GovBidAlerts
← All opportunities

X BAND KIT

Key dates

Posted
Jul 22, 2026
Response deadline
Jul 28, 2026, 3:00 PM UTC
Archive date
Archive type
auto15

Classification

Notice type
Sources Sought
Base type
Sources Sought
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Set-aside code
SBA
PSC
5985

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Office
FA4830 23 CONS CC
Office code
057.5700.ACC.FA4830
Organization type
OFFICE
Office address
MOODY AFB, GA, 31699-1700, USA

Place of performance

Street
Street 2
City
Moody AFB
State
Georgia
Zip
31699
Country
UNITED STATES

Contacts

Description

*THIS IS A SOURCES SOUGHT* The Panther II is a tri-band, man-portable Very Small Aperture Terminal (VSAT) system designed for high-speed data communications, including Internet access, VPN connectivity, and video transmission. This requirement focuses exclusively on the X-Band configuration, which is optimized for military satellite communications. The system is available with 60 cm and 96 cm parabolic reflector antennas and supports both manual and auto-acquisition modes. Its lightweight and rugged design allows for transport in a rucksack or airline-checkable hard case. This is a requirement aimed at enhancing tactical communication capabilities through the deployment of X-Band VSAT systems. Critical Performance Requirements and Risk Factors · High Data Throughput: The system must support data rates up to 3 Mbps transmit and 45 Mbps receive over X-Band frequencies. · Rapid Deployment: The system should allow for quick setup and acquisition, minimizing the time to establish communications. · Environmental Resilience: The equipment must operate effectively in temperatures ranging from -32°C to +50°C and withstand wind speeds up to 45 mph with proper anchoring. · Power Efficiency: The system should support power-saving features and operate on various power sources, including 10-48VDC and 90-264VAC. Risk Factors: · Environmental Conditions: Extreme temperatures and high wind speeds may affect system performance. · Power Supply Variability: Dependence on external power sources may pose challenges in remote locations. Quantities and Sustainment The initial procurement is for 1 Panther II X-Band system. Future sustainment will involve maintenance support, potential upgrades, and procurement of additional units based on operational needs.

Similar open contracts

Metadata

Notice ID
c3e637510cce4f40bb47297985739cb4
Full path
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA4830 23 CONS CC
Office code
057.5700.ACC.FA4830
Ingested
Jul 23, 2026
Updated
Jul 24, 2026