SolicitationActive73573
Argon Piping Supply, Installation and Testing
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / FERMILAB - DOE CONTRACTORKey dates?
- Posted?
- Jul 8, 2026
- Response deadline?
- Jul 27, 2026, 11:00 PM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- No Set aside used
- Set-aside code?
- NONE
- PSC?
- Y1JZ
NAICS?
Issuing office?
- Department?
- ENERGY, DEPARTMENT OF
- Sub-tier?
- ENERGY, DEPARTMENT OF
- Office?
- FERMILAB - DOE CONTRACTOR
- Office code?
- 089.8900.899034
- Organization type?
- OFFICE
- Office address?
- Batavia, IL, 60510, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Lead
- State?
- South Dakota
- Zip?
- 57754
- Country?
- UNITED STATES
Contacts?
- Jerry Kingprimary
- Susan Underwoodsecondary
Description?
July 8, 2026 - Attachment 1 is issued to provide questions and answers to the RFP. Documents are contented in the attachmed link. As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC. This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.
Attachments (17)?
- Download📎 RFP+Argon+Piping+R1+6.1.2026.docxapplication/octet-stream · 93 KB
- Download📎 J-10+South+Dakota+Wase+Determinatin+20260016.txtapplication/octet-stream · 13 KB
- Download📎 J-2+2025+INSURANCE+REQUIREMENTS+FOR+FRA+SUBCONTRACTED+WORK+AT+SURF+Risk+category+3+%28Rev+01.pdfapplication/pdf · 314 KB
- Download📎 K-4+FL-57B+%28Rev.+1-07%29.pdfapplication/pdf · 22 KB
- Download📎 K-3+FL-11_Rev1.pdfapplication/pdf · 332 KB
- Download📎 J-7+014100-8-2025-South+Dakota+Quality+Requirements.pdfapplication/pdf · 331 KB
- Download📎 J-4+SDSTA+Risk+Transfer+Protocol+Manual+Final+July+12+2024.pdfapplication/pdf · 3.4 MB
- Download📎 J-5+010010_General_Requirements_SD_4_2025_FFDG.docxapplication/octet-stream · 97 KB
- Download📎 J-3+Argon+Piping+Supply+and+Install+SOW+%282%29.docxapplication/octet-stream · 4.2 MB
- Download📎 J-1+FFDG+General+Terms+and+Conditions+for+Construction+at+SURF+%2808.2025%29.pdfapplication/pdf · 327 KB
- Download📎 K-2+SARC_Subcontractor+Annual+RepsCerts+Rev+4.pdfapplication/pdf · 362 KB
- Download📎 J-9+FL-55+Small+Business+Subcontracting+Plan+%28Rev.+6-23%29+14.0+-+Exhibit+III-G.pdfapplication/pdf · 392 KB
- Download📎 1.+RFP+Letter+6.1.2026+R1.docxapplication/octet-stream · 49 KB
- Download📎 K-1+PUR-466_Proposal+Certifications-.pdfapplication/pdf · 402 KB
- Download📎 J-6+013100_7-31-2025+FermiForward_South_Dakota.pdfapplication/pdf · 1.3 MB
- Download📎 J-11+Price+Sheet+including+Fully+Burdened+Hourly+Rate.xlsxapplication/octet-stream · 13 KB
- Download📎 J-6.1+7010_F1_Fermilab+Subcontractor+Safety+Information+Questionnaire.docxapplication/octet-stream · 42 KB
Other notices in this solicitation?
Similar open contracts
Metadata?
- Notice ID?
- bf37b159eab140d9bc6ba6b9d00e3949
- Full path?
- ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.FERMILAB - DOE CONTRACTOR
- Office code?
- 089.8900.899034
- Ingested?
- Jul 9, 2026
- Updated?
- Jul 11, 2026