Attachments (7)?
- Download📎 Att+05+NIST+Release+of+Claims.pdfapplication/pdf · 75 KB
- Download📎 Att+02+Copy+of+Safety+Plan+Checklist.xlsxapplication/octet-stream · 37 KB
- Download📎 Att+04+Site+Exterior+Lighting+Map.pdfapplication/pdf · 344 KB
- Download📎 Att+06+JHA+.xlsxapplication/octet-stream · 40 KB
- Download📎 ATT+01+NIST+Boulder+General+Contractor+Requirements+-+Rev+C.docxapplication/octet-stream · 606 KB
- Download📎 1333ND26QNB190295.pdfapplication/pdf · 9.1 MB
- Download📎 Att+03+Risk+Levels+for+Service+Contract+Personnel-Form.docapplication/octet-stream · 67 KB
Similar open contracts
Metadata?
- Notice ID?
- d2c465eae71c4e0b9f39cfe506ec3826
- Full path?
- COMMERCE, DEPARTMENT OF.NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY.DEPT OF COMMERCE NIST
- Office code?
- 013.1341.1333ND
- Ingested?
- Jun 17, 2026
- Updated?
- Jul 11, 2026