GovBidAlerts
← All opportunities

PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona

Key dates

Posted
Jul 15, 2026
Response deadline
Jul 27, 2026, 2:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
Women-Owned Small Business
Set-aside code
WOSB
PSC
P400

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W2V6 USA ENG SPT CTR HUNTSVIL
Office code
021.2100.USACE.SCO ALX.HNC.W912DY
Organization type
OFFICE
Office address
REDSTONE ARSENAL, AL, 35898-0000, USA

Place of performance

Street
Street 2
City
Yuma
State
Arizona
Zip
Country
UNITED STATES

Contacts

Description

The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
d163bbe08eee4f0cac774eb131a9a25e
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W2V6 USA ENG SPT CTR HUNTSVIL
Office code
021.2100.USACE.SCO ALX.HNC.W912DY
Ingested
Jul 16, 2026
Updated
Jul 17, 2026